| Paint pavement marking | linear foot | $2.49 | $1.85 – $3.20 | 103 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Standard, White | linear foot | $6.50 | $5.00 – $9.00 | 99 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Milling Existing Asphalt | square yard | $5.00 | $3.19 – $6.99 | 94 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Raised Pavement Marker, Type B | each | $5.20 | $5.00 – $6.50 | 69 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Standard, White | each | $137.03 | $95.00 – $200.00 | 61 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Concrete Sidewalk and | square yard | $91.62 | $72.70 – $123.25 | 50 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Preformed | each | $228.00 | $152.00 – $318.75 | 50 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Paint pavement marking | each | $60.00 | $49.00 – $85.00 | 49 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Asphalt Concrete Friction | ton | $225.44 | $197.92 – $264.17 | 39 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Guardrail Transition Connection | each | $3,500 | $2,998 – $4,050 | 39 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Conduit, Furnish & Install | linear foot | $37.50 | $29.70 – $48.00 | 37 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Prestressed Concrete Pole, F&I | each | $2,222 | $1,806 – $3,000 | 35 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Litter remove | acre | $140.10 | $96.00 – $312.50 | 35 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Mowing | acre | $218.80 | $117.50 – $391.59 | 34 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Pull & splice box, f&i, 13 inch x 24 inch | each | $1,585 | $1,458 – $1,713 | 34 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Conduit, Furnish & Install, Open | linear foot | $21.88 | $17.00 – $31.00 | 34 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Temporary Barrier, Relocate | linear foot | $15.00 | $12.00 – $17.50 | 33 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Inlet Protection System | each | $200.00 | $128.75 – $226.00 | 32 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Remove of existing concrete | square yard | $50.00 | $37.21 – $82.50 | 32 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Superpave asphalt concrete | ton | $207.45 | $184.25 – $243.44 | 32 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Performance Turf, Sod | square yard | $9.35 | $4.46 – $19.25 | 32 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Vehicle Detection System | each | $12,500 | $11,092 – $19,679 | 31 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Electrical Service Wire, Furnish | linear foot | $9.35 | $7.08 – $11.54 | 31 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Embankment | cubic yard | $57.95 | $32.25 – $99.59 | 30 | Jun 10, 2026, Open bid tab, T2A47 ↗ |
| Thermoplastic, Standard | linear foot | $6.00 | $5.50 – $7.00 | 30 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Preformed | linear foot | $15.00 | $14.00 – $20.00 | 30 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Traffic Control Officer | hour | $105.00 | $95.00 – $125.00 | 29 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Electrical Service Disconnect | each | $1,484 | $1,150 – $2,022 | 28 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Guardrail -Roadway, General TL-3 | linear foot | $28.35 | $25.70 – $32.08 | 27 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Fiber Optic Cable Locator | day | $275.00 | $163.41 – $395.00 | 27 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Concrete Curb & Gutter, Type F | linear foot | $67.50 | $53.00 – $89.50 | 27 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Detectable Warnings | square foot | $45.00 | $40.61 – $56.75 | 26 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Miscellaneous Asphalt Pavement | ton | $550.57 | $360.53 – $700.00 | 26 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Temporary Barrier, F&I, Low | linear foot | $48.65 | $37.85 – $55.00 | 25 | Jan 28, 2026, Open bid tab, T2A54 ↗ |
| Pipe Culvert,Optional | linear foot | $334.00 | $203.25 – $750.00 | 24 | Jan 28, 2026, Open bid tab, T2A56 ↗ |
| Sediment Barrier | linear foot | $3.25 | $1.40 – $4.54 | 24 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Paint pavement marking | square foot | $6.30 | $5.00 – $10.00 | 23 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Pull & splice box, f&i, 24 inch x 36 inch | each | $2,720 | $2,533 – $3,020 | 23 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Pedestrian Detector, Furnish & | each | $421.00 | $348.22 – $504.00 | 23 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Pipe Culvert, Opt Material | linear foot | $450.00 | $250.00 – $1,092 | 21 | Jan 28, 2026, Open bid tab, T2A56 ↗ |
| Pipe Culvert, Optional Material | linear foot | $250.00 | $170.00 – $500.00 | 21 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Manhole, Adjust | each | $1,900 | $1,536 – $2,000 | 21 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Valve Boxes, Adjust | each | $1,312 | $1,050 – $1,700 | 21 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Tubular marker, durable, 36 inch | each | $205.00 | $200.00 – $258.75 | 21 | May 22, 2024, Open bid tab, T2979 ↗ |
| Business Sign | each | $45.00 | $30.00 – $50.42 | 21 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Sign Panel, Remove, up to 12 SF | each | $76.88 | $50.00 – $126.25 | 20 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Loop Detector Inductive, F&I, | each | $436.00 | $367.63 – $477.50 | 20 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Steel Mast Arm Assembly, Furnish | each | $81,700 | $75,000 – $93,638 | 20 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Object Marker, Type 1 | each | $269.38 | $237.00 – $288.75 | 20 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Aluminum signal pole, pedestal | each | $3,000 | $2,727 – $3,400 | 19 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Manhole, Adjust, Utilities | each | $1,800 | $1,537 – $2,000 | 19 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Guardrail End Treatment | each | $3,275 | $3,050 – $4,240 | 18 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Retroreflective Sign Strip | each | $95.00 | $80.00 – $110.00 | 17 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Type B Stabilization | square yard | $42.00 | $33.50 – $75.00 | 17 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Pedestrian Detector, Remove | each | $100.47 | $65.00 – $157.53 | 16 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Aluminum signal pole, remove | each | $544.00 | $463.39 – $820.00 | 16 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Internally Illuminated Sign | each | $6,424 | $5,280 – $7,217 | 16 | Jan 28, 2026, Open bid tab, T2A56 ↗ |
| Fiber Optic Connection, Install | each | $81.41 | $65.52 – $95.05 | 16 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Aluminum signal pole, furnish & | each | $2,797 | $2,252 – $3,025 | 16 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Regular Excavation | cubic yard | $48.00 | $37.00 – $75.00 | 15 | Jun 10, 2026, Open bid tab, T2A47 ↗ |
| Borrow Excavation, Truck | cubic yard | $57.50 | $46.25 – $80.05 | 14 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Fiber Optic Cable, F&I | linear foot | $4.43 | $4.00 – $5.73 | 14 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Delineator, Flexible Tubular | each | $125.00 | $105.00 – $150.00 | 13 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Traffic Separator Concrete | linear foot | $83.24 | $54.84 – $177.50 | 12 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Mitered End Section, Optional | each | $3,750 | $3,146 – $5,000 | 12 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Managed Field Ethernet Switch | each | $4,607 | $4,155 – $5,074 | 12 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Guardrail remove | linear foot | $3.30 | $2.50 – $10.35 | 12 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Optional Base, Base Group 09 | square yard | $97.50 | $80.00 – $131.53 | 12 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Concrete Curb & Gutter, Type E | linear foot | $68.00 | $44.08 – $75.75 | 12 | Aug 26, 2026, Open bid tab, T2A78 ↗ |