| Mobilization | lpsm | 58 | — | $80,000 | $500.00 – $5,900,000 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Contractor Testing | lpsm | 51 | — | $46,860 | $1,328 – $350,000 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| General Labor | hour | 44 | $57.50 | $66.00 | $13.00 – $132.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Construction Schedule | lpsm | 39 | $8,500 | $7,150 | $400.00 – $50,000 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Temporary Traffic Control, Flagger | hour | 38 | $56.55 | $63.00 | $15.00 – $69.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Fog Seal, Emulsified Asphalt Grade Css-1 Or Css-1H, Ss-1 Or Ss-1H | ton | 35 | $500.00 | $700.00 | $3.75 – $1,637 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Blotter | ton | 34 | $50.00 | $80.00 | $9.00 – $500.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Temporary Traffic Control, Construction Sign | square foot | 34 | $14.50 | $19.00 | $1.00 – $54.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Tack Coat Grade Css-1, Css-1H, Ss-1, Or Ss-1H | ton | 31 | $690.00 | $720.00 | $260.00 – $2,800 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Temporary Traffic Control, Cone | each | 28 | $19.00 | $18.00 | $0.35 – $120.00 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Soil Erosion Control, Silt Fence | linear foot | 28 | $5.00 | $5.50 | $1.35 – $20.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Special labor, hired survey service | hour | 27 | $160.00 | $165.00 | $90.00 – $300.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Temporary Traffic Control, Pilot Car | hour | 26 | $69.00 | $82.00 | $30.00 – $93.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Special labor, hired technical service | hour | 26 | $112.50 | $120.00 | $30.00 – $186.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Antistrip Additive, Type 3 | ton | 26 | $250.00 | $325.00 | $50.00 – $1,200 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Motor Grader, 12 Foot Minimum Blade | hour | 25 | $140.00 | $169.00 | $86.74 – $245.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Temporary Traffic Control, Drum | each | 25 | $50.00 | $38.00 | $0.15 – $500.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Roadway Aggregate, Method 2 | ton | 25 | $35.20 | $27.00 | $7.00 – $75.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Soil Erosion Control, Sediment Log | linear foot | 24 | $6.81 | $11.00 | $3.50 – $26.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Roadway Excavation | cubic yard | 21 | $14.00 | $20.00 | $7.40 – $40.00 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Pavement marking, type b | gallon | 20 | $46.50 | $38.00 | $18.37 – $215.00 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Survey And Staking, Drainage Structure | each | 20 | $871.00 | $850.00 | $140.00 – $2,400 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Sign System | each | 19 | $350.00 | $350.00 | $265.00 – $800.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Clearing AND Grubbing | acre | 19 | — | $2,000 | $560.00 – $28,000 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Watering For Dust Control | lpsm | 18 | $48,818 | $27,720 | $10,000 – $200,000 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Remove of structure and obstructions | lpsm | 18 | — | $16,000 | $700.00 – $370,000 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Temporary traffic control, pavement marking | linear foot | 17 | — | $1.00 | $0.09 – $4.75 | Jul 18, 2012, Open bid tab, CA PFH 112-1(2) ↗ |
| Materials Transfer Vehicle | lpsm | 17 | $40,000 | $42,000 | $500.00 – $350,000 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Survey And Staking, Grade Finishing Stakes | station | 17 | $140.00 | $130.00 | $30.00 – $600.00 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Placed Riprap, Class 3 | cubic yard | 17 | $80.00 | $75.00 | $49.56 – $200.00 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Remove And Reset Sign | each | 17 | $300.00 | $180.00 | $77.50 – $800.00 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Remove of pipe culvert | each | 16 | $1,182 | $225.00 | $225.00 – $5,800 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Slope, Reference, And Clearing And Grubbing Stake | station | 16 | $285.00 | $150.00 | $71.43 – $3,000 | Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗ |
| Subexcavation | cubic yard | 16 | $21.75 | $31.00 | $5.00 – $135.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Temporary Traffic Control, Barricade Type 3 | each | 16 | $123.72 | $115.00 | $45.00 – $400.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Placed Riprap, Class 2 | cubic yard | 16 | $97.50 | $48.00 | $48.00 – $300.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Backhoe | hour | 16 | $117.25 | $115.00 | $60.00 – $215.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Remove of sign | each | 16 | $163.78 | $250.00 | $50.00 – $1,000 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| Temporary Traffic Control, Warning Light Type B | each | 15 | $106.00 | $106.00 | $0.15 – $750.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |
| 24 inch pipe culvert | linear foot | 15 | $106.00 | $106.00 | $47.00 – $350.00 | Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗ |