| Temporary info signing | square foot | $17.00 | $15.00 – $22.00 | 68 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Thpl Pvt Mk Line 4 | linear foot | $0.85 | $0.75 – $1.25 | 62 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Thpl Pvt Mk Line 12 | linear foot | $3.02 | $2.50 – $4.36 | 62 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Earth Excavation | cubic yard | $52.20 | $38.88 – $90.12 | 58 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Thpl Pvt Mk Line 6 | linear foot | $1.25 | $1.00 – $1.88 | 58 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Thpl Pvt Mk Line 24 | linear foot | $5.75 | $5.10 – $7.88 | 58 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Protective Coat | square yard | $1.00 | $0.695 – $2.00 | 56 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Thpl pvt mk ltr & symbol | square foot | $5.75 | $5.00 – $6.62 | 56 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Sidewalk remove | square foot | $2.90 | $2.00 – $4.44 | 55 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Pc concrete sidewalk 5 | square foot | $10.00 | $9.13 – $13.71 | 52 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Detectable Warnings | square foot | $40.00 | $34.92 – $45.00 | 51 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Non Spl Waste Disposl | cubic yard | $100.00 | $83.50 – $116.42 | 51 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Soil Disposal Analy | each | $1,450 | $1,010 – $1,640 | 51 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Hot mix asphalt surface remove butt joint | square yard | $18.00 | $5.50 – $24.02 | 47 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Topsoil F & P 4 | square yard | $6.12 | $5.00 – $12.00 | 46 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Long joint seal | linear foot | $3.15 | $2.96 – $4.12 | 46 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Combination curb gutter remove | linear foot | $11.00 | $8.00 – $14.00 | 45 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Inlet Filters | each | $200.00 | $165.00 – $228.03 | 44 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Sodding Salt Tolerant | square yard | $20.00 | $11.00 – $30.00 | 41 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Nitrogen Fert Nutr | pound | $3.00 | $2.00 – $3.81 | 40 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Potassium Fert Nutr | pound | $3.00 | $2.00 – $3.81 | 40 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Drive pavement remove | square yard | $22.72 | $15.93 – $30.00 | 40 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Hot mix asphalt sc il-9.5 d n50 | ton | $110.00 | $90.50 – $149.76 | 39 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Main ex tr signal instal | each | $2,288 | $1,500 – $6,600 | 37 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Remove & disp uns material | cubic yard | $50.00 | $33.00 – $71.00 | 37 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Pvt marking remove water blast | square foot | $1.80 | $1.25 – $5.20 | 35 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Perimeter erosion bar | linear foot | $3.14 | $2.45 – $4.00 | 35 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Combination cc&g tb6.12 | linear foot | $38.35 | $35.00 – $50.00 | 35 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Pavement remove | square yard | $21.00 | $15.00 – $33.45 | 34 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Sign Panel T1 | square foot | $35.00 | $30.35 – $37.50 | 34 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Fr & Lids Adjust Spl | each | $1,250 | $1,050 – $1,300 | 33 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Temporary pvt mk l4 t4 tape | linear foot | $1.30 | $1.00 – $1.40 | 32 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Aggregate subgrade improve | cubic yard | $50.00 | $32.50 – $69.68 | 31 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Geotech fabric f/gr stabilized | square yard | $2.33 | $2.00 – $3.00 | 30 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Trench Backfill | cubic yard | $61.00 | $45.00 – $78.00 | 29 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Temporary erosion control seed | pound | $4.08 | $3.00 – $6.25 | 28 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Raised reflective pavement mkr | each | $46.99 | $35.75 – $118.00 | 28 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Raised ref pvt mk remove | each | $15.00 | $11.21 – $20.00 | 28 | Apr 24, 2026, Open bid tab, 80B68 ↗ |
| Cc&g rmvl replace > 10ft | linear foot | $65.00 | $50.00 – $80.00 | 27 | Apr 24, 2026, Open bid tab, 80B68 ↗ |
