| Thermoplastic, Standard, White | linear foot | $6.90 | $5.00 – $9.12 | 31 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Paint pavement marking | linear foot | $2.95 | $2.21 – $4.00 | 30 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Conduit, Furnish & Install | linear foot | $39.70 | $33.63 – $43.25 | 30 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Milling Existing Asphalt | square yard | $3.90 | $2.78 – $12.50 | 27 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pipe Culvert,Optional | linear foot | $297.84 | $186.30 – $533.03 | 26 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Signal Priority And Preemption | each | $8,810 | $7,648 – $9,822 | 24 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Concrete Curb & Gutter, Type F | linear foot | $60.36 | $48.09 – $80.94 | 24 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Detectable Warnings | square foot | $37.95 | $32.21 – $54.05 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Aluminum signal pole, pedestal | each | $2,691 | $2,175 – $3,014 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Traffic Control Officer | hour | $108.00 | $87.41 – $115.50 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Fiber Optic Cable Locator | day | $224.00 | $168.00 – $269.00 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Itsfm Subsurface | mile | $3,850 | $2,300 – $8,136 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Thermoplastic, Preformed | each | $245.00 | $172.00 – $380.00 | 22 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Thermoplastic, Standard, White | each | $147.00 | $93.75 – $181.50 | 22 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Concrete Sidewalk and | square yard | $95.12 | $85.00 – $116.00 | 21 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Uninterruptible Power Supply | each | $10,526 | $9,415 – $12,900 | 21 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pipe Culvert, Opt Material | linear foot | $707.36 | $319.00 – $968.89 | 20 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Steel Mast Arm Assembly, Furnish | each | $76,678 | $64,002 – $97,999 | 20 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Raised Pavement Marker, Type B | each | $5.10 | $5.00 – $5.56 | 20 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pull & splice box, f&i, 13 inch x 24 inch | each | $1,700 | $1,450 – $2,165 | 19 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Fiber Optic Cable, F&I | linear foot | $4.50 | $3.62 – $5.91 | 18 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Conduit, Furnish & Install, Open | linear foot | $22.31 | $18.60 – $28.18 | 18 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Paint pavement marking | each | $75.00 | $52.50 – $107.00 | 15 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Vehicle Detection System | each | $11,600 | $10,227 – $13,376 | 15 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Fiber Optic Connection, Install | each | $56.00 | $51.25 – $76.50 | 15 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Internally Illuminated Sign | each | $6,483 | $4,430 – $8,075 | 14 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Thermoplastic, Preformed | linear foot | $18.25 | $15.10 – $21.97 | 14 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Asphalt Concrete Friction | ton | $256.00 | $204.00 – $280.00 | 13 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Sign Panel, Furnish & Install | each | $889.66 | $605.00 – $1,050 | 13 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pedestrian Detector, Furnish & | each | $780.00 | $512.00 – $1,670 | 13 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Itsfm Location Documentation | each | $1,760 | $1,697 – $2,800 | 13 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Inlet Protection System | each | $150.00 | $136.25 – $216.75 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Mowing | acre | $98.75 | $88.50 – $231.25 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Paint pavement marking | square foot | $6.15 | $5.40 – $12.00 | 12 | Mar 25, 2026, Open bid tab, T5878 ↗ |
| Pull & splice box, f&i, 24 inch x 36 inch | each | $3,081 | $2,805 – $3,292 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Prestressed Concrete Pole, F&I | each | $2,530 | $2,385 – $3,184 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Remove of existing concrete | square yard | $33.50 | $25.87 – $44.42 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Electrical Service Wire, Furnish | linear foot | $7.70 | $6.26 – $10.00 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Performance Turf, Sod | square yard | $8.75 | $7.15 – $13.20 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Litter remove | acre | $65.44 | $53.75 – $98.12 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |