ItemPerMedianMiddle halfWinning bidsLatest source document
Thermoplastic, Standard, Whitelinear foot$4.00$3.00 – $5.00102Sep 30, 2026, Open bid tab, T6398 ↗
Pull & splice box, f&i, 13 inch x 24 incheach$1,700$1,482 – $1,87494Sep 30, 2026, Open bid tab, T6398 ↗
Conduit, Furnish & Installlinear foot$39.50$30.00 – $47.9188Sep 30, 2026, Open bid tab, T6398 ↗
Paint pavement markinglinear foot$1.65$1.10 – $2.1675Sep 30, 2026, Open bid tab, T6398 ↗
Concrete Sidewalk andsquare yard$94.80$75.00 – $109.6071Sep 30, 2026, Open bid tab, T6398 ↗
Thermoplastic, Standard, Whiteeach$100.00$80.00 – $132.0061Sep 30, 2026, Open bid tab, T6398 ↗
Prestressed Concrete Pole, F&Ieach$2,973$2,551 – $3,47058Sep 30, 2026, Open bid tab, T6398 ↗
Steel Mast Arm Assembly, Furnisheach$80,000$69,000 – $89,25056Sep 30, 2026, Open bid tab, T6398 ↗
Sign Panel, Furnish & Installeach$1,000$661.50 – $1,32251Sep 30, 2026, Open bid tab, T6398 ↗
Milling Existing Asphaltsquare yard$5.00$3.52 – $8.0050Sep 30, 2026, Open bid tab, T6398 ↗
Raised Pavement Marker, Type Beach$5.08$4.00 – $6.0049Sep 30, 2026, Open bid tab, T6398 ↗
Vehicle Detection System- Videoeach$4,721$3,500 – $6,21545Sep 30, 2026, Open bid tab, T6613 ↗
Lighting Conductors, F&Ilinear foot$4.65$3.33 – $5.8744Sep 30, 2026, Open bid tab, T6398 ↗
Electrical Service Wire, Furnishlinear foot$10.00$10.00 – $12.1544Sep 30, 2026, Open bid tab, T6398 ↗
Asphalt Concrete Frictionton$238.00$194.56 – $265.5643Sep 30, 2026, Open bid tab, T6398 ↗
Pedestrian Detector, Furnish &each$540.00$388.25 – $701.0043Sep 30, 2026, Open bid tab, T6398 ↗
Thermoplastic, Preformedlinear foot$19.29$17.00 – $21.4639Sep 30, 2026, Open bid tab, T6398 ↗
Pull & Splice Box, Installeach$1,076$1,000 – $1,23739Sep 30, 2026, Open bid tab, T6398 ↗
Paint pavement markingeach$55.50$45.15 – $85.7536Sep 30, 2026, Open bid tab, T6398 ↗
Pull & splice box, f&i, 24 inch x 36 incheach$2,649$2,488 – $3,20036Sep 30, 2026, Open bid tab, T6398 ↗
Remove of existing concretesquare yard$36.50$29.38 – $48.8636Sep 30, 2026, Open bid tab, T6398 ↗
Concrete Curb & Gutter, Type Flinear foot$50.00$43.50 – $64.6736Sep 30, 2026, Open bid tab, T6398 ↗
Detectable Warningssquare foot$44.00$35.00 – $46.5835Sep 30, 2026, Open bid tab, T6398 ↗
Inlet Protection Systemeach$150.00$105.00 – $250.0035Sep 30, 2026, Open bid tab, T6398 ↗
Sign Panel, Remove, up to 12 SFeach$100.00$71.25 – $150.0035Sep 30, 2026, Open bid tab, T6398 ↗
Traffic Control Officerhour$82.15$75.50 – $89.7534Sep 30, 2026, Open bid tab, T6398 ↗
Manhole, Adjusteach$955.00$850.00 – $1,25033Sep 30, 2026, Open bid tab, T6398 ↗
Aluminum signal pole, pedestaleach$2,235$1,975 – $2,70632Sep 30, 2026, Open bid tab, T6398 ↗
Superpave asphalt concreteton$324.62$190.00 – $500.0032Sep 30, 2026, Open bid tab, T6398 ↗
Pipe Culvert,Optionallinear foot$416.00$263.44 – $561.0032Sep 30, 2026, Open bid tab, T6398 ↗
Thermoplastic, Preformedeach$300.14$257.50 – $525.0031Sep 30, 2026, Open bid tab, T6398 ↗
Pole Cable Distribution Systemeach$1,000$823.75 – $1,87531Sep 30, 2026, Open bid tab, T6398 ↗
Thermoplastic, Standardlinear foot$4.00$3.37 – $5.2630Sep 30, 2026, Open bid tab, T6398 ↗
Tree Protection Barrierlinear foot$10.00$8.00 – $14.3529Sep 30, 2026, Open bid tab, T6398 ↗
Performance Turf, Sodsquare yard$11.00$7.50 – $15.0029Sep 30, 2026, Open bid tab, T6398 ↗
Paint pavement markingsquare foot$4.70$2.26 – $7.3628Mar 25, 2026, Open bid tab, T6589 ↗
