Paving · awarded bid prices · Harris County
Pavement surface preparation for marking (12 inch): cost per linear foot in Harris County, TX
Listed by the agency as “PAV Surf Prep for MRK (12")”.
The median awarded price is $0.2 per linear foot, from 33 winning bids on 33 public projects in Harris County, TX (2024–2026). Half of the awarded prices fall between $0.1 and $0.26.
Cost by state › Texas › Harris County › PAV Surf Prep for MRK (12")
Winning bids only, as printed in the agencies' bid tabulations (City of Baytown, TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $0.2 in 2024 to $0.25 in 2026 (+25%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2024 | $0.2 | 11 |
| 2025 | $0.15 | 13 |
| 2026 | $0.25 | 9 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Sep 2, 2026 | TxDOT | 395 LF | $0.26 | line 24 ↗ |
| Sep 2, 2026 | TxDOT | 65014 LF | $0.15 | line 36 ↗ |
| Jun 3, 2026 | TxDOT | 1247 LF | $0.4 | line 53 ↗ |
| May 7, 2026 | TxDOT | 17875 LF | $0.35 | line 61 ↗ |
| Apr 14, 2026 | TxDOT | 9000 LF | $0.05 | line 30 ↗ |
See every awarded price for this item on the PAV Surf Prep for MRK (12") item page.
Related items in Harris County
- PAV Surf Prep for MRK (Arrow): $10.00 per each
- PAV Surf Prep for MRK (Word): $11.50 per each
- PAV Surf Prep for MRK (8"): $0.08 per linear foot
- PAV Surf Prep for MRK (24"): $0.46 per linear foot
- PAV Surf Prep for MRK (DBL Arrow): $15.15 per each
- PAV Surf Prep for MRK (Uturn Arr): $15.00 per each
- Conc Str Repair (Vertical & Overhead): $200.00 per square foot