Street Lighting · awarded bid prices · Broward County
Pole Cable Distribution System: cost per each in Broward County, FL
The median awarded price is $915.00 per each, from 29 winning bids on 26 public projects in Broward County, FL (2023–2026). Half of the awarded prices fall between $700.00 and $1,089.
Cost by state › Florida › Broward County › Pole Cable Distribution System
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $612.50 in 2021 to $1,089 in 2026 (+78%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2021 | $612.50 | 8 |
| 2022 | $886.00 | 11 |
| 2023 | $805.60 | 8 |
| 2024 | $916.24 | 11 |
| 2025 | $775.89 | 12 |
| 2026 | $1,089 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Aug 26, 2026 | FDOT | 178 EA | $569.51 | Open bid tab, T4757 ↗ |
| Mar 25, 2026 | FDOT | 4 EA | $1,095 | Open bid tab, T4734 ↗ |
| Mar 25, 2026 | FDOT | 15 EA | $915.00 | Open bid tab, T4753 ↗ |
| Jan 28, 2026 | FDOT | 5 EA | $1,089 | Open bid tab, T4749 ↗ |
| Sep 24, 2025 | FDOT | 46 EA | $750.00 | Open bid tab, T4721 ↗ |
See every awarded price for this item on the Pole Cable Distribution System item page.
Related items in Broward County
- Pull & Splice Box, F&I, 13" x 24": $1,794 per each
- Conduit, Furnish & Install: $43.50 per linear foot
- Conduit, Furnish & Install, Open: $24.23 per linear foot
- Prestressed Concrete Pole, F&I: $3,012 per each
- Light Pole Complete, F&I: $11,000 per each
- Lighting Conductors, F&I: $4.95 per linear foot
- Electrical Service Disconnect: $1,986 per each
- Electrical Service Wire, Furnish: $11.71 per linear foot