Skip to content
Hubstake

Cost by state

Construction unit costs in Texas

Median awarded unit prices for the 44 most-bid items on Texas public projects, from winning bids in agency bid tabulations.

Cost by state › Texas

ItemPerMedianMiddle halfWinning bids
Refl PAV Mrkr TY Ii-a-aeach$5.50$4.50 – $7.611,142
Portable Changeable Message Signday$100.00$32.00 – $150.001,041
Temp Sedmt Cont Fence (Remove)linear foot$1.00$1.00 – $1.75952
Temp Sedmt Cont Fence (Install)linear foot$4.25$3.40 – $5.00945
Biodeg Erosn Cont Logs (Remove)linear foot$1.25$1.00 – $2.16932
Refl PAV Mrkr TY I-Ceach$5.50$4.41 – $7.50817
Remove SM RD SN Sup&Ameach$110.00$100.00 – $150.00786
Guardrail End Treatment (Install)each$3,355$3,056 – $3,677781
Refl PAV MRK TY I (W)8"(SLD)(100MIL)linear foot$1.15$0.93 – $1.80741
Tack Coatgallon$4.50$3.50 – $6.50685
In SM RD SN Sup&Am TY10BWG(1)SA(P)each$745.00$650.00 – $900.00685
Refl PAV Mrkr TY Ii-c-reach$5.20$4.25 – $7.00678
Riprap (Mow Strip)(4 in)cubic yard$675.00$586.27 – $794.46676
Refl PAV MRK TY I (W)24"(SLD)(100MIL)linear foot$8.43$6.90 – $12.00665
Refl PAV MRK TY I (Y)6"(SLD)(100MIL)linear foot$0.75$0.57 – $1.25641
Remove Metal Beam Guard Fencelinear foot$3.00$2.24 – $5.00618
Refl PAV MRK TY I (W)6"(SLD)(100MIL)linear foot$0.74$0.56 – $1.20597
Excav (Roadway)cubic yard$18.91$12.50 – $30.00593
MTL W-beam GD Fen (Tim Post)linear foot$28.00$25.00 – $32.00572
WK ZN PAV MRK SHT Term (Tab)Ty Weach$1.45$1.00 – $2.05568
Rock Filter Dams (Remove)linear foot$12.24$10.00 – $18.98566
WK ZN PAV MRK SHT Term (Tab)Ty Y-2each$1.50$1.00 – $2.00548
Trench Safetylinear foot$2.00$1.00 – $3.00543
Biodeg Erosn Cont Logs (Instl) (12")linear foot$6.00$4.50 – $8.61525
In SM RD SN Sup&Am TY10BWG(1)SA(T)each$850.00$750.00 – $978.75522
CEM Stabil Bkflcubic yard$201.35$147.25 – $275.00520
MTL Beam GD Fen Trans (Thrie-beam)each$2,200$1,887 – $2,679470
Refl PAV MRK TY I (W)6"(BRK)(100MIL)linear foot$0.76$0.577 – $1.23468
Prefab PM TY C (W)(Arrow)each$243.69$206.25 – $285.00462
Guardrail End Treatment (Remove)each$272.50$220.00 – $366.25459
Elim Ext PM & Mrks (4")linear foot$0.75$0.42 – $1.25456
Construction Exits (Remove)square yard$10.00$5.00 – $14.27444
Remov Str (Pipe)linear foot$24.14$15.00 – $38.63421
Downstream Anchor Terminal Sectioneach$1,486$1,250 – $1,700414
RC Pipe (CL III)(24 in)linear foot$110.00$94.12 – $150.00406
Flowable Backfillcubic yard$350.00$250.00 – $500.00384
8" Gate Valveeach$2,597$2,300 – $3,200234
Litter Removalacre$17.00$14.00 – $20.25132
Bladinghour$150.00$100.00 – $236.00131
Topsoilcubic yard$36.40$28.00 – $61.0586
Concrete Collareach$947.24$550.00 – $1,00069
Hydrated Limeton$320.00$252.62 – $370.0028
Inlet Protectioneach$225.00$150.00 – $250.0024
Concrete Curblinear foot$35.98$35.00 – $53.0021

Prices by county in Texas

Agencies in Texas