Skip to content
Hubstake

Agency · awarded bid prices

MoDOT: awarded unit prices

310,729 winning bid prices read from 5,663 source documents, 2005–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › MoDOT

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Mobilizationls6,928—$29,665$1.00 – $8,429,113Jun 18, 2026, Open the source page, contract 260618-A01
Construction signsquare foot6,222$6.50$8.38$0.01 – $116.06Jun 18, 2026, Open the source page, contract 260618-C01
Remove of improvementsls4,521—$31,691$0.01 – $3,807,136Jun 18, 2026, Open the source page, contract 260618-C02
Channelizer (Trim Line)each4,440$16.50$5.58$0.01 – $620.00Jun 18, 2026, Open the source page, contract 260618-C01
Tack Coatgallon3,639$2.28$2.70$0.01 – $210.00Jun 18, 2026, Open the source page, contract 260618-A01
Contractor furnish surveying and stakingls3,242—$14,360$0.01 – $1,086,000Jun 18, 2026, Open the source page, contract 260618-C02
Flag Assemblyeach3,220$20.45$20.00$0.01 – $247.07Jan 20, 2023, Open the source page, contract 230120-C04
Sediment removecubic yard3,000$22.00$18.78$0.01 – $1,320Jun 18, 2026, Open the source page, contract 260618-C02
Silt Fencelinear foot2,990$2.85$3.35$0.01 – $346.50Jun 18, 2026, Open the source page, contract 260618-C02
Flashing Arrow Paneleach2,831$840.00$3,530$0.01 – $13,850Jun 18, 2026, Open the source page, contract 260618-C02
Modified coldmilling (deep transitions)square yard2,825$7.00$6.15$0.01 – $405.41Jun 18, 2026, Open the source page, contract 260618-A04
Truck or Trailer Mounted Attenuator (Tma)each2,625$800.00$7,171$0.01 – $31,500Mar 15, 2024, Open the source page, contract 240315-B01
Advanced Warning Rail Systemeach2,565$55.00$56.64$0.01 – $593.13Jun 20, 2025, Open the source page, contract 250620-C01
Coldmilling asphalt pavement for remove of surfacing (3 in. thick or less)square yard2,339$2.75$0.65$0.05 – $134.22Jun 18, 2026, Open the source page, contract 260618-A01
Type III Moveable Barricadeeach1,923$150.00$175.00$0.01 – $1,400Apr 18, 2025, Open the source page, contract 250418-C02
Seeding - Cool Season Mixturesacre1,915$2,850$2,840$1.00 – $53,000Feb 18, 2022, Open the source page, contract 220218-C01
4 In. Yellow Standard Waterborne Pavement Marking Paint, Type P Beadslinear foot1,909—$0.16$0.01 – $54.00Jun 20, 2025, Open the source page, contract 250620-A02
Asphalt pavement mixture pg64-22, (bp-1)ton1,747$68.25$160.00$1.00 – $2,226Jun 18, 2026, Open the source page, contract 260618-D05
Type A Crashworthy End Terminal (Mash)each1,708$2,986$4,188$10.00 – $11,100Jun 18, 2026, Open the source page, contract 260618-C02
4 In. White Standard Waterborne Pavement Marking Paint, Type P Beadslinear foot1,691—$0.16$0.05 – $25.00Jun 20, 2025, Open the source page, contract 250620-A02
Compacting Embankmentcubic yard1,574$4.22$11.54$0.01 – $357.10Jun 18, 2026, Open the source page, contract 260618-C02
Asphalt shoulder rumble stripstation1,548$16.25$21.00$1.20 – $16,750Jun 18, 2026, Open the source page, contract 260618-A01
Class A Excavationcubic yard1,530$12.00$14.61$0.96 – $500.00Jun 18, 2026, Open the source page, contract 260618-C02
Rock Ditch Checklinear foot1,420$16.00$30.00$0.01 – $300.00Jun 18, 2026, Open the source page, contract 260618-D05
Gravel (A) or Crushed Stone (B)ton1,392$44.00$28.00$1.00 – $3,197Jun 18, 2026, Open the source page, contract 260618-H03
Asphalt pavement mixture pg64-22 (surface leveling)ton1,366$63.45$89.00$31.94 – $1,500May 15, 2026, Open the source page, contract 260515-H04
Class 3 Excavationcubic yard1,354$20.00$49.97$0.01 – $2,320Jun 18, 2026, Open the source page, contract 260618-C02
Changeable message sign, contractor furnish, contractor retainedeach1,325$3,000$4,000$1.00 – $20,900May 20, 2016, Open the source page, contract 160520-F10
Changeable message sign without communication interface, con tractor furnish, contractor retainedeach1,321$3,000$2,800$1.00 – $20,700May 16, 2025, Open the source page, contract 250516-F10
Pavement marking removelinear foot1,315$0.89$0.59$0.01 – $54.00Jun 18, 2026, Open the source page, contract 260618-C02
Permanent Erosion Control Geotextilesquare yard1,292$3.00$2.99$0.01 – $222.05Jun 18, 2026, Open the source page, contract 260618-C02
MGS Guardraillinear foot1,287$26.00$37.69$14.25 – $175.00Jun 18, 2026, Open the source page, contract 260618-C02
Type 1 Aggregate for Base (4 in. Thick)square yard1,268$8.50$9.20$0.1 – $157.81May 15, 2026, Open the source page, contract 260515-C05
Vertical Drain at End Bentseach1,247$1,850$7,799$200.00 – $100,326Jun 18, 2026, Open the source page, contract 260618-F01
Slab Draineach1,227$325.00$930.00$2.45 – $1,600Jun 18, 2026, Open the source page, contract 260618-F01
6 In. White High Build Waterborne Pavement Marking Paint, Type L Beadslinear foot1,225$0.27$0.39$0.01 – $32.00Jun 20, 2025, Open the source page, contract 250620-A01
Placing Type 2 Rock Blanketcubic yard1,207$20.00$20.00$2.35 – $779.26Jun 18, 2026, Open the source page, contract 260618-H01
Furnishing Type 2 Rock Blanketcubic yard1,173$36.50$40.00$0.01 – $300.00Jun 18, 2026, Open the source page, contract 260618-H01
Type A Crashworthy End Terminaleach1,168$2,100$3,487$861.48 – $4,970Apr 17, 2026, Open the source page, contract 260417-C01
Preformed Thermoplastic Pavement Marking, 24 in. Whitelinear foot1,167$22.00$27.50$0.25 – $103.00Jun 18, 2026, Open the source page, contract 260618-A02

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Missouri: statewide figures.