| Temporary info signing | square foot | $20.00 | $16.00 – $25.00 | 279 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Protective Coat | square yard | $1.00 | $1.00 – $2.00 | 237 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl Pvt Mk Line 4 | linear foot | $0.94 | $0.75 – $1.40 | 234 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Sidewalk remove | square foot | $3.00 | $2.00 – $4.00 | 233 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Earth Excavation | cubic yard | $60.00 | $44.50 – $90.00 | 227 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Non Spl Waste Disposl | cubic yard | $95.00 | $75.00 – $120.00 | 224 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Soil Disposal Analy | each | $1,450 | $1,138 – $1,681 | 224 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Pc concrete sidewalk 5 | square foot | $10.86 | $9.25 – $14.00 | 217 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl Pvt Mk Line 12 | linear foot | $3.05 | $2.50 – $4.25 | 215 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl Pvt Mk Line 24 | linear foot | $6.00 | $5.50 – $8.00 | 209 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl Pvt Mk Line 6 | linear foot | $1.35 | $1.10 – $2.00 | 205 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Topsoil F & P 4 | square yard | $6.60 | $5.60 – $12.00 | 198 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl pvt mk ltr & symbol | square foot | $5.85 | $5.25 – $6.57 | 187 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Pvt marking remove water blast | square foot | $2.00 | $1.20 – $4.00 | 176 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Long joint seal | linear foot | $3.50 | $2.89 – $5.00 | 176 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Detectable Warnings | square foot | $39.75 | $30.00 – $44.98 | 175 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Raised ref pvt mk remove | each | $15.00 | $10.00 – $24.00 | 171 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Sodding Salt Tolerant | square yard | $20.00 | $13.05 – $35.00 | 165 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Inlet Filters | each | $200.00 | $150.00 – $250.00 | 159 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Raised reflective pavement mkr | each | $49.25 | $38.00 – $76.05 | 156 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Combination curb gutter remove | linear foot | $10.00 | $8.00 – $15.00 | 151 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Drive pavement remove | square yard | $20.00 | $15.00 – $29.60 | 147 | Sep 18, 2026, Open bid tab, 62W73 ↗ |
| Nitrogen Fert Nutr | pound | $3.00 | $3.00 – $5.00 | 144 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Potassium Fert Nutr | pound | $3.00 | $3.00 – $5.00 | 144 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Main ex tr signal instal | each | $5,000 | $1,917 – $7,980 | 142 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Undrgrd C Galvs 2 | linear foot | $52.97 | $37.09 – $77.30 | 136 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Drainage Str Cleaned | each | $393.00 | $350.00 – $500.00 | 126 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Hot mix asphalt sc il-9.5 d n50 | ton | $130.00 | $96.50 – $230.00 | 125 | Sep 18, 2026, Open bid tab, 62W73 ↗ |
| Fr & Lids Adjust Spl | each | $1,200 | $1,000 – $1,335 | 123 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Accessible pedestrian signal | each | $2,100 | $1,733 – $2,550 | 121 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Det Loop T1 | linear foot | $29.76 | $24.80 – $38.50 | 121 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Remove & disp uns material | cubic yard | $50.00 | $29.94 – $72.00 | 120 | Sep 18, 2026, Open bid tab, 62V90 ↗ |
| Sign Panel T1 | square foot | $35.00 | $27.25 – $46.35 | 119 | Sep 18, 2026, Open bid tab, 62W73 ↗ |
| Aggregate subgrade improve | cubic yard | $65.00 | $50.00 – $80.00 | 116 | Jul 31, 2026, Open bid tab, 61K19 ↗ |
| Hot mix asphalt sc il-9.5 d n70 | ton | $115.00 | $94.67 – $257.93 | 115 | Sep 18, 2026, Open bid tab, 62W73 ↗ |
| Remove elcbl fr con | linear foot | $0.95 | $0.615 – $2.26 | 115 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Cc&g rmvl replace > 10ft | linear foot | $61.00 | $50.00 – $76.75 | 114 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Drill Ex Handhole | each | $555.74 | $417.81 – $836.25 | 112 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Pavement remove | square yard | $20.00 | $13.40 – $34.28 | 111 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Elcbl C Signal 14 2C | linear foot | $2.64 | $1.85 – $3.82 | 111 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Concrete fdn type a 12d | linear foot | $349.08 | $303.93 – $450.00 | 109 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Elcbl C Egrdc 6 1C | linear foot | $3.39 | $2.76 – $4.97 | 108 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Trench Backfill | cubic yard | $58.50 | $35.75 – $84.00 | 106 | Sep 18, 2026, Open bid tab, 62V90 ↗ |
