Skip to content
Hubstake

Cost by county

Construction unit costs in Montgomery County, TX

Median awarded unit prices for 23 items on public projects in Montgomery County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Texas › Montgomery County

ItemPerMedianMiddle halfWinning bidsLatest source document
Temporary sediment control fence (install)linear foot$3.27$2.96 – $4.7526Jul 2, 2026, line 25 ↗
Temporary sediment control fence (remove)linear foot$1.00$0.91 – $1.3026Jul 2, 2026, line 26 ↗
In small road sign support&assembly type10bwg(1)sa(t)each$670.00$600.00 – $753.0425Sep 16, 2026, line 13 ↗
Preparing right of waystation$4,184$2,875 – $7,30323May 6, 2026, line 1 ↗
Cement stabilized backfillcubic yard$53.50$47.95 – $64.4523Jul 2, 2026, line 8 ↗
Reflective pavement marking type i (w)24 inch(solid)(100mil)linear foot$7.04$6.04 – $8.0022Apr 14, 2026, line 10 ↗
Pavement surface preparation for marking (24 inch)linear foot$0.32$0.14 – $0.57822Apr 14, 2026, line 77 ↗
Guardrail End Treatment (Install)each$3,415$3,160 – $3,55021May 6, 2026, line 36 ↗
Metal w-beam guard fence (timber post)linear foot$27.00$25.00 – $30.9020May 6, 2026, line 28 ↗
Portable Changeable Message Signday$100.00$79.95 – $200.0020May 12, 2026, line 12 ↗
Reflective pavement marker type ii-a-aeach$6.00$5.00 – $6.2318May 6, 2026, line 63 ↗
Reflective pavement marker type i-ceach$6.00$5.00 – $7.0016May 6, 2026, line 62 ↗
Pavement surface preparation for marking (6 inch)linear foot$0.05$0.03 – $0.08515May 6, 2026, line 65 ↗
Remove small road sign support&assemblyeach$95.00$80.00 – $124.3415May 6, 2026, line 47 ↗
Block Soddingsquare yard$4.30$3.96 – $6.7815Jul 2, 2026, line 3 ↗
In small road sign support&assembly type10bwg(1)sa(p)each$550.00$500.00 – $653.7514Sep 16, 2026, line 12 ↗
Pavement surface preparation for marking (arrow)each$10.00$9.12 – $14.5714May 6, 2026, line 29 ↗
TMA (Mobile Operation)hour$55.00$32.21 – $100.0014Jul 2, 2026, line 21 ↗
Riprap (Mow Strip)(4 in)cubic yard$685.89$563.03 – $850.0014May 6, 2026, line 18 ↗
Reflective pavement marking type i (w)8 inch(solid)(100mil)linear foot$1.25$1.00 – $1.5013May 6, 2026, line 51 ↗
Pavement surface preparation for marking (word)each$10.00$9.50 – $13.2513May 6, 2026, line 32 ↗
Pavement surface preparation for marking (8 inch)linear foot$0.08$0.057 – $0.08512May 6, 2026, line 27 ↗
Fertilizeracre$975.00$785.00 – $1,97112May 7, 2026, line 8 ↗

Other counties in Texas