Removing Asphalt Conc. From Bridge 9/125 Deck
One winning unit price
Single 1 winning bid$5.80/ SY
- Letting
- May 21, 2003
- Quantity
- 272 SY
- Agency
- WSDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- WSDOT · Snohomish, Washington
- Letting
- May 21, 2003
- Quantity
- 272 SY
- Contractor
- Lakeside Industries
- Winning price
- $5.80 / SY
What’s behind $5.80
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per SY, ranked by how much evidence each has.
- Removing Asphalt Conc. From Bridge Deck$5.005 bids
- Removing Existing Overlay from Bridge Deck$13.5444 bids
- Remove Asphalt from Deck$46.5010 bids
- Removing Bridge Deck (Partial Only)$4509 bids
- Bridge Deck Grooving$7.001,341 bids
- Conc Pavt, Bridge Approach, Reinf$150371 bids
- Bridge Deck, Remove Existing Concrete Surface$12.00250 bids
- Bridge Deck Repairs (Partial Depth of Slab)$425245 bids
1 observation
1 agency in 1 state · lettings May 21, 2003
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.