Construction unit costs in California

Median awarded unit prices for the 53 most-bid items on California public projects, from winning bids in agency bid tabulations.

Cost by state › California

ItemPerMedianMiddle halfWinning bids
Hot MIX Asphalt (Type A)ton$230.00$150.00 – $539.26694
Tack Coatton$1,100$750.00 – $2,100677
Temporary Drainage Inlet Protectioneach$277.97$200.00 – $400.00641
Pavement Marker (Retroreflective)each$7.50$5.00 – $13.00634
6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)linear foot$1.45$1.05 – $2.50586
Roadside Sign - One Posteach$500.00$400.00 – $700.00519
Furnish Single Sheet Aluminum Sign (0.063"-UNFRAMED)square foot$18.00$14.00 – $24.48514
Treated Wood Wastepound$1.00$0.5 – $2.00501
Temporary Fiber Rolllinear foot$6.00$4.80 – $8.12484
Thermoplastic Pavement Marking (Enhanced Wet Night Visibility)square foot$10.00$6.25 – $15.00480
Stationary Impact Attenuator Vehicleday$645.00$371.25 – $1,300478
Remove Pavement Markereach$2.10$1.05 – $5.00444
Furnish Single Sheet Aluminum Signsquare foot$19.50$14.30 – $26.00441
Roadway Excavationcubic yard$140.00$70.00 – $245.00427
Remove Thermoplastic Traffic Stripelinear foot$1.20$0.6 – $2.50414
Remove Thermoplastic Pavement Markingsquare foot$5.00$3.00 – $10.00396
Furnish Single Sheet Aluminum Sign (0.080"-UNFRAMED)square foot$17.00$14.00 – $21.35389
8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility)linear foot$2.25$1.75 – $4.00357
Class 2 Aggregate Base (Cy)cubic yard$169.63$103.17 – $300.00354
Channelizer (Surface Mounted)each$60.00$48.00 – $80.00322
Temporary Barrier Systemlinear foot$40.00$24.50 – $60.00321
Remove Roadside Signeach$150.00$118.50 – $221.55307
Miscellaneous Iron and Steelpound$5.00$3.50 – $7.00306
Portable Changeable Message Sign (Ea)each$4,000$2,070 – $7,500305
Temporary Construction Entranceeach$5,000$3,500 – $7,500290
Remove Guardraillinear foot$11.84$8.00 – $20.00288
Roadside Sign - Two Posteach$950.00$700.00 – $1,210274
Compost (Cy)cubic yard$103.75$73.95 – $175.28271
Structural Concrete, Drainage Inletcubic yard$4,308$3,224 – $5,840262
Move-in/Move-out (Erosion Control)each$1,145$800.00 – $1,846260
Temporary Traffic Stripe (Paint)linear foot$1.00$0.5 – $2.00247
Temporary High-visibility Fencelinear foot$7.00$5.00 – $10.70236
Remove Culvert (Lf)linear foot$65.00$30.00 – $110.00236
Wood Mulchcubic yard$112.00$75.00 – $204.06229
Rubberized Hot MIX Asphalt (Gap Graded)ton$176.00$149.99 – $230.00228
Detectable Warning Surfacesquare foot$54.50$41.00 – $70.00226
Shoulder Backington$83.06$58.95 – $150.75222
Vegetation Control (Minor Concrete)square yard$110.00$85.00 – $150.00209
Type III Barricadeeach$135.00$100.00 – $200.00175
Temporary Silt Fencelinear foot$6.00$4.06 – $9.25127
Remove Concrete (Curb and Gutter)linear foot$32.00$16.75 – $55.00105
Structural Concrete, Bridgecubic yard$3,157$2,100 – $5,92581
Remove Fencelinear foot$11.50$7.70 – $24.0075
Unclassified Excavationcubic yard$195.00$124.00 – $585.5039
Structural Concretecubic yard$1,950$1,125 – $4,35327
Changeable Message Signeach$2,602$2,400 – $4,14124
Traffic Coneeach$30.00$14.88 – $50.0020
Structure Excavationcubic yard$250.00$128.50 – $375.0019
Structural Steelpound$20.00$10.00 – $30.1218
Remove Signeach$75.00$56.00 – $150.0017
6" Thermoplastic Traffic Stripelinear foot$2.00$1.23 – $3.2515
Embankmentcubic yard$96.66$44.25 – $162.5012
Rock Excavationcubic yard$82.50$63.25 – $196.2512