Other · awarded bid prices · Duval County
Optional Base, Base Group 09: cost per square yard in Duval County, FL
The median awarded price is $97.50 per square yard, from 12 winning bids on 12 public projects in Duval County, FL (2023–2026). Half of the awarded prices fall between $80.00 and $131.53.
Cost by state › Florida › Duval County › Optional Base, Base Group 09
Winning bids only, as printed in the agencies' bid tabulations (FDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $60.00 in 2021 to $85.00 in 2024 (+42%).
| Year | Median per square yard | Winning bids |
|---|---|---|
| 2021 | $60.00 | 5 |
| 2022 | $41.84 | 7 |
| 2023 | $68.00 | 11 |
| 2024 | $85.00 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Jul 29, 2026 | FDOT | 24 SY | $190.00 | Open bid tab, T2A29 ↗ |
| Jun 10, 2026 | FDOT | 1063 SY | $70.00 | Open bid tab, T2A47 ↗ |
| Dec 3, 2025 | FDOT | 957 SY | $84.00 | Open bid tab, T2A48 ↗ |
| May 28, 2025 | FDOT | 98 SY | $110.00 | Open bid tab, T2991 ↗ |
| Mar 26, 2025 | FDOT | 1320 SY | $125.38 | Open bid tab, T2A19 ↗ |
See every awarded price for this item on the Optional Base, Base Group 09 item page.
Related items in Duval County
- Thermoplastic, Standard, White: $6.50 per linear foot
- Thermoplastic, Standard, White: $137.03 per each
- Thermoplastic, Preformed: $228.00 per each
- Temporary Barrier, Relocate: $15.00 per linear foot
- Thermoplastic, Standard: $6.00 per linear foot
- Thermoplastic, Preformed: $15.00 per linear foot
- Temporary Barrier, F&I, Low: $48.65 per linear foot
- Tubular Marker, Durable, 36": $205.00 per each