Waterproofing (Substructure-second Method) Section Totals: $1,989,744.50 Life Cycle Costs: Section Total with Lcc: $1,989,744.50
One winning unit price
Single 1 winning bid$40.00/ SY
- Letting
- Jan 14, 2014
- Quantity
- 28.2 SY
- Agency
- SCDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- Jan 14, 2014
- Quantity
- 28.2 SY
- Contractor
- United Infrastructure Group, Inc.
- Winning price
- $40.00 / SY
What’s behind $40.00
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per SY, ranked by how much evidence each has.
- Waterproofing (Substructure-second Method)$65.00272 bids
- Waterproofing (Second Method)$50.0041 bids
- Substructure Waterproofing Membrane$13771 bids
- Waterproofing - Epoxy Resin Type EP-3B/EP-3T Substructure$1244 bids
- Bridge Deck Patching, Full Depth 002 Section Totals: $3,033,147.84 $3,392,440.48 $3,495,760.20$7753 bids
- Bridge Deck Patching, Full Depth 002 Section Totals: $3,623,640.58 $3,692,640.39$6003 bids
- Waterproofing$45.00312 bids
- Waterproofing (Bridge Deck)$41.00108 bids
1 observation
1 agency in 1 state · lettings Jan 14, 2014
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|