| TMA (Stationary) | day | $250.00 | $100.00 – $350.00 | 118 | Nov 4, 2026, line 1 ↗ |
| Portable Changeable Message Sign | day | $100.00 | $50.00 – $200.00 | 81 | Oct 7, 2026, line 12 ↗ |
| Reflective pavement marker type ii-c-r | each | $6.31 | $5.25 – $7.24 | 49 | Sep 2, 2026, line 21 ↗ |
| Pavement surface preparation for marking (arrow) | each | $10.00 | $5.19 – $13.50 | 40 | Sep 2, 2026, line 26 ↗ |
| Pavement surface preparation for marking (word) | each | $11.50 | $5.96 – $15.07 | 40 | Sep 2, 2026, line 28 ↗ |
| Pavement surface preparation for marking (8 inch) | linear foot | $0.08 | $0.05 – $0.103 | 36 | Sep 2, 2026, line 23 ↗ |
| Pavement surface preparation for marking (24 inch) | linear foot | $0.46 | $0.325 – $0.515 | 34 | Sep 2, 2026, line 25 ↗ |
| Elim ext pm & mrks (6 inch) | linear foot | $0.49 | $0.35 – $0.725 | 34 | Sep 2, 2026, line 25 ↗ |
| Pavement surface preparation for marking (12 inch) | linear foot | $0.2 | $0.1 – $0.26 | 33 | Sep 2, 2026, line 24 ↗ |
| Pavement surface preparation for marking (dbl arrow) | each | $15.15 | $10.00 – $25.32 | 32 | Sep 2, 2026, line 27 ↗ |
| Block Sodding | square yard | $5.11 | $4.60 – $8.00 | 31 | Nov 3, 2026, line 3 ↗ |
| Prefab pm type c (w)(word) | each | $305.00 | $267.50 – $358.34 | 31 | Sep 2, 2026, line 20 ↗ |
| Reflective pavement marker type ii-a-a | each | $6.00 | $5.24 – $6.98 | 30 | Aug 11, 2026, line 35 ↗ |
| Biodegradable erosion control logs (remove) | linear foot | $1.00 | $0.812 – $2.00 | 30 | Nov 3, 2026, line 27 ↗ |
| Prefab pm type c (w)(arrow) | each | $235.00 | $190.00 – $265.00 | 29 | Sep 2, 2026, line 18 ↗ |
| Reflective pavement marker type i-c | each | $6.00 | $6.00 – $6.65 | 27 | Jun 3, 2026, line 42 ↗ |
| Elim Ext PM & Mrks (Arrow) | each | $53.00 | $40.50 – $79.50 | 26 | Sep 2, 2026, line 28 ↗ |
| Elim Ext PM & Mrks (Word) | each | $57.50 | $45.00 – $79.00 | 26 | Sep 2, 2026, line 30 ↗ |
| Re pm type iii (blk)(6 inch)(shadow) | linear foot | $0.925 | $0.76 – $2.02 | 26 | Sep 2, 2026, line 16 ↗ |
| Remove Metal Beam Guard Fence | linear foot | $3.30 | $2.60 – $5.50 | 25 | Aug 6, 2026, line 23 ↗ |
| Conduit (pvc) (sch 80) (2 inch) (bore) | linear foot | $19.00 | $17.00 – $22.00 | 25 | Nov 3, 2026, line 9 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | $750.00 | $600.00 – $950.00 | 25 | Aug 6, 2026, line 12 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | $1.45 | $1.05 – $2.05 | 24 | Aug 11, 2026, line 5 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | $7.25 | $6.64 – $8.56 | 24 | Aug 11, 2026, line 6 ↗ |
| Elim ext pm & mrks (8 inch) | linear foot | $0.765 | $0.588 – $0.985 | 24 | Aug 11, 2026, line 38 ↗ |
| Elim ext pm & mrks (12 inch) | linear foot | $1.18 | $1.00 – $2.00 | 24 | Sep 2, 2026, line 27 ↗ |
| Prefab pm type c (w)(dbl arrow) | each | $333.46 | $299.25 – $405.00 | 24 | Sep 2, 2026, line 19 ↗ |
