| Thermoplastic, Standard, White | linear foot | $4.80 | $3.55 – $6.41 | 75 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Pull & splice box, f&i, 13 inch x 24 inch | each | $1,794 | $1,650 – $2,000 | 73 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Conduit, Furnish & Install | linear foot | $43.50 | $32.48 – $51.02 | 71 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Paint pavement marking | linear foot | $1.94 | $1.21 – $2.16 | 58 | Aug 27, 2025, Open bid tab, T4688 ↗ |
| Milling Existing Asphalt | square yard | $3.38 | $2.50 – $5.40 | 57 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Conduit, Furnish & Install, Open | linear foot | $24.23 | $19.16 – $30.00 | 52 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Concrete Sidewalk and | square yard | $90.00 | $70.00 – $110.00 | 48 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Prestressed Concrete Pole, F&I | each | $3,012 | $2,525 – $3,915 | 46 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Light Pole Complete, F&I | each | $11,000 | $9,880 – $12,269 | 45 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Sign Panel, Furnish & Install | each | $1,060 | $882.50 – $2,190 | 43 | Mar 25, 2026, Open bid tab, T4734 ↗ |
| Thermoplastic, Standard, White | each | $120.90 | $83.47 – $162.82 | 42 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Raised Pavement Marker, Type B | each | $5.04 | $4.30 – $5.93 | 42 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Lighting Conductors, F&I | linear foot | $4.95 | $3.45 – $6.00 | 39 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Thermoplastic, Preformed | each | $271.00 | $165.00 – $395.50 | 38 | Sep 24, 2025, Open bid tab, T4741 ↗ |
| Asphalt Concrete Friction | ton | $218.50 | $184.70 – $270.00 | 37 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Steel Mast Arm Assembly, Furnish | each | $77,400 | $66,251 – $93,721 | 37 | Mar 25, 2026, Open bid tab, T4734 ↗ |
| Electrical Service Disconnect | each | $1,986 | $813.04 – $3,805 | 36 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Electrical Service Wire, Furnish | linear foot | $11.71 | $8.25 – $15.40 | 36 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Superpave asphalt concrete | ton | $237.19 | $179.00 – $297.50 | 35 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Pipe Culvert,Optional | linear foot | $269.13 | $217.66 – $416.14 | 35 | Sep 24, 2025, Open bid tab, T4741 ↗ |
| Remove of existing concrete | square yard | $36.75 | $30.00 – $53.00 | 35 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Inlet Protection System | each | $154.00 | $130.00 – $260.50 | 33 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Paint pavement marking | each | $50.00 | $44.00 – $66.75 | 32 | Aug 27, 2025, Open bid tab, T4688 ↗ |
| Pole Cable Distribution System | each | $915.00 | $700.00 – $1,089 | 29 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Performance Turf, Sod | square yard | $7.25 | $5.40 – $12.69 | 29 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Traffic Control Officer | hour | $86.00 | $76.78 – $94.85 | 28 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Vehicle Detection System- Video | each | $6,538 | $2,814 – $10,785 | 28 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Traffic Separator Concrete | linear foot | $69.80 | $41.75 – $104.99 | 26 | Sep 24, 2025, Open bid tab, T4741 ↗ |
| Valve Boxes, Adjust | each | $731.09 | $598.75 – $825.00 | 26 | Aug 27, 2025, Open bid tab, T4688 ↗ |
| Concrete Curb & Gutter, Type F | linear foot | $51.41 | $41.24 – $59.50 | 26 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Detectable Warnings | square foot | $41.75 | $35.00 – $51.00 | 25 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Sediment Barrier | linear foot | $3.44 | $2.75 – $6.00 | 25 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Guardrail End Treatment | each | $3,000 | $1,700 – $3,450 | 25 | Jan 28, 2026, Open bid tab, T4749 ↗ |
| Type B Stabilization | square yard | $14.66 | $6.13 – $28.53 | 24 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Thermoplastic, Standard | linear foot | $4.00 | $3.60 – $4.95 | 23 | Aug 27, 2025, Open bid tab, T4688 ↗ |
