Underground Utility Adjustment (Water)
Median lump-sum amount
Moderate 7 winning bids≈$55,000per contractLow confidence
- Winning bids
- 7
- Source documents
- 6
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 7 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Mar 28, 2025
- Quantity
- 1 LS
- Contractor
- Vulcan Materials Asphalt AND Construction,
- Winning price
- $184,000 / LS
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $55,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 7 bids charted, so you can see clusters and outliers.
7 observations
Agency, county, letting date, quantity and the price as printed.
6 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other water items priced per LS, ranked by how much evidence each has.
- Water Pollution Control Program$2,000792 bids
- Develop Water Supply$14,200494 bids
- Erosion Control and Water Pollution Prevention$15,875180 bids
- Rem Old Str Ovr Water Min Debr$35,000162 bids
- Water Meter Charges$20,00072 bids
- Temporary Water Service$25,65061 bids
- Irrigation Water Service Charges$11,58646 bids
- Water System$70,95037 bids
7 observations
1 agency in 1 state · lettings Sep 26, 2008 – Mar 28, 2025
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.