| Temporary Fence | linear foot | $4.00 | $3.05 – $5.00 | 27 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Hot mix asphalt sc il-9.5 d n70 | ton | $98.60 | $90.83 – $117.50 | 27 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Teles steel sin support | linear foot | $20.00 | $17.25 – $25.00 | 27 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Tree Root Pruning | each | $110.00 | $100.00 – $127.50 | 27 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Seeding class 2a | acre | $5,000 | $3,275 – $6,000 | 26 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Accessible pedestrian signal | each | $2,227 | $1,801 – $2,473 | 25 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Temporary tr signal timing | each | $880.00 | $700.00 – $1,050 | 25 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Undrgrd C Galvs 2 | linear foot | $49.82 | $35.00 – $65.51 | 25 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Combination cc&g type b-6.24 | linear foot | $46.31 | $41.78 – $51.23 | 24 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| P hot mix asphalt bc il-4.75 n50 | ton | $110.50 | $103.70 – $126.98 | 24 | Apr 24, 2026, Open bid tab, 80B68 ↗ |
| Elcbl C Egrdc 6 1C | linear foot | $3.40 | $2.51 – $4.53 | 23 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Det Loop T1 | linear foot | $29.91 | $21.30 – $40.09 | 23 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Erosion control blanket | square yard | $1.52 | $1.15 – $2.95 | 22 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Drill Ex Handhole | each | $449.50 | $409.39 – $562.78 | 22 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Drainage Str Cleaned | each | $392.00 | $350.00 – $500.00 | 22 | Apr 24, 2026, Open bid tab, 80B68 ↗ |
| Elcbl C Signal 14 2C | linear foot | $2.74 | $1.90 – $3.67 | 22 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Cc&g rmvl replace < = 10 | linear foot | $80.00 | $60.00 – $100.00 | 21 | Apr 24, 2026, Open bid tab, 80B68 ↗ |
| Fr & Lids T1 Ol | each | $525.00 | $465.00 – $600.00 | 21 | Apr 24, 2026, Open bid tab, 80B68 ↗ |
| Temporary concrete barrier | linear foot | $26.00 | $24.00 – $35.00 | 21 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Remove elcbl fr con | linear foot | $1.00 | $0.7 – $2.42 | 21 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Aggregate base course b 4 | square yard | $10.25 | $7.50 – $12.10 | 21 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Thpl Pvt Mk Line 8 | linear foot | $1.95 | $1.50 – $3.40 | 21 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Phosphorus Fert Nutr | pound | $3.00 | $1.00 – $3.47 | 20 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Remove inlet | each | $392.50 | $259.75 – $500.00 | 20 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Median remove | square foot | $5.50 | $3.50 – $9.25 | 20 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Elcbl C Signal 14 5C | linear foot | $1.95 | $1.68 – $2.52 | 20 | Jan 16, 2026, Open bid tab, 61J01 ↗ |
| Temporary access- com ent | each | $350.00 | $247.50 – $507.50 | 20 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Fr & lids t1 class | each | $537.50 | $468.75 – $612.50 | 20 | Apr 24, 2026, Open bid tab, 80B68 ↗ |
| Rebuild Ex Handhole | each | $2,800 | $2,445 – $3,940 | 20 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Pcc driveway pavement 8 | square yard | $104.76 | $84.13 – $127.06 | 20 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Reinforced bars, epoxy ctd | pound | $2.50 | $1.98 – $4.00 | 19 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Storm sew class a 1 12 | linear foot | $125.00 | $82.50 – $162.50 | 19 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Elcbl C Signal 14 3C | linear foot | $2.78 | $1.83 – $3.39 | 19 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Fr & Lids Adjust | each | $650.00 | $525.00 – $915.00 | 19 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Det loop replace | linear foot | $28.75 | $18.01 – $34.58 | 19 | Apr 24, 2026, Open bid tab, 61L84 ↗ |
| Temporary pvt mk l6 t4 tape | linear foot | $1.90 | $1.65 – $2.00 | 19 | Sep 18, 2026, Open bid tab, 80B49 ↗ |
| Aggregate subgrade impr 12 | square yard | $19.69 | $16.15 – $39.50 | 18 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Temporary ditch checks | linear foot | $11.00 | $8.44 – $14.75 | 18 | Jun 12, 2026, Open bid tab, 62X52 ↗ |
| Undrgrd C Galvs 4 | linear foot | $89.15 | $68.67 – $109.33 | 18 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Elcbl C Lead 14 1Pr | linear foot | $2.81 | $1.85 – $5.41 | 18 | Jul 31, 2026, Open bid tab, 61M40 ↗ |
| Bit Matls Pr Ct | pound | $0.01 | $0.01 – $0.01 | 18 | Apr 24, 2026, Open bid tab, 80B07 ↗ |