| Total cost, per cycle, per specifications | cycle | 4 | — | $10,945 | $490.00 – $10,945 | Jul 30, 2024, Open bid tab, 9206264 ↗ |
| Remove, disposal, replace of concrete and material, base repair with 6 inch of 1-1/2 sack cement stabilized sand, 51+ square yards, | square yard | 3 | — | $123.00 | $123.00 – $156.00 | Jan 3, 2024, Open bid tab, 8893485 ↗ |
| Remove, disposal, replace of concrete and material, base repair with 6 inch of 1-1/2 sack cement stabilized sand, 0-50 square | square yard | 3 | — | $171.00 | $171.00 – $218.00 | Jan 3, 2024, Open bid tab, 8893485 ↗ |
| Embankment (fnl)(dc)(type c) | cubic yard | 2 | — | $40.00 | $2.00 – $40.00 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Helper, per hour, per specifications | hour | 2 | — | $75.00 | $75.00 – $150.00 | Mar 2, 2023, Open bid tab, 8397698 ↗ |
| Journeyman, per hour, per specifications | hour | 2 | — | $149.00 | $149.00 – $249.00 | Mar 2, 2023, Open bid tab, 8397698 ↗ |
| 3 1/2 sack per specifications, per ton | ton | 2 | — | $52.00 | $52.00 – $64.00 | Dec 1, 2022, Open bid tab, 8333222 ↗ |
| Cob Hydrostatic Testing And Disinfection | ls | 1 | — | $48,611 | $48,611 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob ductile iron fitting | ton | 1 | — | $6,367 | $6,367 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob Reinstall Existing Water Meter | each | 1 | — | $1,262 | $1,262 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob Fire Hydrant Assembly | each | 1 | — | $8,878 | $8,878 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 16 inch gate valve | each | 1 | — | $3,184 | $3,184 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 12 inch gate valve | each | 1 | — | $3,056 | $3,056 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 8 inch gate valve | each | 1 | — | $3,871 | $3,871 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 6 inch gate valve | each | 1 | — | $1,082 | $1,082 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob Temporary Water Service | ls | 1 | — | $157,395 | $157,395 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob reconnect existing water service (larger than 2 inch) | each | 1 | — | $1,750 | $1,750 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob reconnect existing water service (2 inch and smaller) | each | 1 | — | $1,838 | $1,838 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 16 inch hdpe water line by other than open cut with 30 inch casing | linear foot | 1 | — | $2,600 | $2,600 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 16 inch hdpe water line by open cut with 30 inch casing | linear foot | 1 | — | $383.25 | $383.25 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 16 inch hdpe water line by open cut | linear foot | 1 | — | $223.58 | $223.58 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 16 inch hdpe water line by pipe bursting | linear foot | 1 | — | $218.00 | $218.00 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 12 inch hdpe water line by other than open cut with 24 inch casing | linear foot | 1 | — | $258.44 | $258.44 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 12 inch hdpe water line by open cut with 24 inch casing | linear foot | 1 | — | $361.79 | $361.79 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 12 inch hdpe water line by open cut | linear foot | 1 | — | $2,281 | $2,281 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 8 inch hdpe water line by other than open cut with 16 inch steel casing | linear foot | 1 | — | $201.30 | $201.30 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 8 inch hdpe water line by open cut | linear foot | 1 | — | $256.40 | $256.40 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 6 inch pvc (c900, dr-14) fire hydrant lead water line by open cut | linear foot | 1 | — | $263.98 | $263.98 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 2 inch hdpe-cts water line by other than open cut with 4 inch steel casing | linear foot | 1 | — | $196.68 | $196.68 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 2 inch hdpe-cts water line by open cut | linear foot | 1 | — | $79.42 | $79.42 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 1.5 inch hdpe-cts water line by other than open cut with 4 inch steel casing | linear foot | 1 | — | $634.94 | $634.94 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 1.5 inch hdpe-cts water line by open cut | linear foot | 1 | — | $90.05 | $90.05 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 1 inch hdpe-cts water line by other than open cut with 4 inch steel casing | linear foot | 1 | — | $107.27 | $107.27 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 1 inch hdpe-cts water line by open cut | linear foot | 1 | — | $108.24 | $108.24 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 0.625 inch hdpe-cts water line by other than open cut with 4 inch steel casing | linear foot | 1 | — | $155.24 | $155.24 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob 0.625 inch hdpe-cts water line by open cut | linear foot | 1 | — | $126.79 | $126.79 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob Wet Connection | each | 1 | — | $7,585 | $7,585 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob Trench Safety | linear foot | 1 | — | $6.37 | $6.37 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob adjusting manhole, inlet, and valve boxes | ls | 1 | — | $42,114 | $42,114 | Aug 21, 2025, Open bid tab, 9813647 ↗ |
| Cob wastewater cctv: pre-install inspection (pipe bursting sections only) | linear foot | 1 | — | $8.34 | $8.34 | Aug 21, 2025, Open bid tab, 9813647 ↗ |