Other · awarded bid prices · Miami-dade County
Load Center, F&I, Secondary: cost per each in Miami-dade County, FL
The median awarded price is $19,788 per each, from 21 winning bids on 21 public projects in Miami-dade County, FL (2023–2026). Half of the awarded prices fall between $16,500 and $23,000.
Cost by state › Florida › Miami-dade County › Load Center, F&I, Secondary
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $22,500 in 2024 to $17,772 in 2025 (-21%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2024 | $22,500 | 8 |
| 2025 | $17,772 | 8 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 30, 2026 | FDOT | 1 EA | $16,327 | Open bid tab, T6398 ↗ |
| Sep 30, 2026 | FDOT | 1 EA | $14,000 | Open bid tab, T6613 ↗ |
| Jul 29, 2026 | FDOT | 2 EA | $16,000 | Open bid tab, T6595 ↗ |
| Jul 29, 2026 | FDOT | 1 EA | $23,500 | Open bid tab, T6625 ↗ |
| Dec 3, 2025 | FDOT | 2 EA | $19,788 | Open bid tab, T6615 ↗ |
See every awarded price for this item on the Load Center, F&I, Secondary item page.
Related items in Miami-dade County
- Thermoplastic, Standard, White: $4.00 per linear foot
- Thermoplastic, Standard, White: $100.00 per each
- Steel Mast Arm Assembly, Furnish: $80,000 per each
- Thermoplastic, Preformed: $19.29 per linear foot
- Thermoplastic, Preformed: $300.14 per each
- Thermoplastic, Standard: $4.00 per linear foot
- Optional Base, Base Group 09: $44.04 per square yard
- Network Device, Cellular Modem: $3,000 per each