| Biodegradable erosion control logs (remove) | linear foot | $1.25 | $1.00 – $2.58 | 59 | Oct 7, 2026, line 28 ↗ |
| Reflective pavement marker type ii-c-r | each | $5.18 | $4.25 – $7.13 | 44 | Oct 14, 2026, line 15 ↗ |
| Portable Changeable Message Sign | day | $100.00 | $65.41 – $150.33 | 43 | Oct 14, 2026, line 7 ↗ |
| Biodegradable erosion control logs (install) (18 inch) | linear foot | $6.25 | $4.25 – $10.00 | 33 | Oct 7, 2026, line 10 ↗ |
| Electrical conductor (no.6) bare | linear foot | $2.88 | $2.00 – $3.26 | 32 | Oct 7, 2026, line 39 ↗ |
| Electrical conductor (no.6) insulated | linear foot | $3.00 | $2.27 – $3.55 | 31 | Oct 7, 2026, line 40 ↗ |
| Block Sodding | square yard | $8.00 | $5.08 – $11.25 | 31 | Sep 3, 2026, line 6 ↗ |
| Pavement surface preparation for marking (6 inch) | linear foot | $0.26 | $0.1 – $0.5 | 29 | Sep 3, 2026, line 179 ↗ |
| Electrical conductor (no.8) insulated | linear foot | $2.88 | $2.00 – $3.13 | 28 | Oct 7, 2026, line 38 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | $1.45 | $1.02 – $2.00 | 27 | Oct 14, 2026, line 11 ↗ |
| Pavement sler 6 inch | linear foot | $0.3 | $0.2 – $0.45 | 27 | Sep 3, 2026, line 129 ↗ |
| Pavement sler 24 inch | linear foot | $1.98 | $1.03 – $2.91 | 26 | Sep 3, 2026, line 132 ↗ |
| Reflective pavement marker type ii-a-a | each | $5.75 | $4.70 – $8.71 | 26 | Sep 3, 2026, line 165 ↗ |
| Temporary sediment control fence (remove) | linear foot | $1.00 | $1.00 – $1.55 | 26 | Oct 7, 2026, line 26 ↗ |
| Tack Coat | gallon | $4.10 | $1.53 – $6.00 | 26 | Oct 14, 2026, line 2 ↗ |
| Conduit (pvc) (sch 80) (2 inch) | linear foot | $24.00 | $21.00 – $28.00 | 25 | Oct 7, 2026, line 23 ↗ |
| Temporary sediment control fence (install) | linear foot | $4.00 | $3.10 – $5.00 | 25 | Oct 7, 2026, line 25 ↗ |
| Pedestrian pole assembly | each | $3,401 | $2,455 – $3,932 | 24 | Oct 7, 2026, line 67 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | $8.50 | $6.54 – $10.78 | 24 | Oct 7, 2026, line 51 ↗ |
| Reflective pavement marking type i (y)6 inch(solid)(100mil) | linear foot | $1.00 | $0.68 – $1.50 | 24 | Oct 14, 2026, line 14 ↗ |
| Elim ext pm & mrks (8 inch) | linear foot | $1.17 | $0.875 – $2.11 | 24 | Sep 3, 2026, line 169 ↗ |
| Aluminum sign (type a) | square foot | $41.40 | $35.11 – $43.54 | 24 | Oct 7, 2026, line 45 ↗ |
| Ground box type d (162922)w/apron | each | $2,418 | $1,946 – $3,000 | 23 | Oct 7, 2026, line 43 ↗ |
| Elim ext pm & mrks (6 inch) | linear foot | $0.8 | $0.535 – $1.15 | 23 | Oct 7, 2026, line 55 ↗ |
| Riprap (concrete)(4 in) | cubic yard | $1,100 | $723.55 – $1,611 | 23 | Oct 7, 2026, line 12 ↗ |
| Reflective pavement marking type i (w)6 inch(solid)(100mil) | linear foot | $1.00 | $0.67 – $1.38 | 23 | Oct 14, 2026, line 13 ↗ |
| Trf signal cbl (type c)(12 awg)(2 conductor) | linear foot | $3.10 | $2.65 – $3.80 | 23 | Oct 7, 2026, line 65 ↗ |
| Drill shaft (trf signal pole) (36 in) | linear foot | $610.60 | $481.98 – $693.75 | 22 | Sep 3, 2026, line 11 ↗ |
| Pavement sler 8 inch | linear foot | $0.35 | $0.3 – $0.623 | 22 | Sep 3, 2026, line 130 ↗ |
| Pavement Sler (Arrow) | each | $48.00 | $25.80 – $68.25 | 22 | Sep 3, 2026, line 133 ↗ |
| Ground box type a (122311)w/apron | each | $1,845 | $1,596 – $2,392 | 22 | Oct 7, 2026, line 42 ↗ |
| Biodegradable erosion control logs (install) (12 inch) | linear foot | $5.88 | $4.05 – $7.88 | 22 | Oct 7, 2026, line 27 ↗ |
| Elim ext pm & mrks (24 inch) | linear foot | $4.50 | $3.00 – $5.88 | 22 | Sep 3, 2026, line 171 ↗ |
