ItemPerMedianMiddle halfWinning bidsLatest source document
Temporary info signingsquare foot$18.00$16.00 – $23.7554Sep 18, 2026, Open bid tab, 62Y03 ↗
Bit Matls Tack Ctpound$0.01$0.01 – $0.0147Jun 12, 2026, Open bid tab, 80C48 ↗
Earth Excavationcubic yard$48.00$35.25 – $78.7542Jun 12, 2026, Open bid tab, 80C48 ↗
Thpl Pvt Mk Line 4linear foot$1.10$0.84 – $1.4541Jun 12, 2026, Open bid tab, 80C48 ↗
Non Spl Waste Disposlcubic yard$80.00$65.00 – $95.0041Jun 12, 2026, Open bid tab, 80C48 ↗
Soil Disposal Analyeach$1,280$994.50 – $1,50041Jun 12, 2026, Open bid tab, 80C48 ↗
Thpl Pvt Mk Line 12linear foot$3.32$3.00 – $4.4340Jun 12, 2026, Open bid tab, 80C48 ↗
Thpl Pvt Mk Line 24linear foot$6.05$5.75 – $8.0739Apr 24, 2026, Open bid tab, 61M41 ↗
Thpl Pvt Mk Line 6linear foot$1.65$1.30 – $2.1237Jun 12, 2026, Open bid tab, 80C48 ↗
Pc concrete sidewalk 5square foot$12.16$10.21 – $16.0034Jun 12, 2026, Open bid tab, 80C48 ↗
Hot mix asphalt sc il-9.5 d n50ton$108.98$95.10 – $230.5031Apr 24, 2026, Open bid tab, 61M34 ↗
Topsoil F & P 4square yard$6.00$4.25 – $7.5831Jun 12, 2026, Open bid tab, 80C48 ↗
Sidewalk removesquare foot$3.00$1.62 – $4.0730Jun 12, 2026, Open bid tab, 80C48 ↗
Thpl pvt mk ltr & symbolsquare foot$5.80$5.61 – $6.5030Jun 12, 2026, Open bid tab, 80C48 ↗
Inlet Filterseach$194.00$180.00 – $225.0030Jun 12, 2026, Open bid tab, 80C48 ↗
Long joint seallinear foot$3.73$3.30 – $4.9030Jun 12, 2026, Open bid tab, 80C48 ↗
Nitrogen Fert Nutrpound$3.00$2.80 – $3.3827Jun 12, 2026, Open bid tab, 80C48 ↗
Potassium Fert Nutrpound$3.00$2.80 – $3.3827Jun 12, 2026, Open bid tab, 80C48 ↗
Sodding Salt Tolerantsquare yard$22.95$12.00 – $42.5027Jun 12, 2026, Open bid tab, 80C48 ↗
Mix cr joint flangewyston$150.00$100.00 – $300.0027Jun 12, 2026, Open bid tab, 80C48 ↗
Detectable Warningssquare foot$41.42$36.68 – $53.9926Jun 12, 2026, Open bid tab, 80C48 ↗
Perimeter erosion barlinear foot$3.25$2.75 – $3.9525Jun 12, 2026, Open bid tab, 80D46 ↗
Raised ref pvt mk removeeach$16.99$12.00 – $19.1025Jun 12, 2026, Open bid tab, 80C48 ↗
Aggregate subgrade improvecubic yard$65.00$50.00 – $77.0025Jun 12, 2026, Open bid tab, 80D46 ↗
Drive pavement removesquare yard$20.00$12.00 – $24.5025Apr 24, 2026, Open bid tab, 61M34 ↗
Combination curb gutter removelinear foot$10.00$7.45 – $10.2524Jun 12, 2026, Open bid tab, 80D46 ↗
Thpl Pvt Mk Line 8linear foot$1.90$1.55 – $1.9524Feb 27, 2026, Open bid tab, 80B75 ↗
Pavement removesquare yard$20.00$15.00 – $27.1823Apr 24, 2026, Open bid tab, 61M41 ↗
Remove & disp uns materialcubic yard$40.00$30.00 – $90.6723Jun 12, 2026, Open bid tab, 80D46 ↗
Temporary ditch checkslinear foot$14.00$7.00 – $15.0023Jun 12, 2026, Open bid tab, 80D46 ↗
Temporary erosion control seedpound$5.00$4.00 – $7.0021Jun 12, 2026, Open bid tab, 80D46 ↗
Elcbl C Signal 14 3Clinear foot$1.90$1.60 – $2.3021Feb 27, 2026, Open bid tab, 80B75 ↗
