Construction unit costs in Will County, IL

Median awarded unit prices for 80 items on public projects in Will County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Illinois › Will County

ItemPerMedianMiddle halfWinning bidsLatest source document
Temporary info signingsquare foot$25.00$20.00 – $30.0081Sep 18, 2026, Open bid tab, 80C95 ↗
Bit Matls Tack Ctpound$0.01$0.01 – $0.0169Sep 18, 2026, Open bid tab, 80C95 ↗
Protective Coatsquare yard$1.50$1.00 – $2.3567Sep 18, 2026, Open bid tab, 80C95 ↗
Thpl Pvt Mk Line 4linear foot$0.94$0.765 – $1.6562Sep 18, 2026, Open bid tab, 80C95 ↗
Earth Excavationcubic yard$36.50$23.00 – $71.2560Sep 18, 2026, Open bid tab, 80C95 ↗
Non Spl Waste Disposlcubic yard$78.00$65.00 – $90.0053Sep 18, 2026, Open bid tab, 80C95 ↗
Soil Disposal Analyeach$1,600$1,484 – $1,76252Sep 18, 2026, Open bid tab, 80C95 ↗
Thpl Pvt Mk Line 24linear foot$6.00$5.42 – $8.6251Sep 18, 2026, Open bid tab, 80C95 ↗
Raised reflective pavement mkreach$54.45$45.38 – $81.4550Sep 18, 2026, Open bid tab, 80C95 ↗
Thpl Pvt Mk Line 12linear foot$3.25$2.85 – $3.6747Sep 18, 2026, Open bid tab, 80C95 ↗
Long joint seallinear foot$3.69$3.00 – $5.3947Sep 18, 2026, Open bid tab, 80C95 ↗
Sidewalk removesquare foot$3.00$2.50 – $4.8846Sep 18, 2026, Open bid tab, 80C95 ↗
Thpl Pvt Mk Line 6linear foot$1.48$1.10 – $1.9846Sep 18, 2026, Open bid tab, 80C95 ↗
Nitrogen Fert Nutrpound$3.15$3.00 – $3.3044Jun 12, 2026, Open bid tab, 62X28 ↗
Potassium Fert Nutrpound$3.00$3.00 – $3.3043Jun 12, 2026, Open bid tab, 62X28 ↗
Thpl pvt mk ltr & symbolsquare foot$5.75$5.12 – $6.8043Sep 18, 2026, Open bid tab, 80C95 ↗
Pc concrete sidewalk 5square foot$10.00$9.00 – $11.5041Sep 18, 2026, Open bid tab, 80C95 ↗
Pavement removesquare yard$15.00$13.00 – $25.0041Apr 24, 2026, Open bid tab, 80B05 ↗
Topsoil F & P 4square yard$6.50$5.25 – $12.5041Sep 18, 2026, Open bid tab, 80C95 ↗
Perimeter erosion barlinear foot$2.98$2.28 – $3.8338Jun 12, 2026, Open bid tab, 62X37 ↗
Detectable Warningssquare foot$35.00$26.00 – $40.0037Sep 18, 2026, Open bid tab, 80C95 ↗
Pvt marking remove water blastsquare foot$2.45$1.30 – $5.0037Apr 24, 2026, Open bid tab, 80B05 ↗
Hot mix asphalt sc il-9.5 d n70ton$90.00$83.75 – $126.0035Sep 18, 2026, Open bid tab, 80C95 ↗
Guardrail removelinear foot$9.73$8.58 – $12.0034Jun 12, 2026, Open bid tab, 62X28 ↗
Combination curb gutter removelinear foot$10.00$8.00 – $12.0033Apr 24, 2026, Open bid tab, 62V71 ↗
Undrgrd C Galvs 2linear foot$42.90$35.20 – $56.3833Sep 18, 2026, Open bid tab, 80C95 ↗
Aggregate subgrade improvecubic yard$44.00$40.00 – $50.0033Apr 24, 2026, Open bid tab, 80B31 ↗
Aggregate subgrade impr 12square yard$19.00$14.94 – $25.8932Apr 24, 2026, Open bid tab, 80B31 ↗
Reinforced bars, epoxy ctdpound$2.25$1.84 – $3.1632Jun 12, 2026, Open bid tab, 62X28 ↗
Remove & disp uns materialcubic yard$25.00$22.00 – $44.8832Apr 24, 2026, Open bid tab, 80B31 ↗
Inlet Filterseach$163.00$127.75 – $241.5232Feb 27, 2026, Open bid tab, 62R23 ↗
Pavement marking remove water blsquare foot$2.48$1.10 – $3.1731Sep 22, 2023, Open bid tab, 62R27 ↗
Geotech fabric f/gr stabilizedsquare yard$2.75$2.23 – $3.7531Apr 24, 2026, Open bid tab, 80B31 ↗
Drive pavement removesquare yard$14.00$10.00 – $23.7531Sep 18, 2026, Open bid tab, 80C95 ↗
Temporary pvt mk line 4 - paintlinear foot$0.01$0.01 – $0.0130Sep 18, 2026, Open bid tab, 80C95 ↗
Erosion control blanketsquare yard$1.32$1.10 – $5.5029Jun 12, 2026, Open bid tab, 62X28 ↗
Sign Panel T1square foot$30.25$27.50 – $41.8029Feb 27, 2026, Open bid tab, 62R23 ↗
Tr Bar Trm T1 Spl Taneach$4,024$3,848 – $4,20028Jun 12, 2026, Open bid tab, 62X28 ↗
Barrier wall ref type ceach$10.00$7.92 – $15.0028Jan 16, 2026, Open bid tab, 62F94 ↗