| Downstream Anchor Terminal Section | each | $1,409 | $1,235 – $1,977 | 22 | Oct 7, 2026, line 14 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | $721.20 | $650.00 – $844.70 | 22 | Oct 7, 2026, line 4 ↗ |
| Reflective pavement marking type i (w)6 inch(broken)(100mil) | linear foot | $1.15 | $0.7 – $1.65 | 22 | Sep 3, 2026, line 143 ↗ |
| Trf signal cbl (type a)(14 awg)(7 conductor) | linear foot | $4.00 | $3.26 – $4.50 | 22 | Oct 7, 2026, line 63 ↗ |
| Ground Box (Prepare) | each | $400.00 | $244.71 – $700.00 | 21 | Oct 7, 2026, line 78 ↗ |
| Concrete curb (type ii) | linear foot | $45.00 | $25.00 – $68.00 | 21 | Sep 3, 2026, line 23 ↗ |
| Vehicle signal section (12 inch)led(yellow) | each | $398.00 | $300.00 – $450.00 | 21 | Oct 7, 2026, line 59 ↗ |
| Pavement surface preparation for marking (arrow) | each | $24.00 | $15.00 – $56.00 | 21 | Sep 3, 2026, line 183 ↗ |
| Guardrail End Treatment (Install) | each | $3,448 | $3,100 – $4,000 | 21 | Oct 7, 2026, line 16 ↗ |
| Remove Metal Beam Guard Fence | linear foot | $3.25 | $2.60 – $6.25 | 20 | Oct 6, 2026, line 29 ↗ |
| Vehicle signal section (12 inch)led(red) | each | $386.50 | $295.00 – $457.50 | 20 | Oct 7, 2026, line 60 ↗ |
| Pedestrian signal section (led)(countdown) | each | $940.00 | $730.00 – $1,058 | 20 | Oct 7, 2026, line 61 ↗ |
| Pedestrian detector push button (aps) | each | $1,115 | $945.00 – $1,538 | 20 | Oct 7, 2026, line 68 ↗ |
| Pedestrian detector controller unit | each | $4,240 | $3,835 – $5,375 | 20 | Oct 7, 2026, line 69 ↗ |
| Remove small road sign support&assembly | each | $121.26 | $104.50 – $205.25 | 20 | Oct 7, 2026, line 49 ↗ |
| Elim Ext PM & Mrks (Arrow) | each | $71.15 | $56.50 – $101.88 | 20 | Sep 3, 2026, line 172 ↗ |
| Conduit (Prepare) | linear foot | $4.27 | $1.90 – $7.07 | 20 | Oct 7, 2026, line 26 ↗ |
| Trf signal cbl (type a)(14 awg)(5 conductor) | linear foot | $3.47 | $2.95 – $4.00 | 20 | Sep 3, 2026, line 210 ↗ |
| Trf signal cbl (type a)(14 awg)(20 conductor) | linear foot | $7.60 | $6.61 – $11.00 | 20 | Sep 3, 2026, line 216 ↗ |
| Curb ramp (type 2) | each | $3,400 | $2,800 – $4,920 | 19 | Oct 7, 2026, line 31 ↗ |
| Curb ramp (type 7) | each | $3,300 | $2,838 – $4,962 | 19 | Sep 3, 2026, line 34 ↗ |
| Vehicle signal section (12 inch)led(grn) | each | $375.00 | $290.00 – $450.00 | 19 | Sep 3, 2026, line 199 ↗ |
| Vehicle signal section (12 inch)led(grn arw) | each | $375.00 | $290.00 – $458.50 | 19 | Sep 3, 2026, line 200 ↗ |
| Vehicle signal section (12 inch)led(yellow arw) | each | $375.00 | $290.00 – $458.50 | 19 | Sep 3, 2026, line 202 ↗ |
| Vehicle signal section (12 inch)led(red arw) | each | $375.00 | $290.00 – $458.50 | 19 | Sep 3, 2026, line 204 ↗ |
| Pavement surface preparation for marking (word) | each | $25.00 | $17.38 – $66.39 | 19 | Sep 3, 2026, line 185 ↗ |
| Guardrail End Treatment (Remove) | each | $309.91 | $252.50 – $500.00 | 19 | Oct 6, 2026, line 33 ↗ |
| Drill shaft (trf signal pole) (48 in) | linear foot | $880.00 | $555.53 – $950.00 | 19 | Sep 3, 2026, line 12 ↗ |
| Electrical conductor (no.12) insulated | linear foot | $2.00 | $1.50 – $2.52 | 19 | Oct 7, 2026, line 36 ↗ |
| In small road sign support&assembly type10bwg(1)sa(t) | each | $950.00 | $814.01 – $1,020 | 19 | Sep 3, 2026, line 97 ↗ |
| Reflective pavement marking type i (w)12 inch(solid)(100mil) | linear foot | $4.20 | $3.25 – $4.97 | 18 | Oct 14, 2026, line 12 ↗ |
| Conduit (pvc) (sch 40) (2 inch) | linear foot | $20.51 | $13.56 – $25.75 | 18 | Oct 7, 2026, line 33 ↗ |
| Curb ramp (type 1) | each | $3,181 | $2,635 – $4,000 | 17 | Oct 7, 2026, line 30 ↗ |
| Conduit (pvc) (sch 40) (3 inch) | linear foot | $25.00 | $20.00 – $27.00 | 17 | Oct 7, 2026, line 34 ↗ |