Street Lighting · awarded bid prices · Miami-dade County
Lighting Conductors, Remove &: cost per linear foot in Miami-dade County, FL
The median awarded price is $0.5 per linear foot, from 26 winning bids on 24 public projects in Miami-dade County, FL (2023–2026). Half of the awarded prices fall between $0.3 and $1.03.
Cost by state › Florida › Miami-dade County › Lighting Conductors, Remove &
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $0.32 in 2021 to $0.5 in 2026 (+56%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2021 | $0.32 | 8 |
| 2022 | $0.4 | 9 |
| 2023 | $0.5 | 9 |
| 2024 | $0.65 | 9 |
| 2025 | $0.51 | 9 |
| 2026 | $0.5 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 30, 2026 | FDOT | 22208 LF | $0.1 | Open bid tab, T6398 ↗ |
| Sep 30, 2026 | FDOT | 300 LF | $1.00 | Open bid tab, T6613 ↗ |
| Jul 29, 2026 | FDOT | 4917 LF | $0.5 | Open bid tab, T6595 ↗ |
| Mar 25, 2026 | FDOT | 1299 LF | $0.5 | Open bid tab, T6591 ↗ |
| Jan 28, 2026 | FDOT | 2520 LF | $0.5 | Open bid tab, T6618 ↗ |
See every awarded price for this item on the Lighting Conductors, Remove & item page.
Related items in Miami-dade County
- Pull & Splice Box, F&I, 13" x 24": $1,700 per each
- Conduit, Furnish & Install: $39.50 per linear foot
- Prestressed Concrete Pole, F&I: $2,973 per each
- Lighting Conductors, F&I: $4.65 per linear foot
- Electrical Service Wire, Furnish: $10.00 per linear foot
- Pull & Splice Box, Install: $1,076 per each
- Pull & Splice Box, F&I, 24" x 36": $2,649 per each
- Aluminum Signals Pole, Pedestal: $2,235 per each