San Antonio Water System: awarded unit prices

40,086 winning bid prices read from 679 source documents, 2010–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › San Antonio Water System

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Trench Excavation Safety Protectionlinear foot320—$3.75$0.01 – $125.00Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
Tack Coatgallon216$16.00$16.00$1.00 – $310.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Remove Concrete Curblinear foot198$5.00$5.00$0.5 – $35.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Topsoilcubic yard179$30.00$40.00$4.00 – $500.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Concrete sidewalksquare yard168$76.00$95.00$0.5 – $210.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Bermuda Soddingsquare yard159$15.00$18.00$2.00 – $140.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
St. Augustine Soddingsquare yard141$16.00$18.00$5.00 – $125.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Concrete Gutterlinear foot135$30.00$30.00$4.00 – $100.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Barricade, sign and traffic handlingeach133$400.00$1.00$1.00 – $6,000Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Concrete drivewaysquare yard127$80.00$95.00$40.00 – $160.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Commercial drivewaysquare yard126$98.95$95.00$40.00 – $190.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Concrete Curbinglinear foot126$35.00$35.00$5.00 – $80.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Police Officerhour118$50.00$70.00$17.00 – $100.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Salvage, Haul, Stockpile Asphalt Concrete Pavementcubic yard114—$100.00$1.00 – $200.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Hot mix asphalt concrete type "d", two (2) inch thicksquare yard113$45.00$45.00$17.00 – $273.79Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Flexible Base (Complete in place)cubic yard111$40.00$5.00$5.00 – $1,000Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Relocate Fencelinear foot111$10.00$1.00$1.00 – $50.00Jul 1, 2025, Open bid tab, contract CO-00852-01 ↗
Tack Coat (Cosa Spec)gallon102$11.50$8.00$1.00 – $157.00Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
Flowable Fillcubic yard99$170.00$240.00$95.00 – $500.00Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
Remove Concrete Curb (COSA Spec)linear foot90$7.75$20.00$0.5 – $56.00Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
Zoysia Soddingsquare yard85$20.00$18.00$1.00 – $110.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Cutting and replace pavement (6 inch atb & 2 inch hmac)square yard84$66.50$200.00$25.00 – $800.00Jul 1, 2025, Open bid tab, contract CO-00830-01 ↗
Concrete Retaining Walls – Combination Typecubic yard83$300.00$500.00$1.00 – $2,000Jul 1, 2025, Open bid tab, contract CO-00852-01 ↗
Hydrostatic Testingeach82$2,400$3,500$50.00 – $15,000Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
Intermediate Demobilization and Remobilizationeach81$10,000$32,000$1.00 – $142,870Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
2 inch blowoff, temporaryeach81$1,500$2,850$200.00 – $14,000Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
Cutting and replace pavement (10 inch atb & 3 inch hmac)square yard80$81.00$250.00$35.00 – $1,000Jul 1, 2025, Open bid tab, contract CO-00830-01 ↗
Concrete Encasement, Cradles, Saddles and Collarscubic yard80$295.00$500.00$100.00 – $1,850Apr 1, 2026, Open bid tab, contract CO-00887-01 ↗
Concrete sidewalk, exposed aggregatesquare yard78$100.00$100.00$1.00 – $500.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
Remove sidewalk and drivewaysquare yard76$5.00$5.00$0.31 – $50.00Jul 29, 2026, Open bid tab, contract CO-00909-01 ↗
Concrete driveway, exposed aggregatesquare yard74$100.00$100.00$1.00 – $280.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
(413) Flowable Fillcubic yard72$141.00$200.00$90.00 – $400.00Jul 18, 2025, Open bid tab, contract CO-00842-01 ↗
Flowable Backfill (Low Strength)cubic yard72$150.00$150.00$100.00 – $250.00Aug 19, 2026, Open bid tab, contract CO-00914-01 ↗
841 Hydrostatic Testingeach71$2,000$100.00$50.00 – $12,000Sep 17, 2025, Open bid tab, contract CO-00875-01 ↗
(858) Concrete Encasement, Cradles, Saddles and Collarscubic yard70$200.00$300.00$63.00 – $1,000Jul 29, 2025, Open bid tab, contract CO-00839-01 ↗
Two-Way Sanitary Sewer Clean-Outeach69$725.00$800.00$160.00 – $4,500Oct 10, 2025, Open bid tab, contract CO-00861-01 ↗
Concrete Curb (COSA Spec)linear foot69$40.00$80.00$1.00 – $111.00Aug 28, 2026, Open bid tab, contract CO-00862-01 ↗
Manhole Rehabilitationvf66$410.00$700.00$230.00 – $3,495Oct 14, 2025, Open bid tab, contract CO-00860-01 ↗
(103) Remove Miscellaneous Concretesquare foot65$10.00$10.00$1.00 – $40.00May 6, 2025, Open bid tab, contract CO-00828-01 ↗
Concrete Curblinear foot65$30.00$53.00$0.5 – $122.00Oct 29, 2025, Open bid tab, contract CO-00870-01 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Texas: statewide figures.