Tie-in (Complete)(24")
Median winning unit price
Very thin 2 winning bids≈$16,117/ EALow confidence
- Winning bids
- 2
- Source documents
- 2
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- TxDOT (San Antonio district) · Bexar, Texas
- Letting
- Jul 1, 2026
- Quantity
- 2 EA
- Contractor
- PULICE CONSTRUCTION, INC.
- Winning price
- $22,672 / EA
What’s behind $16,117
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
2 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other other items priced per EA, ranked by how much evidence each has.
- Drilled Tie Bars$10.001,378 bids
- Dr Structure, 24 Inch DIA$1,4521,052 bids
- Lane Tie, Epoxy Anchored$8.001,042 bids
- 24" Roadway Pipe End Treatment, Class 1$800982 bids
- Threaded Tie Bar Assembly, Epoxy Coated$40.00807 bids
- Frame W/2GRTS 840.24 STD$834377 bids
- 24\'' RC Safety Apron$1,221294 bids
- Pipe End Section, Diameter 24 in.$1,200289 bids
2 observations
1 agency in 1 state · lettings Apr 8, 2026 – Jul 1, 2026
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.