| Trench Excavation Protection | linear foot | 16 | $1.08 | $1.00 | $1.00 – $35.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Mobilization | ls | 14 | — | $4,600,000 | $30,000 – $5,150,000 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Traffic Signal Pole And | each | 10 | $5,800 | $4,600 | $4,600 – $20,500 | Nov 17, 2016, Open bid tab, contract 2017-005-6629_0 ↗ |
| Block Sodding | square yard | 10 | $5.33 | $4.00 | $3.00 – $6.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Flowable Backfill | cubic yard | 7 | $100.00 | $118.80 | $100.00 – $500.00 | Dec 3, 2018, Open bid tab, contract 2019-005-6769_0 ↗ |
| Barricade, sign and traffic handling | month | 7 | — | $4,000 | $750.00 – $30,000 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Conduit (pvc) (sch 40) (2 inch) | linear foot | 6 | $13.93 | $13.00 | $13.00 – $19.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Str Steel (Rails) | linear foot | 6 | $365.00 | $450.00 | $122.00 – $450.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Excavation (Roadway) | cubic yard | 6 | $12.30 | $10.00 | $8.86 – $14.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Sand Backfill | cubic yard | 6 | $20.00 | $21.00 | $10.00 – $21.00 | Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗ |
| Construction exits (install) (type 1) | square yard | 6 | $18.00 | $18.00 | $9.00 – $18.00 | Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗ |
| 8 inch gate valve | each | 6 | $2,050 | $2,100 | $1,110 – $2,100 | Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗ |
| Reflective pavement marking type i (y)4 inch(solid)(100mil) | linear foot | 5 | $1.05 | $1.00 | $1.00 – $2.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Reflective pavement marking type i (w)4 inch(broken)(100mil) | linear foot | 5 | $1.05 | $0.3 | $0.3 – $3.50 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Wk zn pavement marking remove (reflective) type ii-a-a | each | 5 | $4.20 | $4.00 | $4.00 – $4.50 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Reinforced. concrete pipe (36 in.)(class. iii) | linear foot | 5 | $189.00 | $154.00 | $154.00 – $189.00 | Dec 3, 2018, Open bid tab, contract 2019-005-6769_0 ↗ |
| Reinforced concrete slab (hpc) | square foot | 5 | $21.00 | $15.00 | $14.00 – $24.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Field Office | month | 5 | $1,500 | $8,750 | $1,000 – $8,750 | Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗ |
| W.3 Adjust Fire Hydrant Elevation | each | 5 | $571.65 | $540.75 | $540.75 – $824.00 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| W.2 Adjust Water Valve Stack Top | each | 5 | $139.05 | $206.00 | $133.90 – $257.50 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| W.1 Adjust Water Meter Box | each | 5 | $242.05 | $128.75 | $128.75 – $257.50 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| Mailbox Assemblies (Permanent) | each | 5 | $154.50 | $250.00 | $154.50 – $250.00 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| Single Guardrail Terminal (Sgt7) | each | 5 | $2,112 | $2,040 | $2,040 – $2,163 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| Adjust Manhole Top | each | 5 | $561.35 | $1,250 | $527.36 – $1,250 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| 6 inch monolithic concrete curb | linear foot | 5 | $1.05 | $1.00 | $1.00 – $1.05 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| Excavation Roadway & Channel | cubic yard | 5 | $4.05 | $4.05 | $1.26 – $5.19 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| Sawed Breakout Groove | linear foot | 5 | $1.67 | $2.10 | $1.67 – $2.10 | Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗ |
| Rail (type c402) (hpc) | linear foot | 5 | $160.00 | $185.00 | $150.00 – $185.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Drill Shaft (36 in) | linear foot | 5 | $175.00 | $117.00 | $117.00 – $210.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Approach Slab (Hpc) | cubic yard | 5 | $460.00 | $450.00 | $440.00 – $600.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Construction Exits (Remove) | square yard | 5 | $7.00 | $7.00 | $5.00 – $7.00 | Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗ |
| Rock Filter Dams (Remove) | linear foot | 5 | $11.00 | $9.00 | $9.00 – $11.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Rock filter dams (install) (type 2) | linear foot | 5 | $27.00 | $30.00 | $27.00 – $30.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Electrical conductor (no.6) bare | linear foot | 5 | $1.55 | $1.60 | $1.05 – $1.60 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Terminal Anchor Section | each | 5 | $645.00 | $700.00 | $515.00 – $700.00 | Aug 25, 2011, Open bid tab, contract 2011-095-5696_0 ↗ |
| Remove concrete sidewalk | square yard | 5 | $4.00 | $3.70 | $3.70 – $5.15 | Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗ |
| 6 inch gate valve | each | 5 | $1,400 | $1,575 | $920.00 – $1,575 | Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗ |
| Electrical conductor (no 10) insulated (xhhw) | linear foot | 4 | — | $1.20 | $1.16 – $1.40 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Electrical conductor (no.10) bare | linear foot | 4 | — | $1.10 | $1.06 – $1.21 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |
| Conduit (pvc) (sch 40) (1 inch) | linear foot | 4 | — | $11.00 | $10.65 – $11.00 | Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗ |