| Mobilization | ls | 7,759 | — | $23,000 | $0.001 – $88,900,000 | Nov 4, 2026, line 23 ↗ |
| Barricade, sign and traffic handling | month | 4,938 | — | $4,945 | $0.001 – $500,000 | Nov 4, 2026, line 24 ↗ |
| Barricade, sign and traffic handle | month | 2,631 | $2,400 | $1,000 | $0.001 – $75,000 | Mar 9, 2005, Open bid tab, 03053235 ↗ |
| Reflective pavement marker type ii-a-a | each | 2,533 | $4.50 | $7.00 | $0.04 – $940.00 | Nov 4, 2026, line 86 ↗ |
| Vegetative Watering | thousand gallons | 2,509 | $15.00 | $400.00 | $0.001 – $12,000 | Mar 4, 2025, line 3 ↗ |
| TMA (Stationary) | day | 2,469 | — | $1.00 | $0.01 – $16,487 | Nov 5, 2026, line 2 ↗ |
| Reflective pavement marker type i-c | each | 1,690 | $4.50 | $7.00 | $0.04 – $675.00 | Nov 4, 2026, line 85 ↗ |
| Temporary sediment control fence | linear foot | 1,680 | $2.10 | $3.00 | $0.001 – $21.00 | Mar 9, 2005, Open bid tab, 03053235 ↗ |
| Portable Changeable Message Sign | day | 1,653 | $97.43 | $10.00 | $0.001 – $7,870 | Nov 5, 2026, line 1 ↗ |
| Temporary sediment control fence (remove) | linear foot | 1,597 | $0.75 | $1.00 | $0.001 – $15.00 | Mar 9, 2005, Open bid tab, 03053235 ↗ |
| Reflective pavement marking type i (y) (4 inch) (solid) | linear foot | 1,554 | $0.26 | $0.47 | $0.01 – $11.00 | Mar 9, 2005, Open bid tab, 03053209 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | 1,535 | $1.00 | $1.00 | $0.01 – $34.45 | Nov 4, 2026, line 138 ↗ |
| Reflective pavement marking type i (w) (4 inch) (solid) | linear foot | 1,507 | $0.24 | $0.46 | $0.01 – $11.00 | Mar 9, 2005, Open bid tab, 03053209 ↗ |
| Cement stabilized backfill | cubic yard | 1,481 | $110.00 | $60.00 | $0.01 – $1,500 | Nov 4, 2026, line 18 ↗ |
| Remove small road sign support&assembly | each | 1,479 | $100.00 | $174.00 | $0.001 – $1,737 | Nov 4, 2026, line 34 ↗ |
| Preparing right of way | station | 1,451 | — | $2,100 | $0.01 – $572,858 | Nov 4, 2026, line 1 ↗ |
| Guardrail End Treatment (Install) | each | 1,426 | $3,057 | $3,405 | $1.00 – $9,500 | Nov 4, 2026, line 96 ↗ |
| Temporary sediment control fence (remove) | linear foot | 1,420 | $1.00 | $0.5 | $0.01 – $27.00 | Nov 4, 2026, line 28 ↗ |
| Reflective pavement marker type ii-c-r | each | 1,418 | $4.30 | $4.20 | $0.04 – $630.00 | Nov 4, 2026, line 288 ↗ |
| Temporary sediment control fence (install) | linear foot | 1,416 | $4.00 | $4.00 | $0.01 – $387.00 | Nov 4, 2026, line 27 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | 1,402 | $7.00 | $14.00 | $1.00 – $120.00 | Nov 4, 2026, line 55 ↗ |
| Rock Filter Dams (Remove) | linear foot | 1,364 | $10.00 | $44.00 | $0.01 – $213.00 | Nov 4, 2026, line 39 ↗ |
| Wk zn pavement marking sht terminal (tab)type y-2 | each | 1,350 | $1.00 | $3.00 | $0.01 – $110.00 | Nov 4, 2026, line 75 ↗ |
| Portable Changeable Message Sign | each | 1,331 | — | $3,511 | $0.01 – $81,880 | Nov 4, 2026, line 35 ↗ |
| Metal w-beam guard fence (timber post) | linear foot | 1,300 | $24.75 | $25.50 | $0.05 – $638.22 | Nov 4, 2026, line 88 ↗ |
| TMA (Mobile Operation) | day | 1,295 | — | $587.00 | $0.01 – $2,610 | Nov 4, 2026, line 37 ↗ |
| Biodegradable erosion control logs (remove) | linear foot | 1,244 | $1.15 | $0.5 | $0.01 – $65.00 | Nov 4, 2026, line 30 ↗ |
| Wk zn pavement marking sht terminal (tab)type w | each | 1,169 | $1.00 | $3.00 | $0.01 – $116.91 | Nov 4, 2026, line 74 ↗ |
| Rais pavement marker class b (reflective) type ii-a-a | each | 1,136 | $3.50 | $15.00 | $0.55 – $360.00 | Feb 8, 2005, Open bid tab, 02053038 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | 1,125 | $600.00 | $675.00 | $1.00 – $3,900 | Nov 4, 2026, line 46 ↗ |
| Temporary sediment control fence (remove & replac) | linear foot | 1,104 | $2.00 | $4.00 | $0.001 – $22.00 | Mar 9, 2005, Open bid tab, 03053235 ↗ |
| Reflective pavement marking type i (w) (8 inch) (solid) | linear foot | 1,074 | $0.6 | $0.92 | $0.05 – $10.00 | Mar 9, 2005, Open bid tab, 03053209 ↗ |
| Mobilization (Callout) | each | 1,035 | — | $1.00 | $0.001 – $535,000 | Nov 5, 2026, line 1 ↗ |
| Reflective pavement marking type i (w) (24 inch) (solid) | linear foot | 1,027 | $5.00 | $3.43 | $0.21 – $21.00 | Mar 9, 2005, Open bid tab, 03053209 ↗ |
| Riprap (concrete)(class b) | cubic yard | 1,016 | $300.00 | $717.00 | $1.00 – $11,254 | Nov 4, 2026, line 22 ↗ |
| Reflective pavement marking type i (w) (4 inch) (broken) | linear foot | 1,008 | $0.26 | $0.46 | $0.01 – $15.00 | Mar 9, 2005, Open bid tab, 03053209 ↗ |
| Reflective pavement marking type i (y) (4 inch) (broken) | linear foot | 1,002 | $0.25 | $0.47 | $0.01 – $100.00 | Mar 9, 2005, Open bid tab, 03053209 ↗ |
| In small road sign support&assembly type10bwg(1)sa(p) | each | 998 | $700.00 | $1,369 | $3.65 – $4,000 | Nov 4, 2026, line 60 ↗ |
| Metal beam guard fence transition (thrie-beam) | each | 994 | $1,900 | $1,795 | $1.00 – $8,850 | Nov 4, 2026, line 89 ↗ |
| Excavation (roadway) | cubic yard | 958 | $5.75 | $23.00 | $0.27 – $167.00 | Mar 9, 2005, Open bid tab, 03053235 ↗ |