Street Lighting · awarded bid prices · Broward County
Prestressed Concrete Pole, F&I: cost per each in Broward County, FL
The median awarded price is $3,012 per each, from 46 winning bids on 26 public projects in Broward County, FL (2024–2026). Half of the awarded prices fall between $2,525 and $3,915.
Cost by state › Florida › Broward County › Prestressed Concrete Pole, F&I
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $2,140 in 2020 to $2,971 in 2025 (+39%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2020 | $2,140 | 6 |
| 2021 | $1,851 | 12 |
| 2022 | $2,200 | 13 |
| 2023 | $2,500 | 7 |
| 2024 | $3,025 | 18 |
| 2025 | $2,971 | 24 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Aug 26, 2026 | FDOT | 2 EA | $1,491 | Open bid tab, T4757 ↗ |
| Mar 25, 2026 | FDOT | 6 EA | $2,646 | Open bid tab, T4734 ↗ |
| Mar 25, 2026 | FDOT | 1 EA | $3,150 | Open bid tab, T4753 ↗ |
| Dec 3, 2025 | FDOT | 8 EA | $2,800 | Open bid tab, T4717 ↗ |
| Sep 24, 2025 | FDOT | 2 EA | $2,500 | Open bid tab, T4721 ↗ |
The same item across Florida: statewide figures. See every awarded price for this item on the Prestressed Concrete Pole, F&I item page.
Related items in Broward County
- Pull & Splice Box, F&I, 13" x 24": $1,794 per each
- Conduit, Furnish & Install: $43.50 per linear foot
- Conduit, Furnish & Install, Open: $24.23 per linear foot
- Light Pole Complete, F&I: $11,000 per each
- Lighting Conductors, F&I: $4.95 per linear foot
- Electrical Service Disconnect: $1,986 per each
- Electrical Service Wire, Furnish: $11.71 per linear foot
- Pole Cable Distribution System: $915.00 per each