3,199 winning bid prices read from 65 source documents, 2000–2013. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › FHWA Federal Lands Highway

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Mobilizationlpsm58—$80,000$500.00 – $5,900,000Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Contractor Testinglpsm51—$46,860$1,328 – $350,000Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
General Laborhour44$57.50$66.00$13.00 – $132.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Construction Schedulelpsm39$8,500$7,150$400.00 – $50,000Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Temporary Traffic Control, Flaggerhour38$56.55$63.00$15.00 – $69.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Fog Seal, Emulsified Asphalt Grade Css-1 Or Css-1H, Ss-1 Or Ss-1Hton35$500.00$700.00$3.75 – $1,637Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Blotterton34$50.00$80.00$9.00 – $500.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Temporary Traffic Control, Construction Signsquare foot34$14.50$19.00$1.00 – $54.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Tack Coat Grade Css-1, Css-1H, Ss-1, Or Ss-1Hton31$690.00$720.00$260.00 – $2,800Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Temporary Traffic Control, Coneeach28$19.00$18.00$0.35 – $120.00Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Soil Erosion Control, Silt Fencelinear foot28$5.00$5.50$1.35 – $20.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Special labor, hired survey servicehour27$160.00$165.00$90.00 – $300.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Temporary Traffic Control, Pilot Carhour26$69.00$82.00$30.00 – $93.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Special labor, hired technical servicehour26$112.50$120.00$30.00 – $186.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Antistrip Additive, Type 3ton26$250.00$325.00$50.00 – $1,200Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Motor Grader, 12 Foot Minimum Bladehour25$140.00$169.00$86.74 – $245.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Temporary Traffic Control, Drumeach25$50.00$38.00$0.15 – $500.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Roadway Aggregate, Method 2ton25$35.20$27.00$7.00 – $75.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Soil Erosion Control, Sediment Loglinear foot24$6.81$11.00$3.50 – $26.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Roadway Excavationcubic yard21$14.00$20.00$7.40 – $40.00Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Pavement marking, type bgallon20$46.50$38.00$18.37 – $215.00Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Survey And Staking, Drainage Structureeach20$871.00$850.00$140.00 – $2,400Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Sign Systemeach19$350.00$350.00$265.00 – $800.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Clearing AND Grubbingacre19—$2,000$560.00 – $28,000Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Watering For Dust Controllpsm18$48,818$27,720$10,000 – $200,000Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Remove of structure and obstructionslpsm18—$16,000$700.00 – $370,000Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Temporary traffic control, pavement markinglinear foot17—$1.00$0.09 – $4.75Jul 18, 2012, Open bid tab, CA PFH 112-1(2) ↗
Materials Transfer Vehiclelpsm17$40,000$42,000$500.00 – $350,000Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Survey And Staking, Grade Finishing Stakesstation17$140.00$130.00$30.00 – $600.00Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Placed Riprap, Class 3cubic yard17$80.00$75.00$49.56 – $200.00Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Remove And Reset Signeach17$300.00$180.00$77.50 – $800.00Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Remove of pipe culverteach16$1,182$225.00$225.00 – $5,800Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Slope, Reference, And Clearing And Grubbing Stakestation16$285.00$150.00$71.43 – $3,000Dec 20, 2012, Open bid tab, CA FTNP JOTR 11(3) ↗
Subexcavationcubic yard16$21.75$31.00$5.00 – $135.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Temporary Traffic Control, Barricade Type 3each16$123.72$115.00$45.00 – $400.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Placed Riprap, Class 2cubic yard16$97.50$48.00$48.00 – $300.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Backhoehour16$117.25$115.00$60.00 – $215.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Remove of signeach16$163.78$250.00$50.00 – $1,000Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
Temporary Traffic Control, Warning Light Type Beach15$106.00$106.00$0.15 – $750.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗
24 inch pipe culvertlinear foot15$106.00$106.00$47.00 – $350.00Jul 31, 2013, Open bid tab, CA FLAP 312(2) ↗