Construction unit costs in Polk County, FL

Median awarded unit prices for 22 items on public projects in Polk County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Florida › Polk County

ItemPerMedianMiddle halfWinning bidsLatest source document
Thermoplastic, Standard, Whitelinear foot$6.08$4.67 – $7.7241Mar 25, 2026, Open bid tab, T1928 ↗
Milling Existing Asphaltsquare yard$4.91$3.31 – $9.5840Mar 25, 2026, Open bid tab, T1928 ↗
Paint pavement markinglinear foot$1.87$1.65 – $2.3533Aug 27, 2025, Open bid tab, T1918 ↗
Raised Pavement Marker, Type Beach$4.96$4.07 – $5.3026Mar 25, 2026, Open bid tab, T1928 ↗
Concrete Sidewalk andsquare yard$90.42$79.23 – $114.1024Mar 25, 2026, Open bid tab, T1928 ↗
Multi-column Ground Signeach$6,170$2,018 – $8,40523Aug 27, 2025, Open bid tab, T1918 ↗
Conduit, Furnish & Install, Openlinear foot$22.86$17.27 – $28.1922Mar 25, 2026, Open bid tab, T1928 ↗
Conduit, Furnish & Installlinear foot$36.50$29.42 – $44.6421Mar 25, 2026, Open bid tab, T1928 ↗
Pull & splice box, f&i, 13 inch x 24 incheach$1,860$1,527 – $1,94921Mar 25, 2026, Open bid tab, T1928 ↗
Asphalt Concrete Frictionton$203.52$189.11 – $216.5918Mar 25, 2026, Open bid tab, T1928 ↗
Pipe Culvert,Optionallinear foot$214.15$152.94 – $307.7118Aug 27, 2025, Open bid tab, T1918 ↗
Thermoplastic, Standard, Whiteeach$90.30$73.03 – $132.0917Mar 25, 2026, Open bid tab, T1928 ↗
Thermoplastic, Preformedeach$247.91$137.61 – $350.0016Aug 27, 2025, Open bid tab, T1918 ↗
Embankmentcubic yard$63.04$43.36 – $103.5115Mar 25, 2026, Open bid tab, T1928 ↗
Sediment Barrierlinear foot$1.58$1.25 – $2.0315Mar 25, 2026, Open bid tab, T1928 ↗
Performance Turf, Sodsquare yard$5.29$4.75 – $6.6915Mar 25, 2026, Open bid tab, T1928 ↗
Paint pavement markingeach$39.41$32.47 – $49.5314Aug 27, 2025, Open bid tab, T1918 ↗
Remove of existing concretesquare yard$44.48$31.60 – $73.3414Mar 25, 2026, Open bid tab, T1928 ↗
Regular Excavationcubic yard$62.09$42.50 – $140.1514Mar 25, 2026, Open bid tab, T1928 ↗
Inlet Protection Systemeach$168.02$123.94 – $233.7813Mar 25, 2026, Open bid tab, T1928 ↗
Litter removeacre$60.00$51.00 – $200.0013Mar 25, 2026, Open bid tab, T1928 ↗
Guardrail End Treatmenteach$3,277$1,506 – $3,68612Jul 30, 2025, Open bid tab, T1921 ↗