| Mobilization (MAX 3%) | ls | 4 | — | $41,500 | $5,087 – $41,500 | Dec 3, 2024, Open bid tab, contract TAB_202 ↗ |
| Pearl Street, Beaumont | tx | 4 | — | $0.05 | $0.05 – $0.06 | Aug 10, 2022, Open bid tab, contract TAB_115 ↗ |
| Dense Graded Hot-Mix Asphalt: 2 inches thick, PG 70- | ton | 2 | — | $165.00 | $165.00 | Dec 3, 2024, Open bid tab, contract TAB_202 ↗ |
| Cement Treated Subgrade 39900 AEP Prime (0.25 Gallons/SY) | gallon | 2 | — | $4.00 | $4.00 | Dec 3, 2024, Open bid tab, contract TAB_202 ↗ |
| Deep) stockpile on site surface and base course (8” | square yard | 2 | — | $5.50 | $5.50 | Dec 3, 2024, Open bid tab, contract TAB_202 ↗ |
| Excavation: excavation existing 2494 surface and base - (2.25” | cubic yard | 2 | — | $28.60 | $28.60 | Dec 3, 2024, Open bid tab, contract TAB_202 ↗ |
| Remove Existing Concrete SY 1687 4” Concrete Walkway (In SY 1687 Brick Pavers (In Place) | linear foot | 2 | — | $60.00 | $60.00 | Nov 19, 2024, Open bid tab, contract TAB_196 ↗ |
| Barricade, sign and traffic handling (walker lane) | ls | 2 | — | $3,400 | $3,400 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Barricade, sign and traffic handling (diamond d drive) | ls | 2 | — | $4,560 | $4,560 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Concrete Downspout Pads (Diamond D Drive) | each | 2 | — | $360.00 | $360.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Soft Spot Subgrade Repair (Only as directed by the 351 Engineer) | square yard | 2 | — | $60.00 | $60.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Concrete Curb in Place | linear foot | 2 | — | $45.00 | $45.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| 361 6 inch concrete (hes) in place | square yard | 2 | — | $72.00 | $72.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Base in Place | square yard | 2 | — | $120.00 | $120.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| in Place | square yard | 2 | — | $115.00 | $115.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Block Sodding in Place | square yard | 2 | — | $10.00 | $10.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| compaction) | square yard | 2 | — | $60.00 | $60.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Tree remove (walker lane) | each | 2 | — | $1,800 | $1,800 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Highway 69 South, Beaumont | tx | 2 | — | $0.27 | $0.27 | Aug 10, 2022, Open bid tab, contract TAB_115 ↗ |
| Highway 124, Hamshire | tx | 2 | — | $0.11 | $0.11 | Aug 10, 2022, Open bid tab, contract TAB_115 ↗ |
| Viterbo Road, Beaumont | tx | 2 | — | $0.29 | $0.29 | Aug 10, 2022, Open bid tab, contract TAB_115 ↗ |
| Jade Avenue, Port Arthur | tx | 2 | — | $0.32 | $0.32 | Aug 10, 2022, Open bid tab, contract TAB_115 ↗ |
| Lakeshore Drive, Port Arthur | tx | 2 | — | $0.13 | $0.13 | Aug 10, 2022, Open bid tab, contract TAB_115 ↗ |
| Contact Person: Greg Keller 409-835- Jefferson County Annex I - Beaumont Franklin Street, Beaumont | tx | 2 | — | $0.05 | $0.05 | Aug 10, 2022, Open bid tab, contract TAB_115 ↗ |
| Remove Concrete Paving | square yard | 2 | — | $18.00 | $18.00 | Oct 15, 2024, Open bid tab, contract TAB_191 ↗ |
| Barricade, sign and traffic handling (walker lane) 13 502 ls | each | 1 | — | $3,400 | $3,400 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| Barricade, sign and traffic handling (diamond d drive) 12 502 ls | each | 1 | — | $4,560 | $4,560 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| Mobilization (MAX 3%) 11 500 LS | each | 1 | — | $5,087 | $5,087 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| Concrete Downspout Pads (Diamond D Drive) 10 N/A EA | each | 1 | — | $360.00 | $360.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| (Only as directed by the 8 9 Engineer) 351 SY | each | 1 | — | $60.00 | $60.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| Concrete Curb in Place 8 529 LF Soft Spot Subgrade Repair | each | 1 | — | $45.00 | $45.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| 251 361 6 inch concrete (hes) in place 7 sy | each | 1 | — | $72.00 | $72.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| 10 inch compaction limestone base in place 6 247 sy | each | 1 | — | $120.00 | $120.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| 8 inch compaction limestone base in place 5 247 sy | each | 1 | — | $115.00 | $115.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| Block Sodding in Place 4 162 SY | each | 1 | — | $10.00 | $10.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| in Place (includes excavation, proof rolling, backfill and compaction) 3 132 SY | each | 1 | — | $60.00 | $60.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| Remove concrete paving 2 104 sy 10 inch compaction structure fill | each | 1 | — | $18.00 | $18.00 | Oct 15, 2024, Open bid tab, 24-058 ↗ |
| Tree remove (walker lane) 1 100 ea | each | 1 | — | $1,800 | $1,800 | Oct 15, 2024, Open bid tab, 24-058 ↗ |