| Thermoplastic, Standard, White | linear foot | $5.00 | $3.55 – $6.60 | 59 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Conduit, Furnish & Install | linear foot | $44.39 | $35.00 – $50.84 | 54 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Paint pavement marking | linear foot | $1.91 | $1.76 – $3.00 | 48 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Concrete Sidewalk and | square yard | $90.00 | $71.96 – $122.50 | 39 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Thermoplastic, Preformed | each | $215.00 | $157.65 – $274.45 | 38 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Steel Mast Arm Assembly, Furnish | each | $83,883 | $66,831 – $104,916 | 38 | May 20, 2026, Open bid tab, T4666 ↗ |
| Milling Existing Asphalt | square yard | $3.50 | $3.00 – $4.62 | 36 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Thermoplastic, Standard, White | each | $97.70 | $75.60 – $147.62 | 33 | May 20, 2026, Open bid tab, T4666 ↗ |
| Conduit, Furnish & Install, Open | linear foot | $21.30 | $15.00 – $29.44 | 30 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Pipe Culvert,Optional | linear foot | $210.00 | $172.00 – $332.00 | 29 | May 20, 2026, Open bid tab, T4666 ↗ |
| Raised Pavement Marker, Type B | each | $4.31 | $4.00 – $5.00 | 29 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Pull & splice box, f&i, 13 inch x 24 inch | each | $1,744 | $1,497 – $2,126 | 27 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Asphalt Concrete Friction | ton | $203.00 | $185.00 – $240.00 | 25 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Multi-column Ground Sign | each | $6,500 | $2,000 – $9,000 | 25 | May 20, 2026, Open bid tab, T4666 ↗ |
| Paint pavement marking | each | $40.61 | $38.50 – $47.79 | 24 | May 20, 2026, Open bid tab, T4666 ↗ |
| Prestressed Concrete Pole, F&I | each | $2,946 | $2,285 – $3,739 | 24 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Inlet Protection System | each | $169.00 | $138.75 – $249.78 | 22 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Lighting Conductors, F&I | linear foot | $3.80 | $2.66 – $5.36 | 22 | May 20, 2026, Open bid tab, T4666 ↗ |
| Detectable Warnings | square foot | $46.20 | $44.14 – $50.00 | 21 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Remove of existing concrete | square yard | $40.00 | $30.00 – $56.88 | 21 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Pull & splice box, f&i, 17 inch x 30 inch | each | $1,674 | $1,410 – $2,000 | 21 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Concrete Curb & Gutter, Type F | linear foot | $53.35 | $45.00 – $70.00 | 21 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Performance Turf, Sod | square yard | $7.75 | $4.00 – $12.00 | 21 | May 20, 2026, Open bid tab, T4666 ↗ |
| Fiber Optic Cable, F&I | linear foot | $4.97 | $4.26 – $6.00 | 20 | May 20, 2026, Open bid tab, T4666 ↗ |
| Traffic Control Officer | hour | $89.50 | $87.25 – $100.60 | 20 | May 20, 2026, Open bid tab, T4666 ↗ |
| Electrical Service Wire, Furnish | linear foot | $11.15 | $9.43 – $13.08 | 19 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Sediment Barrier | linear foot | $3.41 | $2.46 – $4.22 | 19 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Embankment | cubic yard | $53.50 | $30.62 – $97.92 | 18 | May 20, 2026, Open bid tab, T4666 ↗ |
| Junction Box, Furnish & Install, | each | $1,299 | $1,041 – $1,305 | 18 | May 20, 2026, Open bid tab, T4666 ↗ |
| Pole Cable Distribution System | each | $1,052 | $807.87 – $1,143 | 18 | May 20, 2026, Open bid tab, T4666 ↗ |
| Pedestrian Detector, Furnish & | each | $455.27 | $370.25 – $644.48 | 18 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Pipe Culvert, Opt Material | linear foot | $350.00 | $255.00 – $400.00 | 17 | May 20, 2026, Open bid tab, T4666 ↗ |
| Internally Illuminated Sign | each | $3,768 | $2,471 – $4,500 | 17 | May 20, 2026, Open bid tab, T4666 ↗ |
| Fiber Optic Connection, Install | each | $70.00 | $60.00 – $110.00 | 17 | May 20, 2026, Open bid tab, T4666 ↗ |
| Thermoplastic, Preformed | linear foot | $16.59 | $15.94 – $19.21 | 16 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Guardrail End Treatment | each | $3,122 | $1,739 – $3,511 | 16 | May 20, 2026, Open bid tab, T4666 ↗ |
| Green Colored Pavement | square foot | $9.59 | $8.00 – $13.36 | 16 | May 20, 2026, Open bid tab, T4666 ↗ |
| Aluminum signal pole, pedestal | each | $2,743 | $2,401 – $2,989 | 15 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Thermoplastic, Standard | linear foot | $4.70 | $4.48 – $5.00 | 15 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Light Pole Complete, F&I | each | $9,836 | $8,472 – $12,382 | 15 | May 20, 2026, Open bid tab, T4666 ↗ |
| Aluminum signal pole, remove | each | $433.14 | $300.02 – $508.71 | 14 | Jul 29, 2026, Open bid tab, T4747 ↗ |
| Superpave asphalt concrete | ton | $210.01 | $188.48 – $229.62 | 14 | May 20, 2026, Open bid tab, T4666 ↗ |
| Loop Detector Inductive, F&I, | each | $537.63 | $455.17 – $849.12 | 14 | Jul 29, 2026, Open bid tab, T4747 ↗ |