Skip to content
Paving424B693M

Superpave Bituminous Concrete Lower Binder Layer, Widening,37.5mm Maximum Aggregate Size Mix, Esal Range C/D

Unit MTONLettings Apr 27, 2001 – Jan 11, 20021 agency in 1 state

Median winning unit price

Thin 3 winning bids

≈$95.00/ MTONLow confidence

Treat this as a rough guide. Only 3 winning bids on record — we want 12 or more before calling a figure a median.
Winning bids
3
Source documents
2

Winning bids only, as awarded. Nominal dollars. How we compute this

3Winning bids
1Agency
Apr 27, 2001 – Jan 11, 2002Letting period

Where the number comes from

One of the 3 winning bids behind that median, with the agency’s own document one click away.

Agency
ALDOT · Alabama
Letting
Jan 11, 2002
Quantity
33 MTON
Contractor
Walker Patton Company, Inc.
Winning price
$95.00 / MTON
Open bid tabcontract 20020111056 · ljan1102.pdf

What’s behind $95.00

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 3 bids charted, so you can see clusters and outliers.

  • 3 observations

    Agency, county, letting date, quantity and the price as printed.

  • 2 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

3 observations

1 agency in 1 state · lettings Apr 27, 2001 – Jan 11, 2002

LettingAgency · CountyQuantityUnit priceSource document
3 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.