Drainage Str Cleanedeach$458.50$398.75 – $1,00028Sep 18, 2026, Open bid tab, 80C95 ↗
Thpl Pvt Mk Line 8linear foot$2.04$1.76 – $2.2728Sep 18, 2026, Open bid tab, 80C95 ↗
Cc&g rmvl replace > 10ftlinear foot$65.00$50.38 – $82.5027Sep 18, 2026, Open bid tab, 80C95 ↗
Temporary tr signal timingeach$800.00$605.00 – $1,56027Apr 24, 2026, Open bid tab, 80B46 ↗
Temporary erosion control seedpound$3.10$1.30 – $5.7527Jun 12, 2026, Open bid tab, 80B77 ↗
Temporary ditch checkslinear foot$9.95$6.86 – $11.2527Feb 27, 2026, Open bid tab, 61M25 ↗
Hot mix asphalt sc il-9.5 d n50ton$102.50$86.25 – $161.7526Sep 18, 2026, Open bid tab, 80C95 ↗
Trench Backfillcubic yard$50.00$40.00 – $60.0026Apr 24, 2026, Open bid tab, 62V71 ↗
Spbgr type a 6ft postlinear foot$35.60$32.78 – $42.5926Jun 12, 2026, Open bid tab, 62X28 ↗
Pin temporary concrete barriereach$20.00$15.00 – $25.0025Feb 27, 2026, Open bid tab, 62R23 ↗
Seeding class 2aacre$2,662$2,250 – $4,49925Jun 12, 2026, Open bid tab, 80B77 ↗
Sodding Salt Tolerantsquare yard$32.00$15.00 – $60.0025Sep 18, 2026, Open bid tab, 80C95 ↗
Elcbl C Egrdc 6 1Clinear foot$3.85$3.50 – $6.0025Sep 18, 2026, Open bid tab, 80C95 ↗
Fr & Lids Adjust Spleach$1,200$1,000 – $1,40025Sep 18, 2026, Open bid tab, 80C95 ↗
Concrete structurecubic yard$1,309$1,075 – $2,05024Jun 12, 2026, Open bid tab, 62X28 ↗
Combination cc&g tb6.12linear foot$42.25$30.00 – $50.1524Apr 24, 2026, Open bid tab, 62V71 ↗
Main ex tr signal instaleach$2,520$1,772 – $4,40024Sep 18, 2026, Open bid tab, 80C95 ↗
Det Loop T1linear foot$30.50$22.07 – $35.1424Sep 18, 2026, Open bid tab, 80C95 ↗
Modified ureth pm line 12linear foot$4.61$3.46 – $10.3224Jul 31, 2026, Open bid tab, 62V46 ↗
Fence removelinear foot$8.00$6.58 – $10.7223Feb 27, 2026, Open bid tab, 62R23 ↗
Teles steel sin supportlinear foot$17.60$16.25 – $24.2023Apr 24, 2026, Open bid tab, 80B76 ↗
Concrete support-strcubic yard$1,400$1,200 – $2,50023Feb 27, 2026, Open bid tab, 61M25 ↗
Bit Matls Pr Ctpound$0.01$0.01 – $0.0123Apr 24, 2026, Open bid tab, 80B31 ↗
Cc&g rmvl replace < = 10linear foot$70.00$59.00 – $104.6922Sep 18, 2026, Open bid tab, 80C95 ↗
Structure Excavationcubic yard$37.48$35.00 – $45.0022Jun 12, 2026, Open bid tab, 62X28 ↗
Ss Cleaned 12linear foot$3.98$2.25 – $6.9022Sep 18, 2026, Open bid tab, 80C95 ↗
Modified ureth pm line 6linear foot$2.27$1.42 – $4.9422Jul 31, 2026, Open bid tab, 62V46 ↗
Topsoil excavation & placcubic yard$22.00$20.00 – $35.0021Jun 12, 2026, Open bid tab, 80B77 ↗
Concrete removecubic yard$2,500$1,500 – $3,00021Jun 12, 2026, Open bid tab, 62X28 ↗
Remove elcbl fr conlinear foot$1.54$1.00 – $2.2321Sep 18, 2026, Open bid tab, 80C95 ↗
Hd Handholeeach$5,249$3,850 – $5,70021Sep 18, 2026, Open bid tab, 80C95 ↗
Det loop replacelinear foot$27.00$20.00 – $30.0021Feb 27, 2026, Open bid tab, 80B13 ↗
Temporary soil reten systmsquare foot$50.00$45.00 – $55.0021Feb 27, 2026, Open bid tab, 62R23 ↗
Elcbl C Signal 14 3Clinear foot$2.67$2.17 – $3.8620Sep 18, 2026, Open bid tab, 80C95 ↗
Elcbl C Lead 14 1Prlinear foot$2.53$2.07 – $3.1720Sep 18, 2026, Open bid tab, 80C95 ↗
Sub granular mat b 4square yard$8.00$7.00 – $15.7020Feb 27, 2026, Open bid tab, 62P01 ↗
Rebuild Ex Handholeeach$2,325$2,075 – $3,14620Sep 18, 2026, Open bid tab, 80C95 ↗
Rel temporary concrete barrierlinear foot$15.00$11.12 – $15.7520Feb 27, 2026, Open bid tab, 62P01 ↗
Welded wire reinforcedsquare yard$25.00$12.75 – $30.0020Jun 12, 2026, Open bid tab, 80B77 ↗
Modified ureth pm ltr-symbolsquare foot$7.95$5.94 – $10.0020Jul 31, 2026, Open bid tab, 62V46 ↗
Accessible pedestrian signaleach$2,127$1,939 – $2,39219Apr 24, 2026, Open bid tab, 62V71 ↗