Skip to content
Hubstake

Cost by state

Construction unit costs in Missouri

Median awarded unit prices for the 50 most-bid items on Missouri public projects, from winning bids in agency bid tabulations.

Cost by state › Missouri

ItemPerMedianMiddle halfWinning bids
Construction Signssquare foot$7.00$6.27 – $8.29638
Channelizer (Trim Line)each$18.00$10.00 – $22.00536
Silt Fencelinear foot$3.49$3.00 – $4.40456
Tack Coatgallon$3.00$2.69 – $3.52436
4 In. Yellow Standard Waterborne Pavement Marking Paint, Type P Beadslinear foot$0.17$0.13 – $0.605431
Type A Crashworthy End Terminal (Mash)each$3,513$3,200 – $3,850390
Preformed Thermoplastic Pavement Marking, 24 in. Whitelinear foot$24.00$20.00 – $28.00389
4 In. White Standard Waterborne Pavement Marking Paint, Type P Beadslinear foot$0.2$0.14 – $0.603388
Coldmilling Bituminous Pavement for Removal of Surfacing (3 in. Thick or Less)square yard$3.75$2.23 – $8.50372
Seeding - Cool Season Grassesacre$3,450$2,350 – $5,200337
Modified Coldmilling (Depth Transitions)square yard$10.50$6.50 – $18.00332
Gravel (A) or Crushed Stone (B)ton$50.40$38.62 – $85.38330
Changeable Message Sign Without Communication Interface, CON Tractor Furnished, Contractor Retainedeach$2,940$2,000 – $3,500325
MGS Guardraillinear foot$28.50$26.00 – $32.91323
Mulchingacre$2,180$1,513 – $3,782304
Misc.Permanent Aggregate Edge Treatmentton$44.50$34.00 – $54.59284
Pavement Marking Removallinear foot$1.03$0.655 – $2.00282
Rock Ditch Checklinear foot$17.12$13.20 – $31.88280
Flashing Arrow Paneleach$1,000$534.17 – $1,565278
MGS Bridge Approach Transition Section (Regular/No Curb)each$4,000$3,600 – $4,200277
Permanent Erosion Control Geotextilesquare yard$4.00$3.00 – $5.50267
Preformed Thermoplastic Pavement Marking, Left/Right Arroweach$300.00$270.00 – $340.00265
Bituminous Pavement Mixture PG64-22 (Surface Leveling)ton$86.29$79.09 – $93.78263
Sh-flat Sheetsquare foot$28.00$22.75 – $36.00261
Shf-flat Sheet Fluorescentsquare foot$33.11$26.81 – $40.45240
Compacting Embankmentcubic yard$8.10$5.00 – $14.49237
Advanced Warning Rail Systemeach$51.00$45.00 – $79.69230
Class 3 Excavationcubic yard$27.82$15.00 – $55.00220
Vertical Drain at End Bentseach$3,000$2,000 – $4,650217
Placing Type 2 Rock Blanketcubic yard$26.75$20.00 – $37.00207
Class A Excavationcubic yard$20.70$14.00 – $35.00204
Furnishing Type 2 Rock Blanketcubic yard$56.00$44.98 – $67.03204
6 In. White High Build Waterborne Pavement Marking Paint, Type L Beadslinear foot$0.31$0.26 – $0.7202
Type III Moveable Barricadeeach$155.00$125.00 – $185.00201
Bituminous Shoulder Rumble Stripstation$20.00$12.00 – $35.24200
2 In. Psst Post - 12 GA.linear foot$25.00$17.00 – $30.06196
Clearing AND Grubbingacre$7,228$4,026 – $12,471190
Type 5 Aggregate for Base (4 in. Thick)square yard$13.73$10.03 – $18.02184
Temporary Seedingacre$1,910$1,000 – $3,220177
Class 1 Excavationcubic yard$50.00$30.00 – $81.73169
Truncated Domessquare foot$32.00$26.06 – $40.00150
6 In. Yellow High Build Waterborne Pavement Marking Paint, Type L Beadslinear foot$0.3$0.26 – $0.562144
Embankment in Placecubic yard$26.75$17.19 – $41.88138
Truck or Trailer Mounted Attenuator (Tma)each$1,500$750.00 – $3,000113
Unclassified Excavationcubic yard$20.00$12.00 – $30.5180
Reinforcing Steel (Epoxy Coated)pound$3.00$2.00 – $5.0072
Curb and Gutter Type Alinear foot$55.00$45.50 – $75.5632
Flowable Backfillcubic yard$437.50$276.06 – $823.5028
Guardrail Type Alinear foot$29.45$25.75 – $32.8520
Reinforcing Steelpound$5.00$3.00 – $6.0017

Prices by county in Missouri

Agencies in Missouri