Steel Mast Arm Assembly, Furnish: cost per each in Miami-dade County, FL
The median awarded price is $80,000 per each, from 56 winning bids on 23 public projects in Miami-dade County, FL (2023–2026). Half of the awarded prices fall between $69,000 and $89,250.
Cost by state › Florida › Miami-dade County › Steel Mast Arm Assembly, Furnish
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $48,000 in 2021 to $80,000 in 2026 (+67%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2021 | $48,000 | 31 |
| 2022 | $63,779 | 28 |
| 2023 | $80,162 | 12 |
| 2024 | $77,500 | 16 |
| 2025 | $79,704 | 22 |
| 2026 | $80,000 | 17 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 30, 2026 | FDOT | 1 EA | $112,245 | Open bid tab, T6398 ↗ |
| Sep 30, 2026 | FDOT | 1 EA | $85,000 | Open bid tab, T6613 ↗ |
| Jul 29, 2026 | FDOT | 1 EA | $80,000 | Open bid tab, T6625 ↗ |
| Mar 25, 2026 | FDOT | 1 EA | $52,000 | Open bid tab, T6589 ↗ |
| Mar 25, 2026 | FDOT | 3 EA | $62,000 | Open bid tab, T6591 ↗ |
The same item across Florida: statewide figures. See every awarded price for this item on the Steel Mast Arm Assembly, Furnish item page.
Related items in Miami-dade County
- Thermoplastic, Standard, White: $4.00 per linear foot
- Thermoplastic, Standard, White: $100.00 per each
- Thermoplastic, Preformed: $19.29 per linear foot
- Thermoplastic, Preformed: $300.14 per each
- Thermoplastic, Standard: $4.00 per linear foot
- Load Center, F&I, Secondary: $19,788 per each
- Optional Base, Base Group 09: $44.04 per square yard
- Network Device, Cellular Modem: $3,000 per each