| 3.0 Cu Yd Shovel | hour | $60.00 | $60.00 – $150.00 | 30 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Flotation Silt Curtain Type Moving Water | linear foot | $12.50 | $12.50 – $18.50 | 30 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Random Riprap Class Iii | ton | $50.00 | $50.00 – $55.00 | 30 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Dozer | hour | $60.00 | $60.00 – $100.00 | 30 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Rapid Stabilization Method 4 | square yard | $1.37 | $1.35 – $1.80 | 29 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Sediment Control Log Type Straw | linear foot | $3.10 | $3.10 – $3.10 | 29 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Remove Sign | each | $20.00 | $20.00 – $40.00 | 28 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Aggregate Surfacing Class 5 | ton | $18.00 | $16.00 – $20.00 | 28 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Remove pipe culvert | linear foot | $7.00 | $7.00 – $10.00 | 25 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Structure Excavation Class U (P) | cubic yard | $1.00 | $1.00 – $2.00 | 24 | Feb 5, 2026, Open bid tab, 26-2 ↗ |
| Culvert End Controls | each | $60.00 | $60.00 – $65.00 | 22 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Rolled Erosion Prevention Category 20 | square yard | $1.71 | $1.57 – $1.74 | 22 | May 12, 2026, Open bid tab, 26-3 ↗ |
| 4 inch broken line paint | linear foot | $0.086 | $0.086 – $0.13 | 18 | May 12, 2026, Open bid tab, 26-3 ↗ |