Skip to content
Hubstake

Cost by county

Construction unit costs in Harris County, TX

Median awarded unit prices for 53 items on public projects in Harris County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Texas › Harris County

ItemPerMedianMiddle halfWinning bidsLatest source document
TMA (Stationary)day$250.00$100.00 – $350.00118Nov 4, 2026, line 1 ↗
Portable Changeable Message Signday$100.00$50.00 – $200.0081Oct 7, 2026, line 12 ↗
Reflective pavement marker type ii-c-reach$6.31$5.25 – $7.2449Sep 2, 2026, line 21 ↗
Pavement surface preparation for marking (arrow)each$10.00$5.19 – $13.5040Sep 2, 2026, line 26 ↗
Pavement surface preparation for marking (word)each$11.50$5.96 – $15.0740Sep 2, 2026, line 28 ↗
Pavement surface preparation for marking (8 inch)linear foot$0.08$0.05 – $0.10336Sep 2, 2026, line 23 ↗
Pavement surface preparation for marking (24 inch)linear foot$0.46$0.325 – $0.51534Sep 2, 2026, line 25 ↗
Elim ext pm & mrks (6 inch)linear foot$0.49$0.35 – $0.72534Sep 2, 2026, line 25 ↗
Pavement surface preparation for marking (12 inch)linear foot$0.2$0.1 – $0.2633Sep 2, 2026, line 24 ↗
Pavement surface preparation for marking (dbl arrow)each$15.15$10.00 – $25.3232Sep 2, 2026, line 27 ↗
Block Soddingsquare yard$5.11$4.60 – $8.0031Nov 3, 2026, line 3 ↗
Prefab pm type c (w)(word)each$305.00$267.50 – $358.3431Sep 2, 2026, line 20 ↗
Reflective pavement marker type ii-a-aeach$6.00$5.24 – $6.9830Aug 11, 2026, line 35 ↗
Biodegradable erosion control logs (remove)linear foot$1.00$0.812 – $2.0030Nov 3, 2026, line 27 ↗
Prefab pm type c (w)(arrow)each$235.00$190.00 – $265.0029Sep 2, 2026, line 18 ↗
Reflective pavement marker type i-ceach$6.00$6.00 – $6.6527Jun 3, 2026, line 42 ↗
Elim Ext PM & Mrks (Arrow)each$53.00$40.50 – $79.5026Sep 2, 2026, line 28 ↗
Elim Ext PM & Mrks (Word)each$57.50$45.00 – $79.0026Sep 2, 2026, line 30 ↗
Re pm type iii (blk)(6 inch)(shadow)linear foot$0.925$0.76 – $2.0226Sep 2, 2026, line 16 ↗
Remove Metal Beam Guard Fencelinear foot$3.30$2.60 – $5.5025Aug 6, 2026, line 23 ↗
Conduit (pvc) (sch 80) (2 inch) (bore)linear foot$19.00$17.00 – $22.0025Nov 3, 2026, line 9 ↗
Riprap (Mow Strip)(4 in)cubic yard$750.00$600.00 – $950.0025Aug 6, 2026, line 12 ↗
Reflective pavement marking type i (w)8 inch(solid)(100mil)linear foot$1.45$1.05 – $2.0524Aug 11, 2026, line 5 ↗
Reflective pavement marking type i (w)24 inch(solid)(100mil)linear foot$7.25$6.64 – $8.5624Aug 11, 2026, line 6 ↗
Elim ext pm & mrks (8 inch)linear foot$0.765$0.588 – $0.98524Aug 11, 2026, line 38 ↗
Elim ext pm & mrks (12 inch)linear foot$1.18$1.00 – $2.0024Sep 2, 2026, line 27 ↗
Prefab pm type c (w)(dbl arrow)each$333.46$299.25 – $405.0024Sep 2, 2026, line 19 ↗
Downstream Anchor Terminal Sectioneach$1,362$1,238 – $1,59224Aug 6, 2026, line 22 ↗
Temporary sediment control fence (install)linear foot$4.00$3.38 – $4.7523Aug 6, 2026, line 19 ↗
Temporary sediment control fence (remove)linear foot$1.00$1.00 – $1.3223Aug 6, 2026, line 20 ↗
Re pm type iii (w)(12 inch)(solid)linear foot$3.88$2.05 – $5.1523Sep 2, 2026, line 12 ↗
Pavement surface preparation for marking (uturn arr)each$15.00$8.00 – $16.6223Aug 11, 2026, line 52 ↗
Guardrail End Treatment (Install)each$3,300$3,070 – $3,75523Aug 6, 2026, line 27 ↗
Elim Ext PM & Mrks (DBL Arrow)each$62.50$52.00 – $80.0022Sep 2, 2026, line 29 ↗
Elim ext pm & mrks (24 inch)linear foot$2.67$2.22 – $3.5622Aug 11, 2026, line 39 ↗
In small road sign support&assembly type10bwg(1)sa(p)each$636.50$597.53 – $750.0022Oct 13, 2026, line 7 ↗
Cement stabilized backfillcubic yard$70.00$57.30 – $200.0021Oct 7, 2026, line 7 ↗
Conduit (pvc) (sch 80) (2 inch)linear foot$12.30$11.00 – $16.0021Aug 5, 2026, line 7 ↗
Ground box type d (162922)w/aproneach$1,341$1,245 – $1,55021Nov 3, 2026, line 19 ↗
Fertilizeracre$1,000$800.00 – $1,70621Apr 8, 2026, line 14 ↗
Re pm type iii (w)(24 inch)(solid)linear foot$10.00$7.65 – $13.7021Aug 11, 2026, line 17 ↗
Re pm type iii (w)(6 inch)(solid)linear foot$1.30$0.85 – $2.0021Sep 2, 2026, line 7 ↗
Re pm type iii (w)(6 inch)(broken)linear foot$1.01$0.81 – $2.1021Sep 2, 2026, line 8 ↗
Concrete str repair (vertical & overhead)square foot$200.00$95.00 – $304.0021Oct 7, 2026, line 1 ↗
Metal beam guard fence transition (thrie-beam)each$1,900$1,700 – $2,45021Aug 6, 2026, line 21 ↗
Re pm type iii (y)(6 inch)(solid)linear foot$1.30$0.85 – $1.9320Sep 2, 2026, line 13 ↗
TMA (Mobile Operation)hour$75.00$20.00 – $88.7520Oct 7, 2026, line 4 ↗
Metal w-beam guard fence (timber post)linear foot$29.46$26.75 – $34.1720Aug 6, 2026, line 20 ↗
Construction Exits (Remove)square yard$10.00$7.20 – $12.6519Aug 6, 2026, line 18 ↗
Biodegradable erosion control logs (install) (8 inch)linear foot$5.20$2.71 – $6.8819Nov 3, 2026, line 26 ↗
Clean and seal existing jointlinear foot$35.00$25.00 – $45.0019Oct 7, 2026, line 12 ↗
In small road sign support&assembly type10bwg(1)sa(t)each$806.84$698.50 – $954.9018Oct 13, 2026, line 9 ↗
Electrical conductor (no.6) barelinear foot$2.10$1.66 – $2.2015Nov 3, 2026, line 15 ↗

Other counties in Texas