Other · awarded bid prices · Miami-dade County
Steel Mast Arm Assembly,: cost per each in Miami-dade County, FL
The median awarded price is $3,989 per each, from 16 winning bids on 15 public projects in Miami-dade County, FL (2023–2026). Half of the awarded prices fall between $3,456 and $5,250.
Cost by state › Florida › Miami-dade County › Steel Mast Arm Assembly,
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $3,250 in 2020 to $3,800 in 2026 (+17%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2020 | $3,250 | 12 |
| 2021 | $2,000 | 9 |
| 2022 | $3,468 | 9 |
| 2023 | $3,606 | 5 |
| 2024 | $5,000 | 6 |
| 2026 | $3,800 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 30, 2026 | FDOT | 2 EA | $4,000 | Open bid tab, T6613 ↗ |
| Sep 30, 2026 | FDOT | 2 EA | $765.50 | Open bid tab, T6398 ↗ |
| Mar 25, 2026 | FDOT | 16 EA | $3,000 | Open bid tab, T6589 ↗ |
| Mar 25, 2026 | FDOT | 1 EA | $3,800 | Open bid tab, T6591 ↗ |
| Aug 27, 2025 | FDOT | 2 EA | $3,323 | Open bid tab, T6609 ↗ |
See every awarded price for this item on the Steel Mast Arm Assembly, item page.
Related items in Miami-dade County
- Thermoplastic, Standard, White: $4.00 per linear foot
- Thermoplastic, Standard, White: $100.00 per each
- Steel Mast Arm Assembly, Furnish: $80,000 per each
- Thermoplastic, Preformed: $19.29 per linear foot
- Thermoplastic, Preformed: $300.14 per each
- Thermoplastic, Standard: $4.00 per linear foot
- Load Center, F&I, Secondary: $19,788 per each
- Optional Base, Base Group 09: $44.04 per square yard