Removing Slotted Drain
One winning bid
Single 1 winning bid$2,500per contract
- Letting
- Mar 23, 2005
- Quantity
- 1 LS
- Agency
- WSDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- WSDOT · Grays Harbor, Washington
- Letting
- Mar 23, 2005
- Quantity
- 1 LS
- Contractor
- Lakeside Industries
- Winning price
- $2,500 / LS
What’s behind $2,500
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other drainage items priced per LS, ranked by how much evidence each has.
- Pipe, Bridge Deck Drain System$17,97550 bids
- Storm Drain Inlet Protection$3,40046 bids
- Removing Portion of Conc. Box Culv.$15,0007 bids
- Pipe, Bridge Deck Drain System, Bridge No 01$23,4374 bids
- Removing Drainage Structure$6,4354 bids
- Tunnel Sump and Drain Cleaning$48,0004 bids
- Modify Bridge Deck Drain System$8,0003 bids
- Pipe, Bridge Deck Drain System, Bridge No. 1$10,0423 bids
1 observation
1 agency in 1 state · lettings Mar 23, 2005
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.