Construction unit costs in Florida
Median awarded unit prices for the 36 most-bid items on Florida public projects, from winning bids in agency bid tabulations.
| Item | Per | Median | Middle half | Winning bids |
|---|---|---|---|---|
| Thermoplastic, Standard, White | linear foot | $6.25 | $4.74 – $8.62 | 1,228 |
| Milling Existing Asphalt | square yard | $4.00 | $2.74 – $6.94 | 1,209 |
| Painted Pavement Markings | linear foot | $2.20 | $1.70 – $3.30 | 1,113 |
| Raised Pavement Marker, Type B | each | $5.11 | $4.50 – $6.15 | 803 |
| Conduit, Furnish & Install | linear foot | $40.00 | $31.00 – $50.00 | 802 |
| Thermoplastic, Standard, White | each | $120.00 | $88.00 – $200.00 | 718 |
| Concrete Sidewalk and | square yard | $96.55 | $76.53 – $133.16 | 702 |
| Pull & Splice Box, F&I, 13" x 24" | each | $1,700 | $1,440 – $1,949 | 659 |
| Asphalt Concrete Friction | ton | $201.57 | $176.31 – $250.00 | 596 |
| Conduit, Furnish & Install, Open | linear foot | $21.92 | $16.80 – $29.11 | 567 |
| Pipe Culvert,Optional | linear foot | $250.00 | $167.10 – $401.14 | 563 |
| Painted Pavement Markings | each | $52.08 | $42.00 – $77.00 | 560 |
| Thermoplastic, Preformed | each | $225.00 | $159.49 – $350.00 | 545 |
| Performance Turf, Sod | square yard | $6.10 | $4.00 – $10.00 | 478 |
| Litter Removal | acre | $67.88 | $39.82 – $150.00 | 465 |
| Mowing | acre | $96.00 | $50.00 – $200.50 | 459 |
| Inlet Protection System | each | $180.90 | $138.19 – $250.00 | 456 |
| Removal of Existing Concrete | square yard | $43.47 | $30.25 – $69.84 | 440 |
| Steel Mast Arm Assembly, Furnish | each | $90,000 | $75,000 – $117,150 | 419 |
| Sediment Barrier | linear foot | $3.37 | $2.02 – $5.50 | 417 |
| Traffic Control Officer | hour | $95.00 | $81.25 – $110.00 | 397 |
| Detectable Warnings | square foot | $40.43 | $32.25 – $50.00 | 377 |
| Mitered End Section, Optional | each | $3,530 | $2,800 – $5,300 | 373 |
| Thermoplastic, Preformed | linear foot | $17.45 | $15.40 – $20.00 | 366 |
| Prestressed Concrete Pole, F&I | each | $2,700 | $2,327 – $3,282 | 359 |
| Concrete Curb & Gutter, Type F | linear foot | $53.92 | $43.00 – $73.24 | 340 |
| Regular Excavation | cubic yard | $38.20 | $20.34 – $74.50 | 338 |
| Thermoplastic, Standard | linear foot | $5.85 | $4.80 – $7.63 | 335 |
| Type B Stabilization | square yard | $23.10 | $9.97 – $38.81 | 323 |
| Guardrail End Treatment | each | $3,272 | $2,000 – $3,882 | 322 |
| Superpave Asphaltic Concrete | ton | $171.00 | $148.88 – $224.00 | 313 |
| Pedestrian Detector, Furnish & | each | $515.00 | $400.00 – $991.86 | 307 |
| Electrical Service Wire, Furnish | linear foot | $10.18 | $8.00 – $13.36 | 306 |
| Painted Pavement Markings | square foot | $5.40 | $4.24 – $7.83 | 306 |
| Superpave Asphaltic Conc | ton | $200.00 | $150.00 – $300.00 | 289 |
| Embankment | cubic yard | $42.87 | $20.21 – $76.08 | 287 |
Prices by county in Florida
- Alachua County: 13 items
- Bay County: 21 items
- Brevard County: 41 items
- Broward County: 73 items
- Clay County: 4 items
- Columbia County: 2 items
- Duval County: 69 items
- Escambia County: 32 items
- Flagler County: 1 items
- Hillsborough County: 52 items
- Indian River County: 2 items
- Jackson County: 3 items
- Lake County: 5 items
- Lee County: 13 items
- Leon County: 14 items
- Levy County: 2 items
- Manatee County: 10 items
- Marion County: 8 items
- Miami-dade County: 72 items
- Monroe County: 2 items
- Nassau County: 3 items
- Okaloosa County: 6 items
- Orange County: 40 items
- Palm Beach County: 43 items
- Pasco County: 9 items
- Pinellas County: 25 items
- Polk County: 22 items
- Sarasota County: 4 items
- St. Johns County: 3 items
- St. Lucie County: 3 items
- Suwannee County: 1 items
- Volusia County: 24 items
- Walton County: 1 items
Agencies in Florida
- City of Tampa: 6,221 winning prices
- FDOT: 329,989 winning prices