Traffic · awarded bid prices · Orange County
Sign Panel, Furnish & Install: cost per each in Orange County, FL
The median awarded price is $889.66 per each, from 13 winning bids on 8 public projects in Orange County, FL (2023–2026). Half of the awarded prices fall between $605.00 and $1,050.
Cost by state › Florida › Orange County › Sign Panel, Furnish & Install
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $997.23 in 2019 to $800.00 in 2025 (-20%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2019 | $997.23 | 6 |
| 2022 | $957.60 | 9 |
| 2023 | $1,112 | 7 |
| 2025 | $800.00 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Aug 26, 2026 | FDOT | 5 EA | $1,050 | Open bid tab, T5890 ↗ |
| Jan 28, 2026 | FDOT | 31 EA | $500.00 | Open bid tab, T5874 ↗ |
| Sep 24, 2025 | FDOT | 7 EA | $605.00 | Open bid tab, T5867 ↗ |
| Jul 30, 2025 | FDOT | 2 EA | $1,500 | Open bid tab, T5859 ↗ |
| Jun 11, 2025 | FDOT | 7 EA | $400.00 | Open bid tab, T5851 ↗ |
See every awarded price for this item on the Sign Panel, Furnish & Install item page.
Related items in Orange County
- Painted Pavement Markings: $2.95 per linear foot
- Signal Priority And Preemption: $8,810 per each
- Detectable Warnings: $37.95 per square foot
- Traffic Control Officer: $108.00 per hour
- Fiber Optic Cable Locator: $224.00 per day
- Raised Pavement Marker, Type B: $5.10 per each
- Fiber Optic Cable, F&I: $4.50 per linear foot
- Painted Pavement Markings: $75.00 per each