Construction unit costs in Kentucky

Median awarded unit prices for the 50 most-bid items on Kentucky public projects, from winning bids in agency bid tabulations.

Cost by state › Kentucky

ItemPerMedianMiddle halfWinning bids
Leveling & Wedging PG64-22ton$112.81$95.12 – $126.001,038
CL2 Asph Surf 0.38D PG64-22ton$116.97$98.00 – $132.00954
Pave Marking-thermo Stop BAR-24INlinear foot$13.82$10.29 – $15.00808
Portable Changeable Message Signeach$1,500$800.00 – $3,710647
Pave Striping-perm PAINT-4 inlinear foot$0.26$0.2 – $0.33622
DGA Baseton$50.00$42.22 – $60.00604
Edgeline Rumble Stripslinear foot$0.26$0.2 – $0.393548
Pave Marking-thermo Curv Arroweach$120.00$110.00 – $135.00493
Pave STRIPING-THERMO-6 in Wlinear foot$1.25$1.10 – $1.35458
Pave STRIPING-THERMO-6 in Ylinear foot$1.21$1.08 – $1.35439
Pave Striping-perm PAINT-6 inlinear foot$0.3$0.26 – $0.34431
Concrete-class acubic yard$1,168$944.34 – $1,700394
Arrow Paneleach$565.98$300.00 – $1,196369
Asphalt Seal Aggregateton$225.18$130.09 – $504.84322
Asphalt Seal Coatton$1,200$972.70 – $1,920314
Steel Reinforcementpound$2.00$1.71 – $2.80310
Base Failure Repairsquare yard$93.69$66.46 – $135.00304
CL2 Asph Base 1.00D PG64-22ton$134.38$109.93 – $178.50289
Edge Keylinear foot$50.00$28.75 – $69.17281
Pave Marking-thermo Cross-hatchsquare foot$5.95$4.95 – $7.00255
Armored Edge for Concretelinear foot$110.00$90.00 – $150.00238
Guardrail-steel W Beam-s Facelinear foot$35.45$31.21 – $43.15224
Delineator for Guardrail BI Directional Whiteeach$15.36$14.92 – $16.99221
Roadway Excavationcubic yard$35.00$19.96 – $56.25197
Trenching and Backfillinglinear foot$11.89$8.16 – $15.02194
Guardrail Terminal Section NO 1each$93.43$85.00 – $101.57193
Seeding and Protectionsquare yard$0.75$0.5 – $1.09187
Maintenance Fertilizerton$1,500$1,250 – $1,800184
Temp. Silt Fencelinear foot$3.00$2.00 – $4.00183
Erosion Control Blanketsquare yard$2.88$2.05 – $4.05182
Initial Fertilizerton$1,500$1,240 – $1,800182
Silt Trap Type Beach$235.66$140.00 – $350.00181
Silt Trap Type Ceach$220.00$125.00 – $312.77179
Temp Seeding and Protectionsquare yard$0.39$0.305 – $0.48175
Law Enforcement Officerhour$95.55$80.00 – $105.00172
Agricultural Limestoneton$95.00$85.00 – $120.00171
Detectable Warningssquare foot$50.00$43.99 – $64.64170
Remove Guardraillinear foot$4.25$3.22 – $5.00167
Loop Wirelinear foot$0.315$0.3 – $1.05120
Embankment in Placecubic yard$34.00$16.00 – $62.4898
Remove Pavement Markereach$10.00$6.70 – $15.0093
Remove Signeach$100.00$86.70 – $210.0085
Remove Pipelinear foot$30.00$17.82 – $58.7582
Pavement Marking Removalsquare foot$7.21$3.67 – $11.5031
Remove Curb and Gutterlinear foot$16.24$12.75 – $24.0030
Temporary Silt Fencelinear foot$2.69$2.01 – $3.1624
Tubular Markerseach$119.00$88.16 – $143.0019
Remove Fencelinear foot$9.67$6.69 – $20.0018
Topsoil Furnished and Placedcubic yard$99.64$80.92 – $125.0015
Approach Slabsquare yard$605.00$561.67 – $685.0015