| Geotech fabric f/gr stabilized | square yard | $3.00 | $2.00 – $4.00 | 105 | Jul 31, 2026, Open bid tab, 61K19 ↗ |
| Elcbl C Signal 14 3C | linear foot | $2.70 | $2.10 – $3.72 | 104 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Ss Cleaned 12 | linear foot | $3.12 | $2.00 – $5.62 | 104 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Combination cc&g tb6.12 | linear foot | $43.15 | $35.12 – $55.20 | 102 | Jul 31, 2026, Open bid tab, 61K19 ↗ |
| Temporary erosion control seed | pound | $5.00 | $3.00 – $7.50 | 101 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Cc&g rmvl replace < = 10 | linear foot | $73.00 | $59.00 – $88.00 | 99 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Temporary tr signal timing | each | $1,039 | $660.00 – $1,755 | 96 | Jul 31, 2026, Open bid tab, 62X43 ↗ |
| Elcbl C Lead 14 1Pr | linear foot | $2.40 | $1.80 – $3.92 | 96 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Perimeter erosion bar | linear foot | $3.20 | $2.19 – $4.50 | 95 | Jul 31, 2026, Open bid tab, 61K19 ↗ |
| Pavement marking remove water bl | square foot | $1.35 | $0.875 – $3.60 | 91 | Sep 22, 2023, Open bid tab, 61H30 ↗ |
| Tree Root Pruning | each | $125.00 | $90.00 – $200.00 | 91 | Jul 31, 2026, Open bid tab, 61K85 ↗ |
| Pedestrian sh led 1f bm cdt | each | $746.16 | $654.00 – $935.50 | 91 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| P hot mix asphalt bc il-4.75 n50 | ton | $125.00 | $110.12 – $140.00 | 90 | Sep 18, 2026, Open bid tab, 62W73 ↗ |
| Thpl Pvt Mk Line 8 | linear foot | $2.00 | $1.65 – $2.45 | 90 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Fr & lids t1 class | each | $460.00 | $450.00 – $511.75 | 90 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Pedestrian signal post 10 ft | each | $1,572 | $1,388 – $1,800 | 88 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Temporary concrete barrier | linear foot | $32.00 | $27.25 – $39.75 | 86 | Jul 31, 2026, Open bid tab, 62T84 ↗ |
| Fr & Lids Adjust | each | $600.00 | $455.00 – $800.00 | 85 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Reinforced bars, epoxy ctd | pound | $2.58 | $1.80 – $4.00 | 84 | Jul 31, 2026, Open bid tab, 62X43 ↗ |
| Aggregate subgrade impr 12 | square yard | $21.60 | $17.75 – $29.50 | 83 | Jul 31, 2026, Open bid tab, 61K19 ↗ |
| Remove ex handhole | each | $690.00 | $580.00 – $1,208 | 82 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Man Adjust | each | $667.50 | $550.00 – $937.50 | 82 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Modified ureth pm line 12 | linear foot | $5.74 | $3.30 – $14.88 | 82 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Undrgrd C Galvs 4 | linear foot | $87.22 | $70.68 – $109.25 | 80 | Sep 18, 2026, Open bid tab, 62V90 ↗ |
| Fr & Lids T1 Ol | each | $455.00 | $450.00 – $500.00 | 79 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Phosphorus Fert Nutr | pound | $3.40 | $3.00 – $5.00 | 78 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Rebuild Ex Handhole | each | $2,695 | $2,332 – $3,595 | 78 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Pcc driveway pavement 8 | square yard | $108.00 | $94.80 – $128.00 | 77 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Cb Adjust | each | $642.50 | $469.17 – $862.50 | 76 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Hd Handhole | each | $4,886 | $4,000 – $5,933 | 75 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Tree Trunk Protection | each | $150.00 | $100.00 – $200.00 | 75 | Sep 18, 2026, Open bid tab, 62V90 ↗ |
| Pedestrian signal post 5 ft | each | $1,276 | $1,118 – $1,636 | 74 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Modified ureth pm line 6 | linear foot | $2.35 | $1.50 – $5.25 | 73 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Remove ex concrete fdn | each | $655.00 | $499.77 – $802.39 | 72 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Erosion control blanket | square yard | $1.50 | $1.21 – $3.17 | 71 | Jul 31, 2026, Open bid tab, 61K85 ↗ |
| Concrete fdn type a | linear foot | $375.00 | $336.72 – $441.55 | 71 | Sep 18, 2026, Open bid tab, 62W73 ↗ |
| Inductive loop detector | each | $225.00 | $200.00 – $275.00 | 71 | Jul 31, 2026, Open bid tab, 62W91 ↗ |