| Thermoplastic, Preformed | linear foot | $19.00 | $17.75 – $20.90 | 23 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Prestressed Concrete Pole | each | $2,538 | $1,241 – $4,415 | 23 | Mar 25, 2026, Open bid tab, T4734 ↗ |
| Embankment | cubic yard | $49.75 | $29.26 – $70.14 | 22 | Sep 24, 2025, Open bid tab, T4741 ↗ |
| Pedestrian Detector, Furnish & | each | $569.29 | $463.79 – $775.00 | 22 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Manhole, p-7, <10' | each | $8,700 | $6,055 – $9,915 | 22 | Sep 24, 2025, Open bid tab, T4741 ↗ |
| Luminaire, F&I- Replace Existing | each | $1,864 | $1,496 – $2,200 | 22 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Temporary Barrier, Relocate | linear foot | $18.09 | $13.90 – $28.58 | 22 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Sign Panel, Remove, up to 12 SF | each | $90.00 | $77.00 – $155.09 | 21 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Fiber Optic Connection, Install | each | $65.00 | $54.50 – $90.00 | 21 | Dec 3, 2025, Open bid tab, T4717 ↗ |
| Aluminum signal pole, pedestal | each | $2,737 | $2,131 – $3,278 | 20 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Paint pavement marking | square foot | $2.74 | $2.04 – $4.41 | 20 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Internally Illuminated Sign | each | $4,057 | $3,357 – $4,744 | 20 | Mar 25, 2026, Open bid tab, T4734 ↗ |
| Fiber Optic Cable, F&I | linear foot | $4.95 | $4.50 – $5.84 | 20 | Dec 3, 2025, Open bid tab, T4717 ↗ |
| Pipe Culvert, Optional Material | linear foot | $275.00 | $187.98 – $604.00 | 20 | Jul 30, 2025, Open bid tab, T4648 ↗ |
| Guardrail remove | linear foot | $2.27 | $1.91 – $5.12 | 20 | Jan 28, 2026, Open bid tab, T4749 ↗ |
| Manhole, Adjust | each | $959.82 | $857.51 – $1,102 | 20 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Enhanced Highway Sign Assembly | each | $8,296 | $5,951 – $14,507 | 20 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Tree Protection Barrier | linear foot | $7.70 | $5.75 – $11.59 | 20 | Mar 25, 2026, Open bid tab, T4734 ↗ |
| Regular Excavation | cubic yard | $37.64 | $27.69 – $58.65 | 20 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Manhole, Adjust, Utilities | each | $1,000 | $850.00 – $1,143 | 20 | Aug 27, 2025, Open bid tab, T4728 ↗ |
| Object Marker, Type 1 | each | $278.30 | $229.27 – $306.08 | 20 | Jul 30, 2025, Open bid tab, T4648 ↗ |
| Tree Root And Branch Pruning | each | $1,000 | $650.00 – $2,750 | 19 | Jan 28, 2026, Open bid tab, T4749 ↗ |
| Pull & splice box, f&i, 24 inch x 36 inch | each | $3,270 | $3,023 – $3,500 | 17 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Fiber Optic Cable Locator | day | $190.00 | $145.00 – $260.00 | 17 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Load Center, F&I, Secondary | each | $16,418 | $15,060 – $19,850 | 16 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Concrete Curb Type D | linear foot | $47.34 | $36.73 – $77.04 | 16 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Light Pole Complete, Remove | each | $1,528 | $1,089 – $2,494 | 16 | Aug 26, 2026, Open bid tab, T4757 ↗ |
| Aluminum signal pole, remove | each | $500.00 | $291.03 – $633.64 | 15 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Pipe Culvert, Opt Material | linear foot | $565.00 | $384.00 – $860.00 | 15 | Sep 24, 2025, Open bid tab, T4741 ↗ |
| Managed Field Ethernet Switch | each | $6,500 | $4,890 – $7,874 | 15 | Mar 25, 2026, Open bid tab, T4734 ↗ |
| Green Colored Pavement | square foot | $10.00 | $9.45 – $11.00 | 15 | Aug 27, 2025, Open bid tab, T4688 ↗ |
| Traffic Monitoring Site | each | $2,883 | $2,193 – $4,000 | 14 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Temporary Barrier, F&I, Low | linear foot | $48.15 | $37.06 – $58.92 | 14 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Miscellaneous Asphalt Pavement | ton | $283.30 | $220.29 – $511.27 | 14 | Jan 28, 2026, Open bid tab, T4749 ↗ |
| Pedestrian Detector, Remove | each | $118.50 | $101.26 – $155.09 | 13 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Traffic Monitoring Site Vehicle | each | $2,316 | $2,153 – $3,400 | 13 | Jun 10, 2026, Open bid tab, T4766 ↗ |
| Lighting Conductors, Remove & | linear foot | $0.885 | $0.472 – $1.39 | 12 | Mar 25, 2026, Open bid tab, T4753 ↗ |
| Inlet, curb, type p-5, <10' | each | $11,000 | $9,592 – $13,696 | 12 | Aug 27, 2025, Open bid tab, T4688 ↗ |