Temporary concrete barrierlinear foot$26.50$21.88 – $38.0020Jun 12, 2026, Open bid tab, 80D46 ↗
Sign Panel T1square foot$30.00$29.50 – $39.7120Apr 24, 2026, Open bid tab, 61M41 ↗
Geotech fabric f/gr stabilizedsquare yard$2.45$1.75 – $3.7020Jun 12, 2026, Open bid tab, 80D46 ↗
Fr & Lids Adjust Spleach$1,350$1,250 – $1,57920Feb 27, 2026, Open bid tab, 80B75 ↗
Det loop replacelinear foot$17.88$16.54 – $31.9920Jan 16, 2026, Open bid tab, 61M08 ↗
Aggregate subgrade impr 12square yard$28.50$24.00 – $34.5618Jun 12, 2026, Open bid tab, 80C48 ↗
P hot mix asphalt bc il-4.75 n50ton$113.80$110.00 – $120.4517Jun 12, 2026, Open bid tab, 80C48 ↗
Hot mix asphalt sc il-9.5 d n70ton$93.50$83.00 – $140.9817Jun 12, 2026, Open bid tab, 80D46 ↗
Remove ex ts equipeach$2,400$1,200 – $3,52017Jun 12, 2026, Open bid tab, 80C48 ↗
Trench Backfillcubic yard$52.50$40.00 – $76.7016Apr 24, 2026, Open bid tab, 61M41 ↗
Erosion control blanketsquare yard$1.58$1.24 – $2.1116Jun 12, 2026, Open bid tab, 80C48 ↗
Teles steel sin supportlinear foot$17.00$15.23 – $18.0016Apr 24, 2026, Open bid tab, 61M41 ↗
Main ex tr signal instaleach$5,050$3,346 – $7,95016Jun 12, 2026, Open bid tab, 80C48 ↗
Aggregate base course b 4square yard$9.00$6.50 – $14.2516Jun 12, 2026, Open bid tab, 80C48 ↗
Storm sewer remove 12linear foot$19.50$12.00 – $35.0015Apr 24, 2026, Open bid tab, 61M41 ↗
Combination cc&g tb6.12linear foot$38.00$29.21 – $49.5015Jan 16, 2026, Open bid tab, 61L42 ↗
Seeding class 2aacre$3,682$2,638 – $4,53414Jun 12, 2026, Open bid tab, 80C48 ↗
Undrgrd C Galvs 2linear foot$33.25$29.15 – $46.9514Feb 27, 2026, Open bid tab, 80B75 ↗
Drill Ex Handholeeach$617.00$442.08 – $735.0014Feb 27, 2026, Open bid tab, 80B75 ↗
Drainage Str Cleanedeach$375.00$330.00 – $500.0014Jun 12, 2026, Open bid tab, 62V77 ↗
Tree Trunk Protectioneach$155.00$103.00 – $200.0014Apr 24, 2026, Open bid tab, 61M41 ↗
Tree Root Pruningeach$122.50$96.50 – $147.5014Apr 24, 2026, Open bid tab, 61M41 ↗
Accessible pedestrian signaleach$2,273$1,937 – $3,40013Jun 12, 2026, Open bid tab, 80C48 ↗
Temporary Fencelinear foot$4.00$3.00 – $5.0013Jun 12, 2026, Open bid tab, 80D46 ↗
Temporary tr signal timingeach$1,285$600.41 – $1,83013Jun 12, 2026, Open bid tab, 80C48 ↗
Remove elcbl fr conlinear foot$0.7$0.6 – $1.6513Feb 27, 2026, Open bid tab, 80B75 ↗
Elcbl C Egrdc 6 1Clinear foot$2.60$2.35 – $3.1413Feb 27, 2026, Open bid tab, 80B75 ↗
Temporary erosion control blanksquare yard$1.00$0.9 – $1.0612Jun 12, 2026, Open bid tab, 80D46 ↗
Reinforced bars, epoxy ctdpound$1.97$1.73 – $2.8912Jun 12, 2026, Open bid tab, 80D46 ↗
Elcbl C Signal 14 2Clinear foot$1.90$1.65 – $2.9212Feb 27, 2026, Open bid tab, 80B75 ↗
Aggregate wedge shoulder type bton$62.83$50.50 – $96.2512Jul 31, 2026, Open bid tab, 62V79 ↗
Modified ureth pm line 4linear foot$1.32$1.08 – $3.7712Jul 31, 2026, Open bid tab, 62V79 ↗