ItemPerMedianMiddle halfWinning bidsLatest source document
Common Embankment (Cv)cubic yard$23.65$15.00 – $35.6029Jun 10, 2026, Open the source page, contract 260085
Storm Drain Inlet Protectioneach$188.00$173.69 – $200.0026Jun 10, 2026, Open the source page, contract 260085
Sediment Control Log Type Compostlinear foot$3.67$3.14 – $5.8826Jun 10, 2026, Open the source page, contract 260085
Excavation Commoncubic yard$29.00$21.50 – $52.5025Jun 10, 2026, Open the source page, contract 260085
Drill and grout reinforced bar (epoxy coated)each$13.55$10.95 – $20.0024Jun 10, 2026, Open the source page, contract 260089
Remove Curb and Gutterlinear foot$8.00$5.58 – $11.3023Jun 10, 2026, Open the source page, contract 260085
Remove Guardrail-plate Beamlinear foot$9.00$6.75 – $10.7023Jun 10, 2026, Open the source page, contract 260085
Signsquare foot$90.34$78.50 – $108.7522Jun 10, 2026, Open the source page, contract 260089
Remove Signeach$100.00$38.35 – $118.7522Jun 10, 2026, Open the source page, contract 260089
Sawing asphalt pavement (full deep)linear foot$2.12$2.00 – $3.8022Jun 10, 2026, Open the source page, contract 260085
Traffic Barrier Design Type 31linear foot$36.85$33.00 – $46.3122Jun 10, 2026, Open the source page, contract 260085
Casting Assemblyeach$1,175$1,000 – $1,35021Jun 10, 2026, Open the source page, contract 260085
Remove Energy Absorbing Terminaleach$600.00$540.00 – $695.0021Jun 10, 2026, Open the source page, contract 260085
End Treatment-tangent Terminaleach$4,000$3,900 – $4,31021Jun 10, 2026, Open the source page, contract 260085
Portable Precast Concrete Barrier Design 8337linear foot$15.60$14.50 – $17.0021Jun 10, 2026, Open the source page, contract 260085
Remove asphalt pavementsquare yard$10.65$8.38 – $18.1920Jun 10, 2026, Open the source page, contract 260085
6 inch concrete walksquare foot$9.13$8.24 – $13.5720Jun 10, 2026, Open the source page, contract 260089
Fertilizer Type 3pound$2.00$1.22 – $3.0020Jun 10, 2026, Open the source page, contract 260085
Remove Anchorage Assembly-plate Beameach$325.00$230.25 – $703.7520Jun 10, 2026, Open the source page, contract 260085
Remove Delineator / Markereach$40.50$31.50 – $50.7620Jun 10, 2026, Open the source page, contract 260104
Reinforced bars (epoxy coated)pound$1.80$1.65 – $2.1120Jun 10, 2026, Open the source page, contract 260089
Portable Barrier Delineatoreach$9.25$8.68 – $10.4320Jun 10, 2026, Open the source page, contract 260085
Select Granular Embankment (Cv)cubic yard$42.00$35.00 – $54.7519Jun 10, 2026, Open the source page, contract 260085
Fiber Optic Pigtail Terminationeach$1,800$1,550 – $2,01419Jun 10, 2026, Open the source page, contract 260085
Remove Sewer Pipe (Storm)linear foot$28.50$22.05 – $41.0019Jun 10, 2026, Open the source page, contract 260085
Delineator / Markereach$300.00$267.57 – $355.0019Jun 10, 2026, Open the source page, contract 260089
Delineator / Marker Paneleach$100.00$97.72 – $115.0019Jun 10, 2026, Open the source page, contract 260089
6 inch solid line multi-component ground in (wr)linear foot$2.25$1.38 – $3.2519Jun 10, 2026, Open the source page, contract 260085
1.5 inch non-metallic conduitlinear foot$5.90$5.00 – $8.6219Jun 10, 2026, Open the source page, contract 260085
Pull Vaulteach$2,930$2,800 – $3,23019Jun 10, 2026, Open the source page, contract 260089
Buried Cable Signeach$111.43$75.00 – $188.7518Jun 10, 2026, Open the source page, contract 260085