| Downstream Anchor Terminal Section | each | $1,362 | $1,238 – $1,592 | 24 | Aug 6, 2026, line 22 ↗ |
| Temporary sediment control fence (install) | linear foot | $4.00 | $3.38 – $4.75 | 23 | Aug 6, 2026, line 19 ↗ |
| Temporary sediment control fence (remove) | linear foot | $1.00 | $1.00 – $1.32 | 23 | Aug 6, 2026, line 20 ↗ |
| Re pm type iii (w)(12 inch)(solid) | linear foot | $3.88 | $2.05 – $5.15 | 23 | Sep 2, 2026, line 12 ↗ |
| Pavement surface preparation for marking (uturn arr) | each | $15.00 | $8.00 – $16.62 | 23 | Aug 11, 2026, line 52 ↗ |
| Guardrail End Treatment (Install) | each | $3,300 | $3,070 – $3,755 | 23 | Aug 6, 2026, line 27 ↗ |
| Elim Ext PM & Mrks (DBL Arrow) | each | $62.50 | $52.00 – $80.00 | 22 | Sep 2, 2026, line 29 ↗ |
| Elim ext pm & mrks (24 inch) | linear foot | $2.67 | $2.22 – $3.56 | 22 | Aug 11, 2026, line 39 ↗ |
| In small road sign support&assembly type10bwg(1)sa(p) | each | $636.50 | $597.53 – $750.00 | 22 | Oct 13, 2026, line 7 ↗ |
| Cement stabilized backfill | cubic yard | $70.00 | $57.30 – $200.00 | 21 | Oct 7, 2026, line 7 ↗ |
| Conduit (pvc) (sch 80) (2 inch) | linear foot | $12.30 | $11.00 – $16.00 | 21 | Aug 5, 2026, line 7 ↗ |
| Ground box type d (162922)w/apron | each | $1,341 | $1,245 – $1,550 | 21 | Nov 3, 2026, line 19 ↗ |
| Fertilizer | acre | $1,000 | $800.00 – $1,706 | 21 | Apr 8, 2026, line 14 ↗ |
| Re pm type iii (w)(24 inch)(solid) | linear foot | $10.00 | $7.65 – $13.70 | 21 | Aug 11, 2026, line 17 ↗ |
| Re pm type iii (w)(6 inch)(solid) | linear foot | $1.30 | $0.85 – $2.00 | 21 | Sep 2, 2026, line 7 ↗ |
| Re pm type iii (w)(6 inch)(broken) | linear foot | $1.01 | $0.81 – $2.10 | 21 | Sep 2, 2026, line 8 ↗ |
| Concrete str repair (vertical & overhead) | square foot | $200.00 | $95.00 – $304.00 | 21 | Oct 7, 2026, line 1 ↗ |
| Metal beam guard fence transition (thrie-beam) | each | $1,900 | $1,700 – $2,450 | 21 | Aug 6, 2026, line 21 ↗ |
| Re pm type iii (y)(6 inch)(solid) | linear foot | $1.30 | $0.85 – $1.93 | 20 | Sep 2, 2026, line 13 ↗ |
| TMA (Mobile Operation) | hour | $75.00 | $20.00 – $88.75 | 20 | Oct 7, 2026, line 4 ↗ |
| Metal w-beam guard fence (timber post) | linear foot | $29.46 | $26.75 – $34.17 | 20 | Aug 6, 2026, line 20 ↗ |
| Construction Exits (Remove) | square yard | $10.00 | $7.20 – $12.65 | 19 | Aug 6, 2026, line 18 ↗ |
| Biodegradable erosion control logs (install) (8 inch) | linear foot | $5.20 | $2.71 – $6.88 | 19 | Nov 3, 2026, line 26 ↗ |
| Clean and seal existing joint | linear foot | $35.00 | $25.00 – $45.00 | 19 | Oct 7, 2026, line 12 ↗ |
| In small road sign support&assembly type10bwg(1)sa(t) | each | $806.84 | $698.50 – $954.90 | 18 | Oct 13, 2026, line 9 ↗ |
| Electrical conductor (no.6) bare | linear foot | $2.10 | $1.66 – $2.20 | 15 | Nov 3, 2026, line 15 ↗ |