Removing Bridge Deck (Partial Only)
Median winning unit price
Moderate 9 winning bids≈$450/ SYLow confidence
- Winning bids
- 9
- Source documents
- 4
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 9 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jul 26, 2024
- Quantity
- 18 SQYD
- Contractor
- Cekra, INC
- Winning price
- $1,000 / SY
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $450
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 9 bids charted, so you can see clusters and outliers.
9 observations
Agency, county, letting date, quantity and the price as printed.
4 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per SY, ranked by how much evidence each has.
- Bridge Deck Repairs (Partial Depth of Slab)$425245 bids
- Removing Existing Overlay from Bridge Deck$13.5444 bids
- Concrete Overlayed Bridge Deck Repair (Partial Depth)$54841 bids
- Bridge Deck Repairs (Partial Depth Slab)$20019 bids
- Removing Bridge End Slab (Partial)$85.6710 bids
- Removing Asphalt Conc. From Bridge Deck$5.005 bids
- Bridge Deck Grooving$7.001,341 bids
- Bridge Deck, Remove Existing Concrete Surface$12.00250 bids
9 observations
1 agency in 1 state · lettings Jan 28, 2000 – Jul 26, 2024
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.