| Milling Existing Asphalt | square yard | $5.20 | $3.46 – $9.90 | 77 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Thermoplastic, Standard, White | linear foot | $6.00 | $4.90 – $6.97 | 63 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Paint pavement marking | linear foot | $1.73 | $1.38 – $2.10 | 60 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Conduit, Furnish & Install | linear foot | $43.50 | $37.62 – $56.44 | 52 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Pipe Culvert,Optional | linear foot | $302.29 | $183.62 – $448.75 | 50 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Conduit, Furnish & Install, Open | linear foot | $28.00 | $20.00 – $42.85 | 45 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Thermoplastic, Preformed | each | $295.35 | $203.27 – $584.21 | 43 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Pull & splice box, f&i, 13 inch x 24 inch | each | $1,565 | $1,500 – $1,800 | 41 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Raised Pavement Marker, Type B | each | $4.81 | $4.00 – $5.75 | 40 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Concrete Sidewalk and | square yard | $98.25 | $82.75 – $137.43 | 38 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Thermoplastic, Standard, White | each | $102.00 | $75.52 – $180.00 | 37 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Paint pavement marking | each | $39.93 | $37.00 – $46.27 | 36 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Asphalt Concrete Friction | ton | $240.50 | $205.30 – $278.57 | 34 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Steel Mast Arm Assembly, Furnish | each | $92,417 | $85,074 – $112,298 | 34 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Vehicle Detection System | each | $10,000 | $2,761 – $13,403 | 33 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Inlet Protection System | each | $150.00 | $112.11 – $198.95 | 31 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Embankment | cubic yard | $47.33 | $16.48 – $81.91 | 30 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Remove of existing concrete | square yard | $54.16 | $34.02 – $80.21 | 28 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Litter remove | acre | $85.61 | $50.00 – $152.50 | 28 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Performance Turf, Sod | square yard | $7.50 | $5.40 – $9.61 | 27 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Detectable Warnings | square foot | $32.30 | $28.43 – $41.99 | 26 | Aug 18, 2026, Open bid tab, contract 26-c-00023-iitemized-bidtabu ↗ |
| Sediment Barrier | linear foot | $2.50 | $1.50 – $4.47 | 26 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Regular Excavation | cubic yard | $49.64 | $28.84 – $72.60 | 26 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Fiber Optic Connection, Install | each | $68.64 | $60.46 – $113.95 | 25 | May 20, 2026, Open bid tab, T7595 ↗ |
| Superpave asphalt concrete | ton | $198.22 | $152.62 – $220.00 | 24 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Prestressed Concrete Pole, F&I | each | $2,682 | $2,315 – $3,098 | 24 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Retroreflective Sign Strip | each | $105.70 | $85.85 – $136.83 | 23 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Traffic Control Officer | hour | $91.50 | $85.57 – $95.08 | 23 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Vehicle Detection System- Video | each | $11,000 | $6,330 – $29,670 | 23 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Fiber Optic Cable Locator | day | $268.50 | $183.29 – $334.00 | 23 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Thermoplastic, Preformed | linear foot | $16.50 | $15.89 – $18.29 | 22 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Mitered End Section, Optional | each | $2,609 | $1,950 – $3,142 | 21 | May 20, 2026, Open bid tab, T7595 ↗ |
| Type B Stabilization | square yard | $45.00 | $31.00 – $60.00 | 21 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Pipe Culvert, Opt Material | linear foot | $489.50 | $322.25 – $960.79 | 20 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Concrete Curb & Gutter, Type F | linear foot | $53.91 | $46.99 – $60.25 | 20 | Aug 18, 2026, Open bid tab, contract 26-c-00023-iitemized-bidtabu ↗ |
| Electrical Service Wire, Furnish | linear foot | $10.50 | $8.18 – $13.00 | 19 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Guardrail End Treatment | each | $3,064 | $2,090 – $3,698 | 19 | Jul 29, 2026, Open bid tab, T7619 ↗ |
| Itsfm Location Documentation | each | $2,683 | $2,336 – $3,465 | 19 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Sign Panel, Remove, up to 12 SF | each | $45.00 | $28.63 – $56.83 | 18 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Lighting Conductors, F&I | linear foot | $2.90 | $2.58 – $4.00 | 18 | May 20, 2026, Open bid tab, T7595 ↗ |
| Electrical Service Disconnect | each | $1,414 | $1,175 – $1,779 | 18 | May 20, 2026, Open bid tab, T7595 ↗ |
| Pedestrian Detector, Furnish & | each | $455.31 | $364.35 – $565.81 | 18 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Managed Field Ethernet Switch | each | $5,050 | $3,036 – $5,750 | 18 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Uninterruptible Power Supply | each | $11,518 | $6,350 – $14,250 | 18 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Paint pavement marking | square foot | $5.10 | $4.40 – $5.66 | 17 | May 20, 2026, Open bid tab, T7587 ↗ |
| Fiber Optic Cable, F&I | linear foot | $5.70 | $5.00 – $6.00 | 17 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Traffic Monitoring Site | each | $2,510 | $1,939 – $2,956 | 16 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Itsfm Subsurface | mile | $3,874 | $3,526 – $4,557 | 16 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Aluminum signal pole, pedestal | each | $2,797 | $2,370 – $2,926 | 15 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Thermoplastic, Standard | linear foot | $5.36 | $4.53 – $7.53 | 14 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Superpave asphalt concrete | ton | $195.22 | $162.58 – $251.50 | 14 | Jun 10, 2026, Open bid tab, T7534 ↗ |
| Pipe Culvert, Optional Material | linear foot | $251.82 | $175.00 – $809.04 | 13 | May 20, 2026, Open bid tab, T7595 ↗ |