Skip to content
Hubstake

Agency · awarded bid prices

City of Fort Worth: awarded unit prices

11,995 winning bid prices read from 1,290 source documents, 2023–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Fort Worth

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Trench Safetylinear foot539$2.00$2.00$0.1 – $1,620Sep 17, 2026, p.1 ↗
Post - CCTV Inspectionlinear foot261$3.60$4.00$1.00 – $480.00Sep 16, 2026, p.1 ↗
Manhole Vacuum Testingeach245$250.00$200.00$2.00 – $8,892Sep 16, 2026, Open the source page, p.4 ↗
8 inch gate valveeach226$2,569$2,500$690.00 – $260,000Sep 16, 2026, p.1 ↗
4' Manholeeach216$7,303$5,000$1,000 – $31,000Sep 16, 2026, p.1 ↗
Barrier Free Ramp, Type P- 1each202$2,200$2,400$0.01 – $8,835Sep 17, 2026, p.1 ↗
1 inch water serviceeach175$1,900$1,989$25.00 – $10,000Sep 14, 2026, p.1 ↗
6 inch gate valveeach170$2,120$3,712$773.33 – $180,000Sep 14, 2026, p.1 ↗
Block Sod Placementsquare yard158$8.00$8.00$0.01 – $590.00Sep 17, 2026, p.1 ↗
2 inch conduit pvc sch 80 (t)linear foot150$21.63$27.89$4.98 – $500.00Sep 14, 2026, p.1 ↗
2 inch water serviceeach145$4,500$5,500$325.00 – $450,000Sep 16, 2026, Open the source page, p.25 ↗
12 inch gate valveeach145$4,730$5,500$1,538 – $470,000Sep 16, 2026, p.1 ↗
Epoxy Manhole Linervf140$485.00$500.00$13.00 – $10,700Sep 16, 2026, Open the source page, p.26 ↗
Traffic Controlmonth111$3,656$2,500$300.00 – $340,000Sep 16, 2026, p.1 ↗
Fire Hydranteach93$6,500$5,732$2,400 – $17,230Sep 14, 2026, p.1 ↗
Connection to existing 4 inch- 12 inch watereach77$2,500$1,000$650.00 – $18,000Sep 3, 2026, p.1 ↗
Ductile iron water fitting w/ton69$10,035$18,500$498.00 – $55,812Sep 16, 2026, p.1 ↗
Concrete Collareach68$956.12$136.00$136.00 – $3,500Sep 16, 2026, Open the source page, p.26 ↗
Epdxy Manhole Linervf61$475.00$485.00$15.00 – $1,185Sep 16, 2026, p.1 ↗
4 inch sewer servicelinear foot60$1,253$900.00$52.00 – $11,600Sep 16, 2026, Open the source page, p.5 ↗
4 inch concrete sidewalksquare foot59$7.30$4.25$4.00 – $88.00Sep 17, 2026, p.1 ↗
6 inch lime treatmentsquare yard55$4.50$4.00$2.21 – $138.00Sep 17, 2026, p.1 ↗
Topsoilcubic yard54$28.00$28.00$0.01 – $150.00Sep 17, 2026, p.1 ↗
10' Curb Inleteach52$4,550$4,000$2,500 – $14,000Sep 17, 2026, p.1 ↗
8 inch sewer pipelinear foot51$80.00$72.00$30.00 – $750.00Sep 16, 2026, p.1 ↗
Trench Water Stopseach50$683.75$350.00$250.00 – $2,836Sep 16, 2026, p.1 ↗
4 inch- 12 inch pressure plugeach48$863.50$877.00$50.00 – $8,836Aug 19, 2026, p.1 ↗
4 inch sewer serviceeach47$1,200$900.00$32.00 – $8,500Sep 16, 2026, p.1 ↗
8 inch water pipelinear foot46$60.00$54.00$45.40 – $620.00Sep 16, 2026, p.1 ↗
Remove concrete curb & gutterlinear foot46$13.00$40.00$3.00 – $59.00Sep 16, 2026, p.1 ↗
4' extra deep manholevf43$229.58$225.00$150.00 – $1,803Sep 16, 2026, p.1 ↗
4' Storm Junction Boxeach43$6,000$7,500$1,200 – $11,021Sep 17, 2026, p.1 ↗
8 inch pvc water pipelinear foot39$71.25$40.00$40.00 – $275.00Aug 24, 2026, p.1 ↗
Remove Sidewalksquare foot39$3.00$8.00$0.65 – $16.00Sep 16, 2026, p.1 ↗
4' Drop Manholeeach36$9,937$6,000$1,800 – $29,500Sep 16, 2026, p.1 ↗
Manhole adjust, minoreach36$2,194$2,516$500.00 – $6,260Aug 5, 2026, p.1 ↗
Remove concrete pavementsquare yard36$20.25$30.00$0.75 – $799.11Sep 16, 2026, p.1 ↗
20 inch casing by open cutlinear foot36$270.51$380.00$152.00 – $450.00Jul 28, 2026, p.1 ↗
15' Curb Inleteach34$5,300$5,000$4,800 – $13,597Sep 17, 2026, p.1 ↗
6 inch pvc water pipelinear foot34$74.50$58.00$35.00 – $255.00Aug 27, 2026, p.1 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Texas: statewide figures.