Street Lighting · awarded bid prices · Dallas County
Conduit (Prepare): cost per linear foot in Dallas County, TX
The median awarded price is $4.27 per linear foot, from 20 winning bids on 20 public projects in Dallas County, TX (2024–2026). Half of the awarded prices fall between $1.90 and $7.07.
Cost by state › Texas › Dallas County › Conduit (Prepare)
$4.27median per linear foot
$1.90 – $7.07middle half (25th–75th percentile)
20winning bids, 20 source documents
2024–2026lettings covered (last 3 years)
Winning bids only, as printed in the agencies' bid tabulations (TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $3.92 in 2025 to $2.81 in 2026 (-28%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2025 | $3.92 | 8 |
| 2026 | $2.81 | 10 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Oct 7, 2026 | TxDOT | 14135 LF | $4.04 | line 26 ↗ |
| Sep 3, 2026 | TxDOT | 300 LF | $1.50 | line 66 ↗ |
| Jul 2, 2026 | TxDOT | 36989 LF | $0.65 | line 25 ↗ |
| Jul 2, 2026 | TxDOT | 500 LF | $1.00 | line 26 ↗ |
| Jun 3, 2026 | TxDOT | 35 LF | $11.00 | line 19 ↗ |
See every awarded price for this item on the Conduit (Prepare) item page.
Related items in Dallas County
- Elec Condr (NO.6) Bare: $2.88 per linear foot
- Elec Condr (NO.6) Insulated: $3.00 per linear foot
- Elec Condr (NO.8) Insulated: $2.88 per linear foot
- Condt (PVC) (Sch 80) (2"): $24.00 per linear foot
- PED Pole Assembly: $3,401 per each
- Ground Box TY D (162922)W/Apron: $2,418 per each
- Ground Box TY A (122311)W/Apron: $1,845 per each
- Ground Box (Prepare): $400.00 per each