Paving · awarded bid prices · Dallas County
Pavement surface preparation for marking (arrow): cost per each in Dallas County, TX
Listed by the agency as “PAV Surf Prep for MRK (Arrow)”.
The median awarded price is $24.00 per each, from 21 winning bids on 21 public projects in Dallas County, TX (2024–2026). Half of the awarded prices fall between $15.00 and $56.00.
Cost by state › Texas › Dallas County › PAV Surf Prep for MRK (Arrow)
Winning bids only, as printed in the agencies' bid tabulations (TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $40.00 in 2025 to $13.75 in 2026 (-66%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2025 | $40.00 | 11 |
| 2026 | $13.75 | 6 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 3, 2026 | TxDOT | 35 EA | $12.50 | line 183 ↗ |
| Aug 5, 2026 | TxDOT | 18 EA | $15.00 | line 82 ↗ |
| Jun 2, 2026 | TxDOT | 36 EA | $12.24 | line 88 ↗ |
| Apr 7, 2026 | TxDOT | 33 EA | $7.50 | line 105 ↗ |
| Mar 5, 2026 | TxDOT | 28 EA | $24.00 | line 75 ↗ |
See every awarded price for this item on the PAV Surf Prep for MRK (Arrow) item page.
Related items in Dallas County
- PAV Surf Prep for MRK (6"): $0.26 per linear foot
- Pavement Sler 6": $0.3 per linear foot
- Pavement Sler 24": $1.98 per linear foot
- Tack Coat: $4.10 per gallon
- Pavement Sler 8": $0.35 per linear foot
- Pavement Sler (Arrow): $48.00 per each
- Conc Curb (TY II): $45.00 per linear foot
- Curb Ramps (TY 2): $3,400 per each