Agency · awarded bid prices

Dallas County: awarded unit prices

2,692 winning bid prices read from 16 source documents, 2010–2022. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Dallas County

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Trench Excavation Protectionlinear foot16$1.08$1.00$1.00 – $35.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Mobilizationls14—$4,600,000$30,000 – $5,150,000Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Traffic Signal Pole Andeach10$5,800$4,600$4,600 – $20,500Nov 17, 2016, Open bid tab, contract 2017-005-6629_0 ↗
Block Soddingsquare yard10$5.33$4.00$3.00 – $6.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Flowable Backfillcubic yard7$100.00$118.80$100.00 – $500.00Dec 3, 2018, Open bid tab, contract 2019-005-6769_0 ↗
Barricade, sign and traffic handlingmonth7—$4,000$750.00 – $30,000Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Conduit (pvc) (sch 40) (2 inch)linear foot6$13.93$13.00$13.00 – $19.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Str Steel (Rails)linear foot6$365.00$450.00$122.00 – $450.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Excavation (Roadway)cubic yard6$12.30$10.00$8.86 – $14.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Sand Backfillcubic yard6$20.00$21.00$10.00 – $21.00Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗
Construction exits (install) (type 1)square yard6$18.00$18.00$9.00 – $18.00Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗
8 inch gate valveeach6$2,050$2,100$1,110 – $2,100Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗
Reflective pavement marking type i (y)4 inch(solid)(100mil)linear foot5$1.05$1.00$1.00 – $2.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Reflective pavement marking type i (w)4 inch(broken)(100mil)linear foot5$1.05$0.3$0.3 – $3.50Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Wk zn pavement marking remove (reflective) type ii-a-aeach5$4.20$4.00$4.00 – $4.50Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Reinforced. concrete pipe (36 in.)(class. iii)linear foot5$189.00$154.00$154.00 – $189.00Dec 3, 2018, Open bid tab, contract 2019-005-6769_0 ↗
Reinforced concrete slab (hpc)square foot5$21.00$15.00$14.00 – $24.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Field Officemonth5$1,500$8,750$1,000 – $8,750Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗
W.3 Adjust Fire Hydrant Elevationeach5$571.65$540.75$540.75 – $824.00Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
W.2 Adjust Water Valve Stack Topeach5$139.05$206.00$133.90 – $257.50Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
W.1 Adjust Water Meter Boxeach5$242.05$128.75$128.75 – $257.50Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
Mailbox Assemblies (Permanent)each5$154.50$250.00$154.50 – $250.00Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
Single Guardrail Terminal (Sgt­7)each5$2,112$2,040$2,040 – $2,163Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
Adjust Manhole Topeach5$561.35$1,250$527.36 – $1,250Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
6 inch monolithic concrete curblinear foot5$1.05$1.00$1.00 – $1.05Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
Excavation ­ Roadway & Channelcubic yard5$4.05$4.05$1.26 – $5.19Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
Sawed Breakout Groovelinear foot5$1.67$2.10$1.67 – $2.10Nov 18, 2010, Open bid tab, contract 2011-005-5264_0 ↗
Rail (type c402) (hpc)linear foot5$160.00$185.00$150.00 – $185.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Drill Shaft (36 in)linear foot5$175.00$117.00$117.00 – $210.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Approach Slab (Hpc)cubic yard5$460.00$450.00$440.00 – $600.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Construction Exits (Remove)square yard5$7.00$7.00$5.00 – $7.00Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗
Rock Filter Dams (Remove)linear foot5$11.00$9.00$9.00 – $11.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Rock filter dams (install) (type 2)linear foot5$27.00$30.00$27.00 – $30.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Electrical conductor (no.6) barelinear foot5$1.55$1.60$1.05 – $1.60Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Terminal Anchor Sectioneach5$645.00$700.00$515.00 – $700.00Aug 25, 2011, Open bid tab, contract 2011-095-5696_0 ↗
Remove concrete sidewalksquare yard5$4.00$3.70$3.70 – $5.15Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗
6 inch gate valveeach5$1,400$1,575$920.00 – $1,575Mar 30, 2017, Open bid tab, contract 2017-030-6654_0 ↗
Electrical conductor (no 10) insulated (xhhw)linear foot4—$1.20$1.16 – $1.40Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Electrical conductor (no.10) barelinear foot4—$1.10$1.06 – $1.21Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗
Conduit (pvc) (sch 40) (1 inch)linear foot4—$11.00$10.65 – $11.00Mar 24, 2022, Open bid tab, contract 2022-014-6929_0 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Texas: statewide figures.