Electrical Service Disconnecteach$1,770$765.12 – $3,46728Sep 30, 2026, Open bid tab, T6398 ↗
Electrical Service Wire, Removelinear foot$1.00$0.6 – $1.0028Sep 30, 2026, Open bid tab, T6398 ↗
Enhanced Highway Sign Assemblyeach$12,250$9,000 – $16,20928Sep 30, 2026, Open bid tab, T6398 ↗
Aluminum signal pole, removeeach$300.00$250.00 – $587.9026Sep 30, 2026, Open bid tab, T6398 ↗
Internally Illuminated Signeach$3,500$3,000 – $4,50026Sep 30, 2026, Open bid tab, T6613 ↗
Lighting Conductors, Remove &linear foot$0.5$0.3 – $1.0326Sep 30, 2026, Open bid tab, T6398 ↗
Pedestrian Detector, Removeeach$98.67$51.95 – $134.5325Sep 30, 2026, Open bid tab, T6398 ↗
Traffic Monitoring Site Cabineteach$6,370$4,500 – $7,80025Mar 26, 2025, Open bid tab, T6601 ↗
Guardrail Transition Connectioneach$3,177$2,184 – $3,86524Sep 30, 2026, Open bid tab, T6398 ↗
Prestressed Concrete Poleeach$750.00$722.79 – $850.0023Sep 30, 2026, Open bid tab, T6398 ↗
Miscellaneous Asphalt Pavementton$600.00$440.50 – $962.5023Sep 30, 2026, Open bid tab, T6398 ↗
Light Pole Complete, Removeeach$1,000$913.11 – $1,25423Sep 30, 2026, Open bid tab, T6398 ↗
Light Pole Complete, F&Ieach$11,440$8,825 – $13,85522Sep 30, 2026, Open bid tab, T6398 ↗
Load Center, F&I, Secondaryeach$19,788$16,500 – $23,00021Sep 30, 2026, Open bid tab, T6398 ↗
Luminaire, F&I- Replace Existingeach$1,850$1,500 – $2,50021Sep 30, 2026, Open bid tab, T6398 ↗
Guardrail -Roadway, General TL-3linear foot$28.07$24.02 – $33.0020Sep 30, 2026, Open bid tab, T6398 ↗
Inlet, curb, type p-5, <10'each$8,150$7,325 – $9,77520Sep 30, 2026, Open bid tab, T6398 ↗
Guardrail End Treatmenteach$3,081$1,827 – $3,53220Sep 30, 2026, Open bid tab, T6398 ↗
Optional Base, Base Group 09square yard$44.04$36.00 – $65.3820Sep 30, 2026, Open bid tab, T6613 ↗
Sign Panel, Relocate, Up To 12 Sfeach$375.00$175.00 – $408.7519Sep 30, 2026, Open bid tab, T6398 ↗
Vehicle Detection Systemeach$9,925$5,214 – $12,10819Sep 30, 2026, Open bid tab, T6398 ↗
Retroreflective Sign Stripeach$125.00$107.50 – $175.0019Sep 30, 2026, Open bid tab, T6398 ↗
Delineator, Flexible Tubulareach$103.90$97.50 – $110.5519Sep 30, 2026, Open bid tab, T6613 ↗
Traffic Monitoring Siteeach$2,573$2,231 – $3,30918Jul 29, 2026, Open bid tab, T6595 ↗
Concrete Curb Type Dlinear foot$50.00$40.73 – $85.9818Sep 30, 2026, Open bid tab, T6398 ↗
Traffic Monitoring Site Vehicleeach$2,500$2,122 – $3,00017Jul 29, 2026, Open bid tab, T6595 ↗
Network Device, Cellular Modemeach$3,000$2,239 – $3,56816Apr 30, 2025, Open bid tab, T6606 ↗
Steel Mast Arm Assembly,each$3,989$3,456 – $5,25016Sep 30, 2026, Open bid tab, T6613 ↗
Traffic Separator Concretelinear foot$125.00$86.40 – $157.5015Sep 30, 2026, Open bid tab, T6398 ↗
Loop Detector Inductive, F&I,each$350.00$313.36 – $561.2815Jul 29, 2026, Open bid tab, T6595 ↗
Vehicular Signal Auxiliaries,each$600.00$458.54 – $742.2515Mar 25, 2026, Open bid tab, T6591 ↗
Tree Root And Branch Pruningeach$1,260$815.00 – $1,81015Sep 30, 2026, Open bid tab, T6398 ↗
Guardrail removelinear foot$3.24$2.00 – $10.0013Sep 30, 2026, Open bid tab, T6398 ↗
Temporary Barrier, F&I, Lowlinear foot$52.87$36.75 – $56.2312Sep 30, 2026, Open bid tab, T6398 ↗
Utility Fixture, Valve Assembly,each$2,408$991.18 – $4,20312Sep 30, 2026, Open bid tab, T6398 ↗
Optional Base, Base Group 11square yard$60.00$54.75 – $86.1212Sep 30, 2026, Open bid tab, T6398 ↗