Armored fiber optic pigtail cable 6smalllinear foot$2.42$1.86 – $2.9718Jun 10, 2026, Open the source page, contract 260085
2 inch, non-metallic, conduitlinear foot$8.88$6.57 – $11.6518Jun 10, 2026, Open the source page, contract 260089
Connect to Existing Storm Sewereach$1,307$1,202 – $1,50018Jun 10, 2026, Open the source page, contract 260089
Anchorage Assembly - Type 31each$3,740$3,329 – $3,91218Jun 10, 2026, Open the source page, contract 260085
1.5 inch bored conduitlinear foot$20.00$18.30 – $25.0017Jun 10, 2026, Open the source page, contract 260089
Mulching material type 9cubic yard$200.00$140.00 – $277.0017Jun 10, 2026, Open the source page, contract 260085
Remove Chain Link Fencelinear foot$11.00$8.00 – $25.0017Jun 10, 2026, Open the source page, contract 260089
Sawing concrete pavement (full deep)linear foot$5.50$4.77 – $8.0017Jun 10, 2026, Open the source page, contract 260089
Truncated Domessquare foot$62.00$56.70 – $68.0417Jun 10, 2026, Open the source page, contract 260089
Aggregate Base (Cv) Class 5cubic yard$65.75$54.00 – $104.0017Jun 10, 2026, Open the source page, contract 260085
Adjust Frame and Ring Castingeach$1,000$650.00 – $1,28717Jun 10, 2026, Open the source page, contract 260089
Joint Adhesivelinear foot$0.925$0.395 – $1.0216Jun 10, 2026, Open the source page, contract 260085
Remove Concrete Walksquare foot$2.83$1.50 – $6.8816Jun 10, 2026, Open the source page, contract 260085
Remove Drainage Structureeach$837.50$663.75 – $967.5016Jun 10, 2026, Open the source page, contract 260085
Pavement marking removelinear foot$0.825$0.7 – $1.0016Jun 10, 2026, Open the source page, contract 260085
Concrete Curb Ramp Walksquare foot$16.10$15.38 – $19.0516Jun 10, 2026, Open the source page, contract 260089
Concrete Curb and Gutter Design B624linear foot$44.10$37.42 – $49.5016Jun 10, 2026, Open the source page, contract 260089
Supplemental Descriptionlinear foot$80.00$41.00 – $135.0015May 7, 2025, Open the source page, contract 250045
4 inch concrete walksquare foot$11.50$9.01 – $13.1415Jun 10, 2026, Open the source page, contract 260085
Salvage Signeach$80.00$38.35 – $105.8814Jun 10, 2026, Open the source page, contract 260085
Remove Handholeeach$322.50$300.00 – $488.7514Jun 10, 2026, Open the source page, contract 260085
Grubbingeach$265.00$196.25 – $495.0014Jun 10, 2026, Open the source page, contract 260085
Install Signeach$607.23$477.50 – $706.2514Jun 10, 2026, Open the source page, contract 260085
Remove Castingeach$250.00$231.25 – $357.5014Jun 10, 2026, Open the source page, contract 260085
Connect into Existing Drainage Structureeach$1,451$1,200 – $1,97514Jun 10, 2026, Open the source page, contract 260085
Relocate Portable Precast Concrete Barrier Design 8337linear foot$4.50$3.75 – $6.5614Jun 10, 2026, Open the source page, contract 260085
Grubbingacre$11,500$7,100 – $20,00013Jun 10, 2026, Open the source page, contract 260089
Culvert End Controlseach$175.00$144.00 – $200.0013Jun 10, 2026, Open the source page, contract 260085
Sign Panel Overlaysquare foot$22.00$16.00 – $26.5013Jun 10, 2026, Open the source page, contract 260089
Extruded Panelsquare foot$34.00$32.65 – $34.9013Jun 10, 2026, Open the source page, contract 260089
Rolled Erosion Prevention Category 20square yard$2.10$1.75 – $2.7512Jun 10, 2026, Open the source page, contract 260085
Electrical Groundeach$348.71$287.50 – $534.3812Jun 10, 2026, Open the source page, contract 260089

Other counties in Minnesota