Earthwork · awarded bid prices · Collin County
Cement stabilized backfill: cost per cubic yard in Collin County, TX
Listed by the agency as “CEM Stabil Bkfl”.
The median awarded price is $245.00 per cubic yard, from 18 winning bids on 18 public projects in Collin County, TX (2024–2026). Half of the awarded prices fall between $203.75 and $265.00.
Cost by state › Texas › Collin County › CEM Stabil Bkfl
Winning bids only, as printed in the agencies' bid tabulations (TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $237.50 in 2023 to $225.00 in 2026 (-5%).
| Year | Median per cubic yard | Winning bids |
|---|---|---|
| 2023 | $237.50 | 6 |
| 2024 | $225.00 | 6 |
| 2025 | $250.00 | 5 |
| 2026 | $225.00 | 7 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Oct 6, 2026 | TxDOT | 170 CY | $250.00 | line 26 ↗ |
| Sep 9, 2026 | TxDOT | 29 CY | $200.00 | line 3 ↗ |
| Aug 6, 2026 | TxDOT | 789 CY | $222.00 | line 38 ↗ |
| Jul 2, 2026 | TxDOT | 186 CY | $225.00 | line 31 ↗ |
| Jul 1, 2026 | TxDOT | 466 CY | $240.00 | line 18 ↗ |
The same item across Texas: statewide figures. See every awarded price for this item on the CEM Stabil Bkfl item page.
Related items in Collin County
- Excavation (Roadway): $17.20 per cubic yard
- Compost Manuf Topsoil (4"): $2.00 per square yard
- Excav (Roadway): $19.50 per cubic yard
- Trench Excavation Protection: $8.68 per linear foot
- Flowable Backfill: $272.50 per cubic yard
- Backfill (TY A or B): $300.00 per station
- Blading: $300.00 per station