Tunnel Sump and Drain Cleaning
Median lump-sum amount
Thin 4 winning bids≈$48,000per contractLow confidence
- Winning bids
- 4
- Source documents
- 4
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 4 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Sep 30, 2011
- Quantity
- 1 LS
- Contractor
- Highway Maintenance, Inc.
- Winning price
- $48,000 / LS
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $48,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 4 bids charted, so you can see clusters and outliers.
4 observations
Agency, county, letting date, quantity and the price as printed.
4 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other drainage items priced per LS, ranked by how much evidence each has.
- Cleaning Existing Drainage Structure$3,138226 bids
- Pipe, Bridge Deck Drain System$17,97550 bids
- Storm Drain Inlet Protection$3,40046 bids
- Pipe, Bridge Deck Drain System, Bridge No 01$23,4374 bids
- Cleaning and Painting - Wingwalls$121,3863 bids
- Modify Bridge Deck Drain System$8,0003 bids
- Pipe, Bridge Deck Drain System, Bridge No. 1$10,0423 bids
- Pipe, Bridge Deck Drain System, Bridge No. 5$30,0003 bids
4 observations
1 agency in 1 state · lettings Jun 25, 2004 – Sep 30, 2011
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.