City of Tampa: awarded unit prices

6,221 winning bid prices read from 152 source documents, 2013–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Tampa

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Contingencyls82$80,000$150,000$10,000 – $700,000Jul 28, 2026, Open bid tab, contract 26-c-00013-itemized-bidtab-adau ↗
Maintenance of Trafficls66—$25,000$500.00 – $955,000Feb 24, 2026, Open bid tab, contract 25-c-00041-itemized-bidtabu ↗
Mobilizationls32—$100,000$25,000 – $793,000May 13, 2025, Open bid tab, contract 24-c-00002-itemizedbidtabu ↗
Reconnect Service Connectionseach30$111.10$391.00$1.00 – $715.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Disposal of Debriscubic yard29—$363.00$0.05 – $363.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Sewage bypass pumping for 8 inch diameter. sewerlinear foot26$0.1$3.00$0.05 – $3.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Cured in place pipe for 8 inch diameter. gravity sewer (.236 inch thick)linear foot23$30.00$39.00$17.00 – $70.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Hydraulic clean & inspection of 8 inch diameter. gravity sewerlinear foot21$2.10$2.45$1.30 – $8.00Sep 19, 2023, Open bid tab, contract 23-c-00008itemizedbidtab_092123 ↗
Inlet Protection Systemeach20$163.00$176.00$40.00 – $750.00Dec 16, 2025, Open bid tab, contract 26-c-00006-itemized-bidtabu ↗
Sewage bypass pumping for 10 inch diameter. sewerlinear foot18—$5.00$0.05 – $5.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Sewage bypass pumping for 12 inch diameter. sewerlinear foot17—$10.00$0.05 – $25.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Detectable Warningssquare foot17$25.00$25.00$12.00 – $80.00Aug 18, 2026, Open bid tab, contract 26-c-00023-iitemized-bidtabu ↗
Manhole rehabilitation by coating system min. 250 mils thicksquare foot16$29.55$50.43$26.00 – $50.43Sep 12, 2023, Open bid tab, contract 23-c-00010_bidtab_itemized_after_2percent ↗
Hydraulic clean & inspection of 10 inch diameter. gravity sewerlinear foot16$2.10$3.00$1.65 – $3.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Embankmentcubic yard16$30.00$240.00$0.01 – $240.00Dec 16, 2025, Open bid tab, contract 26-c-00006-itemized-bidtabu ↗
Sewer Bypass with Tanker Truckhour15$240.00$262.00$60.00 – $416.74Jan 30, 2024, Open bid tab, contract 24-c-00007_itemizedbidtabu_0 ↗
Hydraulic clean & inspection of 12 inch diameter. gravity sewerlinear foot15$2.31$3.00$1.80 – $3.50Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Cured in place pipe for 10 inch diameter. gravity sewer (.295 inch thick)linear foot15$36.80$60.00$26.25 – $73.50Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Cured in place pipe for 12 inch diameter. gravity sewer (.295 inch thick)linear foot14$40.40$60.00$29.50 – $96.63Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Mechanical milling of asphalt roadways in 1-inch incrementssy-in14—$23.00$2.40 – $35.00Jul 15, 2025, Open bid tab, contract 25-c-00026-itemized-bidtabu ↗
Regular Excavationcubic yard14$37.00$240.00$6.15 – $240.00Dec 16, 2025, Open bid tab, contract 26-c-00006-itemized-bidtabu ↗
Root Pruninglinear foot14$12.50$30.00$5.00 – $88.00Aug 18, 2026, Open bid tab, contract 26-c-00023-iitemized-bidtabu ↗
Remove of protruding serviceeach13$318.00$489.00$2.60 – $529.50Jan 30, 2024, Open bid tab, contract 24-c-00007_itemizedbidtabu_0 ↗
Sewage bypass pumping for 15 inch diameter. sewerlinear foot13$5.25$10.00$1.10 – $34.50Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Clean & inspection of tuberculated cast iron or ductile iron sewer , 8 inch diameter.linear foot12$17.65$28.75$5.00 – $31.25Sep 19, 2023, Open bid tab, contract 23-c-00008itemizedbidtab_092123 ↗
Hydraulic clean & inspection of 24 inch diameter. gravity sewerlinear foot12$5.97$9.00$4.95 – $10.10Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Hydraulic clean & inspection of 15 inch diameter. gravity sewerlinear foot12$3.23$4.00$2.70 – $7.90Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Cured in place pipe for 15 inch diameter. gravity sewer (.295 inch thick)linear foot12$55.15$68.00$42.00 – $103.35Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
2 Performance Turf, Sodsquare yard12$5.00$9.00$2.48 – $50.00Dec 16, 2025, Open bid tab, contract 26-c-00006-itemized-bidtabu ↗
4 Concrete Curb, Type Dlinear foot12$50.00$50.00$17.00 – $85.00Dec 16, 2025, Open bid tab, contract 26-c-00006-itemized-bidtabu ↗
Concrete sidewalk and driveway, 6 inch thicksquare yard12$78.00$76.00$41.00 – $180.00Aug 18, 2026, Open bid tab, contract 26-c-00023-iitemized-bidtabu ↗
Cured in place pipe for 24 inch diameter. gravity sewer (.472 inch thick)linear foot11$84.00$58.00$58.00 – $120.20Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Sewage bypass pumping for 18 inch diameter. sewerlinear foot11$6.60$18.00$1.65 – $45.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Hydraulic clean & inspection of 18 inch diameter. gravity sewerlinear foot11$5.00$6.00$2.75 – $9.00Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
50 Single Post Sign, Relocateas11$230.00$281.89$64.54 – $500.00Dec 16, 2025, Open bid tab, contract 26-c-00006-itemized-bidtabu ↗
Root removelinear foot11$4.76$4.00$3.85 – $20.00Sep 19, 2023, Open bid tab, contract 23-c-00008itemizedbidtab_092123 ↗
Chemical grouting lateral after lining in 8 inch gravity sewereach10$337.50$345.00$265.00 – $490.00Sep 19, 2023, Open bid tab, contract 23-c-00008itemizedbidtab_092123 ↗
Small size manhole frame and cover replace (in pavement)each10$1,209$1,286$850.00 – $1,800Aug 16, 2022, Open bid tab, contract 21-c-00025_rebiditemized_bidtabu ↗
Sewage bypass pumping for 24 inch diameter. sewerlinear foot10—$38.00$2.20 – $55.90Sep 30, 2025, Open bid tab, contract 25-c-00007-itemized-bid-tabu ↗
Furnish, place and compaction crushed concrete basecubic yard10$172.50$99.00$80.00 – $280.00Jun 4, 2024, Open bid tab, contract 24-c-00026_itemizedbidtabu ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.